Loading...
HomeMy WebLinkAboutEngineer Report 10/30/25 October 30, 2025 Mr. Mark Grylls Building Commissioner Town of Yarmouth 1146 Route 28 South Yarmouth MA 02664 McKENZI E ENGINEERING RE: Egress Inspection, Leonessa, 43 Route 6A, Yarmouthport CONSULTANTS structurnl•:c,',I tnvir nrnsmsJ atu WA Dear Mr. Grylls, ,`p McKenzie Engineering Consultants, Inc. completed an egress inspection of the exterior egress stairway for the second floor at the building located a 43 Route 6A in Yarmouthport known as Leonessa as required by the 10`h edition of the Massachusetts Building Code. wb � . The wood framed landing and stairway was inspected during the site visit. The landing and stairway is in structurally seviceable condition with no items requiring any repair actions at this time. Based on the inspection,we hereby certify that the exterior egress components at 43 Route 6A are structurally adequate to perform the functions for what they were designed to in accordance with the standards of public safety at the time of original construction and in accordance with Section 1001.3.2 of the 10`h edition of the Massachusetts Building Code. If there are any questions on this matter, feel free to contact me at any time. `111k Of Ygss' Since RK A. cyG CKENZIE " No.39068 " q9 Mark • . McKenzie, P.E. Pres., McKenzie Engineering Consultants, Inc. cc. Leonessa P.O.Box 1879 44 Underpass Rd•Unit 2 Brewster,MA02631 t 774,353.2144