Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
792-69
Report of Grout Compressive Strength ASTM C109 Project Name: Placement Location: Time Cast: Cubes Made By: Date Received:Date Cast: Design (psi): Client: Air Temp (ºF): Grout Temp (ºF) (C-1064): Supplier: Mixer Number: Ticket Number: Batch Number: Aggregate Size (in): Cube Designation Area(In)²Date Of Test Age (days) Load (kips) Strength (psi) Project Number: Minimum (ºF)Maximum (ºF) 25-0468Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services ANCHOR #162, 163, 164, 165, 166 12/8/202512/5/2025 4000 45 Wright-Pierce Temperatures Client Contract Number: General Contractor:CDM SMITH PLACEMENT INFORMATION Placement Method: INITIAL CURING CONDITIONS TEST RESULTS DELIVERY INFORMATION Admixtures: * Test Cubes Not Made By S. W. Cole Personnel Slump (in) (C-143): Placement Vol. (yd³): Cure Type Product Name: 12/9/2025792-69A 4.06 4 17.5 4320Lab 12/12/2025792-69B 7Lab 12/19/2025792-69C 14Lab 1/2/2026792-69D 28Lab 1/2/2026792-69E 28Lab 792-69F Lab Remarks:SPECIFIC GRAVITY: 1.92 58 Norfolk Ave Suite 1A, South Easton, MA 02375 • Tel (508) 822-6934 • www.swcole.com Reviewed By