HomeMy WebLinkAbout6 Miracle Site PlanGENERAL NOTES:
A.) NEITHER DRIVEWAYS NOR PARKING AREAS ARE ALLOWED OVER SEPTIC SYSTEM
UNLESS H-20 COMPONENTS ARE USED.
B.) THE DESIGNER WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UN-
LESS CONSTRUCTED AS SHOWN, ANY CHANGES SHALL BE APPROVED IN WRITING.
C.) CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL
UNDERGROUND AND OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK.
CONSTRUCTION NOTES:
1.) ALL CONSTRUCTION SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE,
TITLE 5, ANDTHE REQUIREMENTS OF THE LOCAL BOARD OF HEALTH.
2.) SEPTIC TANK(S), GREASE TRAP(S), DOSING CHAMBER(S) AND DISTRIBUTION
BOX(ES) SHALL BE SET ON A LEVEL STABLE BASE WHICH HAS BEEN MECHANICALLY
COMPACTED, OR ON A 6 INCH CRUSHED STONE BASE.
3.) SEPTIC TANK(S) SHALL MEET ASTM STANDARD C1127-93 AND SHALL HAVE
AT LEASTTHREE 20" DIAMETER MANHOLES. THE MINIMUM DEPTH FROM THE BOT-
TOM OFTHE SEPTIC TANKTO THE FLOW LINE SHALL BE 48".
4.) SCHEDULE 40 PVC INLET AND OUTLET TEES SHALL EXTEND A MINIMUM OF 6"
ABOVE THE FLOW LINE OF THE SEPTIC TANK AND SHALL BE INSTALLED ON THE
CENTERLINE OF THE TANK DIRECTLY UNDER THE CLEANOUT MANHOLE.
5.) RAISE COVERS OF THE SEPTIC TANK AND DISTRIBUTION BOX WITH PRECAST
CONCRETE WATERTIGHT RISERS OVER INLET AND OUTLET TEES TO WITHIN 6" OF
FINISH GRADE, OR AS APPROVED BY THE LOCAL BOARD OF HEALTH AGENT.
6.) PIPING SHALL CONSIST OF 4" SCHEDULE 40 PVC OR EQUIVALENT. PIPE SHALL
BE LAID ON MINIMUM CONTINUOUS GRADE OF NOT LESS THAN 1%.
7.) DISTRIBUTION LINES FOR SOIL ABSORPTION SYSTEM (AS REQUIRED) SHALL BE
4" DIAMETER SCHEDULE 40 PVC LAID AT 0.005 FT/FT. LINE SHALL BE CAPPED
AT END OR AS NOTED.
8.) OUTLET PIPES FROM DISTRIBUTION BOX SHALL REMAIN LEVEL FOR AT LEAST
2' BEFORE PITCHING TO SOIL ABSORPTION SYSTEM. WATER TEST DISTRIBUTION
BOXTO ASSURE EVEN DISTRIBUTION.
9.) DISTRIBUTION BOX SHALL HAVE A MINIMUM SUMP OF 6" MEASURED BELOW
THE OUTLET INVERT.
10.) BASE AGGREGATE FOR THE LEACHING FACILITY SHALL CONSIST OF 3/4" TO
1-1/2" DOUBLE WASHED NATIVE STONE FREE OF IRON, FINES AND DUST AND SHALL
BE INSTALLED BELOW THE CROWN OF THE DISTRIBUTION LINE TO THE BOTTOM OF THE
SOILABSORPTION SYSTEM. BASE AGGREGATE SHALL BE COVERED WITH FILTER FABRIC
OR APPROVED EQUIVALENT.
11.) VENT SOIL ABSORPTION SYSTEM WHEN DISTRIBUTION LINES EXCEED 50 FEET;
WHEN LOCATED EITHER IN WHOLE OR IN PART UNDER DRIVEWAYS, PARKING AREAS,
TURNING AREAS OR OTHER IMPERVIOUS MATERIAL; OR WHEN PRESSURE DOSED.
12.) SOIL ABSORPTION SYSTEM SHALL BE COVERED WITH A MINIMUM OF 9" OF
CLEAN MEDIUM SAND (EXCLUDING TOPSOIL).
13.) FINISH GRADE SHALL BE A MAXIMUM OF 36" OVER THE TOP OF ALL SYSTEM
COMPONENTS, INCLUDING THE SEPTIC TANK, DISTRIBUTION BOX, DOSING CHAMBER
AND SOIL ABSORPTION SYSTEM. SEPTIC TANKS SHALL HAVE A MINIMUM COVER
OF 9
14.) FROM THE DATE OF INSTALLATION OF THE SOIL ABSORPTION SYSTEM UNTIL
RECEIPT OF A CERTIFICATE OF COMPLIANCE, THE PERIMETER OF THE SOIL ABSORP-
TION SYSTEM SHALL BE STAKED AND FLAGGED TO PREVENT THE USE OF SUCH
AREA FOR ALLACTIVITIES THAT MIGHT DAMAGE THE SYSTEM.
FLOW PROFILE:
NOT TO SCALE
TOP OF FOUNDATION
EL=61.0±
+I
0
rri
i8.00 56.50 7 10"
3„ T
[ TOTAL OF (3): (2) ST, (1) DB ]
21" DIAMETER CONCRETE COVERS
RAISED TO WITHIN 6" OF FINISH
GRADE (OR AS NOTED)
(SEE NOTE #5)
--Proposed EL=59.0±
14"
4'0" T
GAS BAFFLE
SOIL TEST LOGS:
TFCT Wnl P 1 • FI =w n+
DEPTH FROM
SURFACE
(INCHES)
SOIL
HORIZON
SOIL
TEXTURE
(USDA)
SOIL
COLOR
(MUNSELL)
SOIL
MOTTLING
OTHER
0-10
A
Fine Loamy Sand
10YR3 2
NONE
10-26
B
I -Loamy Sand
10YR6 8
NONE
26-122
Cl
Coarse Sand
10YR7 6
NONE
PERC @ 60"• <2 MIN IN
TCCT urm C 7. CI -tit n4.
DEPTH FROM
SURFACE
(INCHES)
SOIL
HORIZON
SOIL
TEXTURE
(USDA)
SOIL
COLOR
(MUNSELL)
SOIL
MOTTLING
OTHER
0-10
A
Fine Loamy Sand
10YR3 2
NONE
10-25
B
Loamy Sand
10YR6 8
NONE
25-120
Cl
I Coarse Sand
10YR7 6
NONE
TCCT Wr)l C 2• GI -rl A-
-
DEPTH FROM
SURFACE
(INCHES)
0-9
SOIL
HORIZON
A
SOIL
TEXTURE
(USDA)
Fine Loamy Sand
SOIL
COLOR
(MUNSELL)
10YR3 2
SOIL
MOTTLING
NONE
OTHER
9-22
B
Loamy Sand
10YR6 8
NONE
22-126
Cl
11Coarse Sand
I 10YR7 6
I NONE
PERC @ 50"; <2 MIN IN
TCCT I-Ir )l F d. P =Al R+
DEPTH FROM
SURFACE
(INCHES)
SOIL
HORIZON
SOIL
TEXTURE
(USDA)
SOIL
COLOR
(MUNSELL)
SOIL
MOTTLING
OTHER
0-8
A
Fine Loamy Sand
10YR3 2
NONE
8-20
B
Loamy Sand
10YR6 8
NONE
20-124
Cl
I Coarse Sand
10YR7 6
NONE
DATE OF TESTING: 10/25/2023
PERCOLATION RATE: LESS THAN 2 MIN/INCH IN'C1' LAYER.
WITNESSED BY: ROBERT REEDY, P.E., J.M. O'REILLY & ASSOCIATES, INC.
BARRY LEWIS, YARMOUTH HEALTH DEPARTMENT
NO WATER ENCOUNTERED
USE A LOADING RATE OF 0.74 GPD/SF FOR SIZING OF SOIL ABSORPTION SYSTEM.
SYSTEM DESIGN CALCULATIONS:
SEWAGE DESIGN FLOWI
BEDROOM D E LIN @ 110 GPD = 440 GPD
LEACHING CAPACITY REQUIREDI
BEDROOMS (MAX.)110 GPD = 440 GPD REQUIRED
SEPTIC TANK CAPACITY REQUIREDI
DAILY FLOW = 440 GPD @ 0% = 880 GAL. REQUIRED
SEPTIC TANK CAPACITY PROVIDEM
1500GALLON SEPTIC TANK MIN. ALLOWED)
LEACHING CAPACITY PROVIDEM
TWO 2 49.0 X 2. X 2.0'LEACHING TRENCHES CAN LEACH:
Vt=[2][(49.0 X 2.0) + (49.0 X 2.0)2 + (2.0 X 2.0)2] X 0.74 GPD/SF=446.96 GPD
446 GPD>440 GPD REQUIRED
NOTE: A GARBAGE DISPOSAL IS NOT PERMITTED WITH THIS DESIGN.
INSTALLI
ONE 1 -1500 GALLON SEPTIC TANK
ONE (1)- 3 OUTLET DISTRIBUTION BOX (H-20 RATED)
TWO (2)- 49.0' X 2.0' X 2.0' LEACHING TRENCHES
SAS DETAIL:
SCALE: 1" = 10'
TWO (2) 4" PVC
INSPECTION PORTS
INSPECTION NOTE:
PRIOR TO FINAL INSPECTION BY THE ENGINEER, SYSTEM NEEDS TO
BE COMPLETE INCLUDING BUILDUP FOR COVERS.
EL=58.5±
D-BOX
4" SCHED 40 PERFORATED PVC PIPE
TWO (2) 4" PVC
INSPECTION PORTS
BUILT UP TO WITHIN
3" OF FINISH GRADE
E L=57.0± - 58.5±
11"-'32" Proposed
(12" Min-36" Max)
55.75 56.00 3/4" -1/2" STONE 2'
2" DROP
�.1 LEACHING TRENCH
Longest Run (2) 49.0' x 2.0' x 2.0'
�- 3' 11' 1 TRENCHES TO BE END LOADED
1500 GALLON DB-3 TWO RUNS @ 49'±
SEPTIC TANK D-BOX SLOPE = 0.005 FT/FT
H-20
FILTER FABRIC
ROOF RUNOFF DOWNSPOUT SECTION:
NOT TO SCALE
PROPOSED 6" ADS HDPE 'T' CONNECTION
PROPOSED 6" ADS HOPE
PROPOSED DOWNSPOUT
(SEE ARCHITECTURAL PLANS
FOR DETAILS AND LOCATIONS)
ADS DOWNSPOUT ADAPTER
FINISH GRADE
MINIMUM 0% PITCH
6" ADS HDPE TO LEACHING
DRIVEWAY PAVEMENT SECTION:
NOT TO SCALE
_REQUIRED _ACCESS _PRUNING ZONE
r (12' TALL X 14' W/DEJ
I I
I I
i 10' (ACCESS)
2, 20' (PARKING) 2,
1/4" PER FOOT PITCH �ti1
1" FINISH COVER (ROLLED)
1.5" BINDER COURSE (ROLLED)
4" DENSE GRADE CRUSHED STONE BASE (14' WIDE)
(MIN) 4" CLEAN SAND (SUB -BASE)
ALL DRIVEWAY FILL SHALL BE CLEAN SAND PLACED IN
(MAX) 6" LIFTS AND COMPACTED TO 95% DENSITY AS
DETERMINED BY THE MODIFIED PROCTOR TEST
53.50
33.1'±
1EL=20.4± PERCHED GROUNDWATER,
TEST HOLES 3 AND 4, LOT 14 (8 FAITH ROAD)
a
6" ADS HDPE FROM ROOF
PIPE SHALL EXTEND
12" INSIDE CHAMBERS
GJ�1
ROOF RUNOFF LEACHING SECTION:
NOT TO SCALE
1-1/2" WASHED STONE
SURROUNDING CHAMBERS
N
FINISH GRADE
CULTEC NO.410 NON -WOVEN GEOTEXTILE
(OR APPROVED EQUAL) AROUND TOP AND
SIDES OF STONE,
F6" MINIMUM
NATURALLY COMPACTED FILL
30.5"
.5'
�-10.5' x 6.3T LEACHING FACILITY -
ONE (1) CULTEC RECHARGER 330XLHD
HEAVY DUTY CHAMBER WITH 1' STONE
AROUND AND 6" STONE ABOVE AND BELOW..
CULTEC NO.4800 WOVEN GEOTEXTILE TO BE PLACED
BENEATH ALL INLET PIPES (FOR SCOUR PROTECTION)
OPEN SPACE
ROOF RUN-OFF NOTES:
1.) ALL ROOF GUTTERS SHOULD BE DIRECTLY CONNECTED TO
LEACHING FACILITIES USING 6" ADS PIPE.
2.) DWELLING SHALL UTILIZE A TOTAL OF (2) CULTEC
RECHARGER 330XLHD STORMWATER LEACHING UNITS, SPLIT
INTO (2) 10.5' x 6.33' LEACHING FACILITIES.
3.) LEACHING FACILITIES SHALL BE SET WITHIN A CLEAN SAND
BASE WITH ANY UNSUITABLE SOILS AND/OR ORGANIC
MATERIAL REMOVED. CHAMBERS SHALL BE SURROUNDED BY
6" STONE ON TOP AND BOTTOM, 12' STONE ON SIDES.
PLAN
SCALE 1"=20'
0 20 40 60
SCALE 1"=20'
G:\AAJobs\THE DAVENPORT COMPANY -ROUTE 6A-YARMOUTHPORT\DWG\8807.SDS Plans.dwg
Ln
cu
to
m
a
rn
rn
Y
0
0
co
c
tv
a
HING FACILITY, TYPICAL
CITES)