HomeMy WebLinkAbout3 Faith Road Sewage Plan ReviewTOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Lot (aS 436
Street:ct
Village: \1 P.
Owner:_�Uev�,p�r'� G(�
Address:
Phone:
Zone of Contribution: In_ Out Acreage
Commercial: Residential:
Floor Plan: # Bedrooms: Zn a C) (�
o%
Installer: Ocv-1611)5
Phone: S bK �/ o U- 6-/2
Builder: (/��oa hi Engineer: Yj'1_ 0 ZV,1 (-7
Address: Phone: Y - _ �, o )
Phone:
N/A
YES
NO
1. Required # of copies received
v/
2. Date of soils exam and ercolation test not older than 2 years
3. 4-5 ft of naturally occurring pervious material, above water table
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5. Water line 10 ft from septic components Var.:
v
6. Benchmark indicated and shown - NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
.�
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.:
'
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above ad'. water or bottom of test hole Var.:
15. System not in top or subsoil (A,B horizons) or 5' removal
16. Proposed contours are suitable
17. System meets slope requirements - min. 1/8", '/" preferred
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21. No garbage disposal
22. System adequately sized for its intended use
✓
23. Minimum 6" stone or compacted below tank and dbox
v
24. Manhole covers within 6" of grade, pump chamber cover to grade
25. Inspection port on plastic chambers/leach field
✓
26. Electrical permit for pump chamber/Separate meter for duplexes
27. Pump system -2" line,weep hole,check valve, tee in dbox, pump size
28. Septic tank/pumptank/pump chamber to be factory wate roofed
29. Vent provided if leaching below 3 feet, under driveway/parkingi/
30. Buoyancy calculations for tank/pumptank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stain s/si nature
v
33. H-20 loading is subject to vehicular traffic, groundwater
34. Title V Application an&permit fee, installer signature
✓
35. Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. # bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in lessor's Ma
'
-=-/ ��
Plan reviewed by: siosios