Loading...
HomeMy WebLinkAbout792-50 (2)Report of Grout Compressive Strength ASTM C109 Project Name: Placement Location: Time Cast: Cubes Made By: Date Received:Date Cast: Design (psi): Client: Air Temp (ºF): Grout Temp (ºF) (C-1064): Supplier: Mixer Number: Ticket Number: Batch Number: Aggregate Size (in): Cube Designation Area(In)²Date Of Test Age (days) Load (kips) Strength (psi) Project Number: Minimum (ºF)Maximum (ºF) 25-0468Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services ANCHOR # 81, 82, 83, 84, 85, 86, 87, 202, 203, 204, 205, 206, 207, 208 9:55 11/13/202511/12/2025 4000 57 Wright-Pierce Temperatures Client Contract Number: General Contractor:NICKERSON PLACEMENT INFORMATION Placement Method:Pump INITIAL CURING CONDITIONS TEST RESULTS DELIVERY INFORMATION Admixtures: * Test Cubes Not Made By S. W. Cole Personnel Slump (in) (C-143): Placement Vol. (yd³): Cure Type Product Name: 11/17/2025792-50A 4.06 5 18.0 4440Lab 11/19/2025792-50B 4.08 7 19.0 4660Lab 11/26/2025792-50C 4.06 14 19.4 4790Lab 12/10/2025792-50D 28Lab 12/10/2025792-50E 28Lab 792-50F Lab Remarks:SPECIFIC GRAVITY: 1.91 58 Norfolk Ave Suite 1A, South Easton, MA 02375 • Tel (508) 822-6934 • www.swcole.com Reviewed By