Loading...
HomeMy WebLinkAbout3 Faith Road Sewage Plan ReviewTOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot (aS 436 Street:ct Village: \1 P. Owner:_�Uev�,p�r'� G(� Address: Phone: Zone of Contribution: In_ Out Acreage Commercial: Residential: Floor Plan: # Bedrooms: Zn a C) (� o% Installer: Ocv-1611)5 Phone: S bK �/ o U- 6-/2 Builder: (/��oa hi Engineer: Yj'1_ 0 ZV,1 (-7 Address: Phone: Y - _ �, o ) Phone: N/A YES NO 1. Required # of copies received v/ 2. Date of soils exam and ercolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: v 6. Benchmark indicated and shown - NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: .� 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: ' 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above ad'. water or bottom of test hole Var.: 15. System not in top or subsoil (A,B horizons) or 5' removal 16. Proposed contours are suitable 17. System meets slope requirements - min. 1/8", '/" preferred 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21. No garbage disposal 22. System adequately sized for its intended use ✓ 23. Minimum 6" stone or compacted below tank and dbox v 24. Manhole covers within 6" of grade, pump chamber cover to grade 25. Inspection port on plastic chambers/leach field ✓ 26. Electrical permit for pump chamber/Separate meter for duplexes 27. Pump system -2" line,weep hole,check valve, tee in dbox, pump size 28. Septic tank/pumptank/pump chamber to be factory wate roofed 29. Vent provided if leaching below 3 feet, under driveway/parkingi/ 30. Buoyancy calculations for tank/pumptank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stain s/si nature v 33. H-20 loading is subject to vehicular traffic, groundwater 34. Title V Application an&permit fee, installer signature ✓ 35. Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. # bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in lessor's Ma ' -=-/ �� Plan reviewed by: siosios