Loading...
HomeMy WebLinkAbout792-9 (3)Report of Grout Compressive Strength ASTM C109 Project Name: Placement Location: Time Cast: Cubes Made By: Date Received:Date Cast: Design (psi): Client: Air Temp (ºF): Grout Temp (ºF) (C-1064): Supplier: Mixer Number: Ticket Number: Batch Number: Aggregate Size (in): Cube Designation Area(In)²Date Of Test Age (days) Load (kips) Strength (psi) Project Number: Minimum (ºF)Maximum (ºF) 25-0468Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services 9/18/20259/17/2025 4000 Wright-Pierce Temperatures Client Contract Number: General Contractor:NICKERSON PLACEMENT INFORMATION Placement Method: INITIAL CURING CONDITIONS TEST RESULTS DELIVERY INFORMATION Admixtures: * Test Cubes Not Made By S. W. Cole Personnel Slump (in) (C-143): Placement Vol. (yd³): Cure Type Product Name: 9/22/2025792-9A 4.04 5 14.2 3520Lab 9/24/2025792-9B 4.04 7 21.2 5240Lab 10/1/2025792-9C 4.02 14 31.5 7840Lab 10/15/2025792-9D 4.08 28 35.0 8580Lab 10/15/2025792-9E 4.04 28 33.0 8170Lab 11/12/2025792-9F 4.06 56 42.7 10520Lab Remarks: 58 Norfolk Ave Suite 1A, South Easton, MA 02375 • Tel (508) 822-6934 • www.swcole.com Reviewed By