Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
792-59
Report of Grout Compressive Strength ASTM C109 Project Name: Placement Location: Time Cast: Cubes Made By: Date Received:Date Cast: Design (psi): Client: Air Temp (ºF): Grout Temp (ºF) (C-1064): Supplier: Mixer Number: Ticket Number: Batch Number: Aggregate Size (in): Cube Designation Area(In)²Date Of Test Age (days) Load (kips) Strength (psi) Project Number: Minimum (ºF)Maximum (ºF) 25-0468Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services SOIL ANCHOR #31, 5, 6, 32, 287, 262, 237 and 212 10:40 11/25/202511/24/2025 4000 56 Wright-Pierce Temperatures Client Contract Number: General Contractor:NICKERSON PLACEMENT INFORMATION Placement Method: INITIAL CURING CONDITIONS TEST RESULTS DELIVERY INFORMATION Admixtures: * Test Cubes Not Made By S. W. Cole Personnel Slump (in) (C-143): Placement Vol. (yd³): Cure Type Product Name: 12/1/2025792-59A 4.06 7 27.3 6720Lab 12/1/2025792-59B 4.06 7 35.8 8810Lab 12/8/2025792-59C 14Lab 12/22/2025792-59D 28Lab 12/22/2025792-59E 28Lab 792-59F Lab Remarks:SPECIFIC GRAVITY: 1.92 58 Norfolk Ave Suite 1A, South Easton, MA 02375 • Tel (508) 822-6934 • www.swcole.com Reviewed By