Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
792-63
Report of Grout Compressive Strength ASTM C109 Project Name: Placement Location: Time Cast: Cubes Made By: Date Received:Date Cast: Design (psi): Client: Air Temp (ºF): Grout Temp (ºF) (C-1064): Supplier: Mixer Number: Ticket Number: Batch Number: Aggregate Size (in): Cube Designation Area(In)²Date Of Test Age (days) Load (kips) Strength (psi) Project Number: Minimum (ºF)Maximum (ºF) 25-0468Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services ANCHOR #60, 61, 62, 63, 64, 65 12/2/202512/1/2025 4000 59 Wright-Pierce Temperatures Client Contract Number: General Contractor:CDM SMITH PLACEMENT INFORMATION Placement Method: INITIAL CURING CONDITIONS TEST RESULTS DELIVERY INFORMATION Admixtures: * Test Cubes Not Made By S. W. Cole Personnel Slump (in) (C-143): Placement Vol. (yd³): Cure Type Product Name: 12/4/2025792-63A 4.04 3 13.4 3310Lab 12/8/2025792-63B 7Lab 12/15/2025792-63C 14Lab 12/29/2025792-63D 28Lab 12/29/2025792-63E 28Lab 792-63F Lab Remarks:SPECIFIC GRAVITY: 1.93 58 Norfolk Ave Suite 1A, South Easton, MA 02375 • Tel (508) 822-6934 • www.swcole.com Reviewed By