Loading...
HomeMy WebLinkAbout792-41 (1)Report of Grout Compressive Strength ASTM C109 Project Name: Placement Location: Time Cast: Cubes Made By: Date Received:Date Cast: Design (psi): Client: Air Temp (ºF): Grout Temp (ºF) (C-1064): Supplier: Mixer Number: Ticket Number: Batch Number: Aggregate Size (in): Cube Designation Area(In)²Date Of Test Age (days) Load (kips) Strength (psi) Project Number: Minimum (ºF)Maximum (ºF) 25-0468Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services SOIL ANCHOR #420, 423, 421, 429, 422, 430 9:40 10/31/202510/30/2025 4000 56 Wright-Pierce Temperatures Client Contract Number: General Contractor:NICKERSON PLACEMENT INFORMATION Placement Method: INITIAL CURING CONDITIONS TEST RESULTS DELIVERY INFORMATION Admixtures: * Test Cubes Not Made By S. W. Cole Personnel Slump (in) (C-143): Placement Vol. (yd³): Cure Type Product Name: 11/3/2025792-41A 4.04 4 29.5 7310Lab 11/6/2025792-41B 4.04 7 33.7 8350Lab 11/13/2025792-41C 4.08 14 38.3 9370Lab 12/3/2025792-41D 4.02 34 54.6 13580Lab 12/3/2025792-41E 4.08 34 46.2 11330Lab 12/3/2025792-41F 4.04 34 52.0 12870Lab Remarks:SPECIFIC GRAVITY 1.91 58 Norfolk Ave Suite 1A, South Easton, MA 02375 • Tel (508) 822-6934 • www.swcole.com Reviewed By