Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
792-43
Report of Grout Compressive Strength ASTM C109 Project Name: Placement Location: Time Cast: Cubes Made By: Date Received:Date Cast: Design (psi): Client: Air Temp (ºF): Grout Temp (ºF) (C-1064): Supplier: Mixer Number: Ticket Number: Batch Number: Aggregate Size (in): Cube Designation Area(In)²Date Of Test Age (days) Load (kips) Strength (psi) Project Number: Minimum (ºF)Maximum (ºF) 25-0468Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services ANCHOR #331, 332, 333, 334, 431, 434, 73, 125, 126 AND 127 9:26 11/3/202510/31/2025 4000 59 Wright-Pierce Temperatures Client Contract Number: General Contractor:NICKERSON PLACEMENT INFORMATION Placement Method: INITIAL CURING CONDITIONS TEST RESULTS DELIVERY INFORMATION Admixtures: * Test Cubes Not Made By S. W. Cole Personnel Slump (in) (C-143): Placement Vol. (yd³): Cure Type Product Name: 11/4/2025792-43A 4Lab 11/7/2025792-43B 4.08 7 13.0 3180Lab 11/14/2025792-43C 14Lab 11/28/2025792-43D 28Lab 11/28/2025792-43E 28Lab 792-43F Lab Remarks:SPECIFIC GRAVITY: 1.93 58 Norfolk Ave Suite 1A, South Easton, MA 02375 • Tel (508) 822-6934 • www.swcole.com Reviewed By