Loading...
HomeMy WebLinkAbout792-52 (2)Report of Grout Compressive Strength ASTM C109 Project Name: Placement Location: Time Cast: Cubes Made By: Date Received:Date Cast: Design (psi): Client: Air Temp (ºF): Grout Temp (ºF) (C-1064): Supplier: Mixer Number: Ticket Number: Batch Number: Aggregate Size (in): Cube Designation Area(In)²Date Of Test Age (days) Load (kips) Strength (psi) Project Number: Minimum (ºF)Maximum (ºF) 25-0468Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services ANCHOR #210, 235, 366, 391, 416, 64, 152, 153, 177 11/17/202511/14/2025 4000 Wright-Pierce Temperatures Client Contract Number: General Contractor:NICKERSON PLACEMENT INFORMATION Placement Method:Pump INITIAL CURING CONDITIONS TEST RESULTS DELIVERY INFORMATION Admixtures: * Test Cubes Not Made By S. W. Cole Personnel Slump (in) (C-143): Placement Vol. (yd³): Cure Type Product Name: 11/19/2025792-52A 4.06 5 14.8 3630Lab 11/21/2025792-52B 4.04 7 15.1 3730Lab 11/28/2025792-52C 4.02 14 21.2 5280Lab 12/12/2025792-52D 28Lab 12/12/2025792-52E 28Lab 792-52F Lab Remarks:SPECIFIC GRAVITY: 1.91 58 Norfolk Ave Suite 1A, South Easton, MA 02375 • Tel (508) 822-6934 • www.swcole.com Reviewed By