HomeMy WebLinkAbout127_Whites_Path_Stormwater_Permit_App•
: f-iI iTi
127 Whites Path Liquified Natural Gas Project
Yarmouth, Massachusetts
Stormwater
Management Permit
Application
National Grid
December 2025
100% Recyclable ���
Tighe&Bond
2351420039A
December 12, 2025
Yarmouth Conservation Commission
C/o Brittany DiRienzo
Town of Yarmouth
1146 Route 28
South Yarmouth, MA 02664
Re: Stormwater Management Permit Application
127 Whites Path Liquified Natural Gas Project
Dear Members of the Commission:
On behalf of National Grid (the "Applicant"), Tighe & Bond is pleased to submit a Stormwater
Management Permit Application for the Liquefied Natural Gas Project (referred to as "the Project")
located at 127 Whites Path in South Yarmouth, MA. This application for a Stormwater Management
Permit is being submitted in accordance with Section 2 of the Town of Yarmouth Stormwater
Management Regulations.
The proposed project includes site clearing, regrading, and tree removal, construction of a new
liquefied natural gas (LNG) tank adjacent to an existing tank and associated infrastructure, a new
paved perimeter access road, new fencing, and a comprehensive stormwater management system.
The stormwater management system includes catch basins, trench drains, drain manholes,
stormwater treatment units, sediment forebays and an infiltration basin. The design has been
prepared in accordance with the Town's Stormwater Management Regulations, and the
recommendations in the Massachusetts Department of Environmental Protection (MassDEP)
Stormwater Handbook.
Copies of the Stormwater Permit Application Form, Administrative Checklist, Abutter Information,
and Site Plans (including project narrative, erosion and sedimentation control plan, and operation
and maintenance plan) are enclosed. The Project also received a Site Plan Review Comment Sheet
from the Town of Yarmouth's formal review on December 2, 2025, and copies of these comments
are included with this application. The filing fee and legal ad fee are enclosed.
We trust this information will be satisfactory for your review of the Project. If you have any
questions regarding this application or if you require additional information, please contact me at
413.885.0265/ tigrace@tighebond.com.
Very Truly Yours,
TIGHE & BOND, INC.
Timothy Grace, PE
Senior Engineer
53 Southampton Road Westfield, MA 01085-5308 Tel 413.562.1600
www.tighebond.com
Tighe&Bond
Town of Yarmouth
Administrative Checklist
127 Whites Path Liquified Natural Gas Project
0 YA- r
'MATTAGNEESE a&nit�
r Ve e&&Uj
'HCoRPORATED
/ / //•Ifild
r
_/
DEPARTMENT
OF
CONSERVATION
All filings must be made on Town of Yarmouth forms found at www.Varmouth.ma.us/325/Conservation. No
new information may be accepted into the Commissioners' packets within the week before a
meeting. The Conservation Commission shall issue a written notice of administrative completeness or
deficiencies to an applicant for an application within ten (10) business days of receiving the application.
Refer to the meeting and fee schedule. Contact the Conservation Office if you need assistance.
X Has the project been reviewed under Site Plan Review?
1 hardcopy of the following:
X Completed signed original application (double sided)
X List of abutters from the most recent certified record of the Yarmouth Assessor's Office
X Stormwater Management Site Plan* (folded separately, right side out with title visible)
X Project Narrative including project description and construction sequence per Section 2.04, and
how the project meets the performance standards in Section 2.05
X Erosion and Sediment Control Plan*
X Operation and Maintenance Plan*
'(see Stormwater Management Regulations found at www.Varmouth.ma.us/325/Conservation for required information)
X Site Plan Review comments
X Checklist for Stormwater Report
X Proof of delivery of notification to abutters at least 10 days prior to Conservation meeting
X Pdf copy of signed application, supporting information and plan(s) emailed to
bdirienzo(a-)_yarmouth.ma.us and jjerolimop_yarmouth.ma.us
Please list project property's street address in the pdf file name.
X Filing fee: separate check made payable to "Town of Yarmouth"
X Legal ad fee: separate check made payable to "Town of Yarmouth"
Please list project property's street address on checks.
Refer to Fee Schedule at https://www.yarmouth.ma.us/696/Filing-Forms
Yarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664-4492
Tel. (508)-398-2231 Ext. 1288 • Fax (508)-398-0836 • TTD# (508) 398-2231
Rev 12/2024 Page 1 of 1
Tighe&Bond
Town of Yarmouth Stormwater
Management Permit Application
127 Whites Path Liquified Natural Gas Project
J/r!/0 Y `r
`I1\\ MTX S
A T
Important: When
filling out forms on
the computer, use
only the tab key to
move your cursor -
do not use the
return key.
rao
Town of Yarmouth Stormwater By -Law Ch. 145
Stormwater Management Permit Application
A. General Information
Project Location:
127 Whites Path
a. Street Address
Latitude and Longitude:
Map: 98
f. Assessors Map/Plat Number
2. Applicant:
Yarmouth 02664
b. City/Town c. Zip Code
41.6896-70.202
d. Latitude e. Longitude
Lot: 81
g. Parcel /Lot Number
Matthew T. Wozniak, PE
a. First Name b. Last Name
Boston Gas Company DBA National Grid
c. Organization
170 Data Drive
d. Street Address
Waltham Massachusetts 02451
e. City/Town f. State g. Zip Code
781.572.7482 matthew.wozniak@national_grid.com
h. Phone Number j. Email Address
3. Property owner (required if different from applicant): ❑ Check if more than one owner
a. First Name
b. Last Name
c. Organization
d. Street Address
e. City/Town f. State g. Zip Code
h. Phone Number j. Email address
4. Representative (if any):
Timothy Grace, PE
a. First Name b. Last Name
Tighe & Bond
c. Company
53 Southampton Road
d. Street Address
Westfield
e. City/Town
413.885.0265
h. Phone Number
Massachusetts 01085
f. State g. Zip Code
TJGrace@tighebond.com
j. Email address
5. Total Fee Paid: Stormwater Application: $200.00
Legal Ad: $15.00
a. Total Fee Paid Total: $215.00
A. General Information (continued)
Page 1 of 2
�oF YA Town of Yarmouth Stormwater By -Law Ch. 145
Stormwater Management Permit Application
`.` MATT4CFEESE.�'
6. General Project Description:
The proposed project includes site clearing, regrading, and tree removal,
construction of a new liquefied natural gas (LNG) tank adjacent to an existing tank
and associated infrastructure, a new paved perimeter access road, new fencing, and
a comprehensive stormwater management system. The stormwater management
system includes catch basins, trench drains, drain manholes, stormwater treatment
units, sediment forebays and an infiltration basin. The design has been prepared in
accordance with the Town's Stormwater Management Regulations, and the
recommendations in the Massachusetts Department of Environmental Protection
(MassDEP) Stormwater Handbook.
7. Property recorded at the Registry of Deeds for:
Barnstable
a. County b. Certificate # (if registered land)
1499, 3253, 4792, 22494 992, 110, 274, 160
c. Book d. Page Number
B. Signatures and Submittal Requirements
I hereby certify under the penalties of perjury that the foregoing Stormwater Management Permit
Application and accompanying plans, documents, and supporting data are true and complete to the best
of my knowledge. I understand that the Conservation Commission will place notification of this
application in a local newspaper at the expense of the applicant.
I further certify under penalties of perjury that all abutters were notified of this application, pursuant to
the requirements of the Yarmouth Stormwater Management Regulations in writing by hand delivery or
certified mail (return receipt requested) to all abutters within 100 feet of the property line of the project
location.
Signature of Applicant
Signature of Property Owner (if different)
Signature of Representative (if any)
Date 12/11/2025
Page 2 of 2
Tighe&Bond
Site Plan Review Comments
127 Whites Path Liquified Natural Gas Project
Formal Review
SITE PLAN REVIEW COMMENT SHEET
Date: December 2, 2025 Map: 98 Lot: 81
Applicant: Boston Gas Company d/b/a National Grid
Location: 127 Whites Path. South Yarmouth Zone B3/APD
Persons Present:
Lt Michael Oliva
Bill Ciocca
Joe Carroll
Barry Lewis
Brendan Maloney
Mark Grylls
Gary St, Fleur
Kathy Williams
LUKe Poiner
Amanda Lima
Luke White
Replacement of LNG Tank storing up to 2.1 million gallons liquified natural gas. Refer to Exhibits 2 through 10 for
additional detail.
Building: Project as proposed will require relief from the ZBA in the form of a SP for the use in the B3 and APO overlay.
The height of the tank was referenced in discussion will likely require a variance. Original project was provided an
exemption from the zoning bylaws in Jan. 1969 through decision #15972 and modified in Nov.1971 through decisions
15972A and 15972B. These decisions were specific to the existing conditions, which is the reason for the relief from the
local ZBA. Having no prior relief from the ZBA, there are no existing decisions of the board to modify. Building permits
required to demolish and construct new tank.
Stormwater Management permit will be required from the Conservation Commission.
Plannina: For the ZBA, clearly outline the reasons explained at SPR for the needed height (88'), new tank location,
clearing limits and tank containment within the new tank. Consider other locations for visualizations along the CCRT and
Beacon Street neighborhood. Maximum 20' site lighting pole height, and footcandle requirements at property lines, per
Section 301.4.10.
Design Review: Not present.
Conservation: The proposed project requires a stormwater management permit.
Engineerina:
• Provide drainage calculations when available to review upon submission of Stormwater Management permit.
Provide vapor fence detail
• Confirm purpose of the fire access path on the exterior side of the fence. Provide truck turning movements on the
site plan
• Site plan appears to reflect the southwest part of the path just ends of vegetation and fire trucks exiting from the
southwest side of the fire access path would have no way to exit (traveling clockwise). Please confirm the vehicle
flow intent.
• Confirm what restoration will look like upon decommissioning of LNG tank
• Provide height and diameter of the existing and new tanks.
Fire: hotwork requires permit. Fire watch personnel shall be assigned as needed by NG and the AHJ to determined by
Health: (Hazardous Materials)
New LNG Tank
What is construction material of the 2.1-million-gallon full containment LNG storage tank?
Does the LNG storage tank have a double wall to provide insulation?
Does the double wall also serve as secondary containment in the event of a leak in the inner tank?
Does the LNG tank have an interstitial leak detection system between the inner and outer tank walls?
Moats and Trenches
Will the new LNG tank be surrounded by a moat?
If a moat is used, what is constructed from or lined with?
What are the trenches from the tank to the impound area constructed from or lined with?
If the new LNG tank is not surrounded by a moat, how would a leak be directed to the trenches
leading to the impound areas?
Pi in
Is the LNG piping to the tank double -walled?
Does LNG piping to the tank have a leak detection system? Is
the LNG send out piping from the new tank double -walled?
Does the LNG send out piping from the new tank have a leak detection system?
Is all LNG piping aboveground?
I understand from the National Grid NFPA 59A Fire Protection Evaluation, section 3.8.1 LNG and
Liquid Nitrogen Spill Control, that all areas beneath LNG equipment and piping are curbed and
graded to route any spills away from the equipment and into trenches that drain into local
impoundment basins.
Liquid Nitrogen
What is the capacity of the liquid nitrogen storage vessel?
What is the capacity of the area surrounded by the concrete curb around the nitrogen
equipment?
Impound Areas
What are the capacities of LNG impoundment basins S-6100 and S-6200? From
what material are the impound areas constructed or lined with?
LNG Release
In the event of an LNG release, would all liquid material be contained by or vaporize from, the impoundment
basins without escaping to the environment and potentially impacting ground water?
Water: Confirm the tie in of water main on east side of Whites Path. Also coordinate with vendor when the time
comes to fill the tank with 1 m gal.
Tighe&Bond
Certified List of Abutters
127 Whites Path Liquified Natural Gas Project
98/ 26/ / /
98/ 83/ / /
98/ 52/
KELLEY THOMAS E TRS
KELLEY THOMAS E TRS
DEGEORGE LEONARD J
THOMAS E KELLEY LVNG TRST
THOMAS E KELLEY LVNG TRST
C/O DEGEORGE JANE E
800 SW MARSH HARBOR BAY
800 SW MARSH HARBOR BAY
120 BEACON ST
PORT ST LUCIE, FL 34986
PORT ST LUCIE, FL 34986
SOUTH YARMOUTH, MA 02664
98/ 49/ / /
98/ 81 / / /
98/ 51 /
DARIUS MACKENSON
COLONIAL GAS COMPANY
RODENBUSH JAMES F X
CASIMIR KETTLENE
40 SYLVAN RD
RODENBUSH DAWN L
4 SPUR DR
WALTHAM, MA 02451
114 BEACON ST
NANUET, NY 10954
SOUTH YARMOUTH, MA 02664
98/ 481 / /
98/ 84/ / /
98/ 50/
SOUTHER LEAH M
TOWN OF YARMOUTH
MELCHIONO FRANCES E TR
SOUTHER JARED L
INHABITANTS
TABER DANIEL W TR
96 BEACON ST
1146 ROUTE 28
108 BEACON ST
SOUTH YARMOUTH, MA 02664
SOUTH YARMOUTH, MA 02664-4463
SOUTH YARMOUTH, MA 02664
98/ 47/ / /
99/ 33/ C1/ /
99/ 33/ C2/ /
CLAYMAN GAIL L TR
REARDON REALTY MA INC
TWO TWENTY FIVE WHITES PATH LLC
CLAYMAN BARRY TR
123 EAST ST
C/O TURTLE ROCK LLC
90 BEACON ST
ATTLEBORO , MA 02703
231 WILLOW ST
SOUTH YARMOUTH, MA 02664
YARMOUTH PORT, MA 02675-1744
98/ 82/ / /
99/ 34/ / /
99/ 33/ C3/ /
COLONIAL GAS COMPANY
WEAVER FREDERICK
TWO TWENTY FIVE WHITES PATH LLC
40 SYLVAN RD
C/O WEAVER FREDERICK C TR
C/O TURTLE ROCK LLC
WALTHAM, MA 02451
158 BEACON ST
231 WILLOW ST
SOUTH YARMOUTH, MA 02664-1852
YARMOUTH PORT, MA 02675-1744
98/ 80.1 / / /
98/ 57/
SNOW AND JONES INC
VAUGHN DIANA LEE
167 WHITES PATH
152 BEACON ST
SOUTH YARMOUTH, MA 02664-1217
SOUTH YARMOUTH, MA 02664
98/ 79/ / /
98/ 56/ / /
Please use this signature to
g
KELLEY THOMAS E TRS
THOMAS E KELLEY LVNG TRST
PINGETON ROBERT P JR
PINGETON SUZANNE S
certify this list of properties
800 SW MARSH HARBOR BAY
146 BEACON ST
abutting within 100' of the parcel
PORT ST LUCIE, FL 34986
SOUTH YARMOUTH, MA 02664
located at:
127 Whites Path, South Yarmouth,
MA 02664
98/ 781 / /
98/ 55/ / /
Map 98 Lot 81
KELLEY THOMAS E TRS
BOTELHO LINDA J
THOMAS E KELLEY LVNG TRST
C/O XIARHOS ALEXANDER J
800 SW MARSH HARBOR BAY
140 BEACON ST
PORT ST LUCIE, FL 34986
SOUTH YARMOUTH, MA 02664
Andy achado
Director of Assessing
98/ 77/ / /
98/ 54/ / /
December 10, 2025
MAJEWSKI ROBERT E TR
YOUNG WILLIAM M
134 BLUE ROCK RD
YOUNG DIANE M
SOUTH YARMOUTH, MA 02664
132 BEACON ST
SOUTH YARMOUTH, MA 02664
98/ 85/ / /
98/ 53/
BURNS THOMAS M DVM
SMALL VICTORIA A (PERS REP)
VETERINARY ASSOC OF CC
126 BEACON ST
16 COMMONWEALTH AVE
SOUTH YARMOUTH, MA 02664
SOUTH YARMOUTH, MA 02664
Tighe&Bond
Stormwater Management Report
127 Whites Path Liquified Natural Gas Project
100%Recyclable jL4