MONITORING REPORT
DEP File Number: SE 83-2169
Project Address: 64 Mill Lane, Yarmouth
Map, Parcel: Map: 121, Parcel: 6
Date of Field Assessment: 10/8/25
Assessment Period: December 2024– October 2025
Project Documents: - Existing Conditions Plan of Land prepared by Down Cape
Engineering, signed and stamped by Daniel Ojala, PE, PLS and dated
9/5/2018
- Restoration Plan prepared by Crawford Land Management and
dated
9/28/2018
Permit History
OOC Date of Issuance: 10/01/2018
OOC Recording Information: Book: 31596, Page: 170 recorded on 10/15/2018
COC Date of Issuance: 01/09/2023
COC Recording Information: Book: 35607, Page: 111 recorded on 01/24/2023
Ongoing Conditions: Follow up management of phragmites and seeding for bank
Stability can occur for up to 3 years, annual monitoring
reports to be submitted if any action is taken.
Project Description
The project was approved for invasive species management and ecological restoration. The
approved work is divided and managed within 3 zones; Zone 1 includes management of
approximately 11,950 sqft of Phragmites, Zone 2 includes management of approximately 3,500
sqft of sporadic Phragmites within marsh vegetation, Zone 3 includes installation of supplemental
native plantings within approximately 12,400 sqft of mixed invasive and native upland vegetation.
The resource areas present include salt marsh, bordering vegetated wetland, land subject to
coastal storm flowage and associated buffer zones.
Project Activities Completed during Assessment Period
August 19, 2025 – Assessment and treatment of Phragmites
September 25, 2025 – Site visit to assess invasive species management
October 1, 2025 – Assessment and treatment of Phragmites
Assessment of Current Site Conditions
At the time of assessment, it was concluded that ongoing maintenance and effective treatment
strategies have been mostly successful. No re-sprouting Phragmites (Phragmites australis) were
observed in any zones of the project area. This lack of regrowth indicates both effective and
successful control of this invasive species. Monitoring of the project area, along with minimal
maintenance using effective treatment methods should continue to ensure limited regrowth and
spread of Phragmites.
Anticipated Activities to be Completed Next Monitoring Period
• Continuing maintenance visits to control Phragmites.
Representative Project Area Photographs
Healthy upland vegetation in Zones 1 and 2 with no incurring Phragmites. August 2025.
Another photo facing the southwest showing healthy vegetation with no visible Phragmites. August
2025.
Facing the Grize residence highlighting the marsh area in the foreground. Sections of all project
zones pictured with no visible Phragmites. September 2025.
All zones of the project area are shown here with healthy native marsh and upland vegetation. No
visible Phragmites. September 2025.