Loading...
HomeMy WebLinkAbout792-29 (3)Report of Grout Compressive Strength ASTM C109 Project Name: Placement Location: Time Cast: Cubes Made By: Date Received:Date Cast: Design (psi): Client: Air Temp (ºF): Grout Temp (ºF) (C-1064): Supplier: Mixer Number: Ticket Number: Batch Number: Aggregate Size (in): Cube Designation Area(In)²Date Of Test Age (days) Load (kips) Strength (psi) Project Number: Minimum (ºF)Maximum (ºF) 25-0468Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services ANCHOR # 121, 143, 144, 145, 146, 147 10/15/202510/14/2025 4000 57 Wright-Pierce Temperatures Client Contract Number: General Contractor:NICKERSON PLACEMENT INFORMATION Placement Method: INITIAL CURING CONDITIONS TEST RESULTS DELIVERY INFORMATION Admixtures: * Test Cubes Not Made By S. W. Cole Personnel Slump (in) (C-143): Placement Vol. (yd³): Cure Type Product Name: 10/17/2025792-29A 4.08 3 11.7 2870Lab 10/21/2025792-29B 4.06 7 18.2 4480Lab 10/28/2025792-29C 4.06 14 18.8 4630Lab 11/12/2025792-29D 4.06 29 30.8 7580Lab 11/12/2025792-29E 4.06 29 29.4 7240Lab 792-29F Lab Remarks:SPECIFIC GRAVITY 1.91 58 Norfolk Ave Suite 1A, South Easton, MA 02375 • Tel (508) 822-6934 • www.swcole.com Reviewed By