Loading...
HomeMy WebLinkAbout792-34 (2)Report of Grout Compressive Strength ASTM C109 Project Name: Placement Location: Time Cast: Cubes Made By: Date Received:Date Cast: Design (psi): Client: Air Temp (ºF): Grout Temp (ºF) (C-1064): Supplier: Mixer Number: Ticket Number: Batch Number: Aggregate Size (in): Cube Designation Area(In)²Date Of Test Age (days) Load (kips) Strength (psi) Project Number: Minimum (ºF)Maximum (ºF) 25-0468Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services SOIL ANCHORS - 247, 248, 249, 250, 251, 176, 192, 193 9:50 10/22/202510/21/2025 4000 64 Wright-Pierce Temperatures Client Contract Number: General Contractor:NICKERSON PLACEMENT INFORMATION Placement Method: INITIAL CURING CONDITIONS TEST RESULTS DELIVERY INFORMATION Admixtures: * Test Cubes Not Made By S. W. Cole Personnel Slump (in) (C-143): Placement Vol. (yd³): Cure Type Product Name: 10/24/2025792-34A 4.12 3 28.5 6900Lab 10/28/2025792-34B 4.08 7 29.1 7130Lab 11/4/2025792-34C 4.10 14 35.9 8760Lab 11/18/2025792-34D 4.14 28 51.6 12470Lab 11/18/2025792-34E 4.08 28 45.1 11050Lab 792-34F Lab Remarks:SPECIFIC GRAVITY 1.9 58 Norfolk Ave Suite 1A, South Easton, MA 02375 • Tel (508) 822-6934 • www.swcole.com Reviewed By