Loading...
HomeMy WebLinkAbout2018 Down Cape EmailMurphy, Bruce From: Sent: To: Cc: Subject: Murphy, Bruce Wednesday, September 12, 2018 11:44 AM 'Joe M. Callahan'; Daniel A. Ojala PE, PLS pa lmadenta l@ me.com RE: Condo # Palma DCE#16-275 Hi I have a meeting on Thursday and Monday, and you are not available on Friday, I need to meet with Dan and you first. Next opening for meeting is Wed Sept 19 at 10:30 at the Health office, can you both attend? Bruce From: Joe M. Callahan Ima ilto:jmca llaha n@globa lpdc.com] Sent: Wednesday, September 12,2018 9:51 AM To: Daniel A. Ojala PE, PLS Cc: Murphy, Bruce; palmadenta l@ me.com Subject: Re: Condo # Palma DCE#16-275 Thonk you Don. Bruce, let us know if you need onything else. And when is o good time for me to come down io see you. I con be there iomorrow of ony time. Fridoy I con'1, bui if you don't need onything else from us ond we just need to pick up the plons ond submit to the bldg dept I con send someone to do thot. Thonks, Joe Collohon Sent f rom my iPhone On Sep 1 1, 2018, ot l0:2] AM, Doniel A. Ojolo PE, PLS <dor.vncope@dow,ncope.conr> wrote: Bru ce: We were osked lo review ihe septic design flow for Phose I of the condominium, Polmo Denlol is the proposed tenont. The exisiing building is going to be 3,947 sf ond hove between 7 ond l5 oc cu ponls. We reviewed the woter use of Polmo Dentol's #37 lndustriol Pork Rd in Plymouth, which owner Bob Polmo describes os o much more intensive use thon ihe proposed focility from o woter use stondpoint. 1 They ore shifting more to digilol printing ond owoy from the older more woter intensive methods. so the woter use of 517 gpd for the 9000 sf Plymouih focility would reduce by more thon the 9000 sf to 3947 sf rotio which would be 229 gpd octuol flow, we feel the flow will be more occurotely i 50 gpd ocluol flow, which would be o 300 gpd design flow. The existing system is copoble of hondling o 364 gpd design flow bosed on the Ieoching size os shown on pqge 5 of 6 of the site plon set. A cross check is on overoge of I 1 persons occuponcy x l5 gpd/person = ,I65 gpd design flow, plus o smoll qmount for sinks. Also, bosed on office flow, ihe design flow would be 296 gpd os shown on the plon. Sink droins will be protected by sedimenl trops. The site is not in o Zone ll or Nitrogen Sensitive Areo, so there is not o limilolion on design flow beyond the existing opproved copocity, so while noi onticipoted io be required, o design flow upgrode could be performed of ony iime if determined 1o be needed. Bosed on the obove observolions ond colculotions, lfeel the existing septic syslem is odequote for the proposed use. Pleose do not hesitote to contoct me wiih ony questions Daniel A. Oiala PE, PLS down cape engineering, inc 939 Main St. Yarmouthport, MA 1-508-352-4541 x105 1-508-362-9880 fax downcape@downcape.com This Electronic Message contains information from the engineering firm of down cape engineering, inc., which may be privileged. The information is intended to be for the use of the addressee only. If you are not the addressee, note that any disclosure, copy, distribution or use of the contents of this message is prohibited. <image 1 jpeg> <16-2'75 CONDO SITE PLAN 11-2-l7.pdf> <PALMA DENTAL PERMIT SET.pdD <16-27 5 Bornstein 6 page site plan revised 12-6-17.pdf> <JR Smith 871 Solids lnterceptor Spec Sheet.pdD 2