Loading...
HomeMy WebLinkAbout792-67Report of Grout Compressive Strength ASTM C109 Project Name: Placement Location: Time Cast: Cubes Made By: Date Received:Date Cast: Design (psi): Client: Air Temp (ºF): Grout Temp (ºF) (C-1064): Supplier: Mixer Number: Ticket Number: Batch Number: Aggregate Size (in): Cube Designation Area(In)²Date Of Test Age (days) Load (kips) Strength (psi) Project Number: Minimum (ºF)Maximum (ºF) 25-0468Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services ANCHOR #135, 112, 136, 88, 65, 42, 43, 66 12:30 12/4/202512/3/2025 4000 63 Wright-Pierce Temperatures Client Contract Number: General Contractor:CDM SMITH PLACEMENT INFORMATION Placement Method: INITIAL CURING CONDITIONS TEST RESULTS DELIVERY INFORMATION Admixtures: * Test Cubes Not Made By S. W. Cole Personnel Slump (in) (C-143): Placement Vol. (yd³): Cure Type Product Name: 12/8/2025792-67A 4.06 5 14.4 3550Lab 12/10/2025792-67B 7Lab 12/17/2025792-67C 14Lab 12/31/2025792-67D 28Lab 12/31/2025792-67E 28Lab 792-67F Lab Remarks:SPECIFIC GRAVITY: 1.92 58 Norfolk Ave Suite 1A, South Easton, MA 02375 • Tel (508) 822-6934 • www.swcole.com Reviewed By