HomeMy WebLinkAbout7 Miracle Way SITE PLAN SEWAGEGENERAL NOTES:
A.) NEITHER DRIVEWAYS NOR PARKING AREAS ARE ALLOWED OVER SEPTIC SYSTEM
UNLESS H-20 COMPONENTS ARE USED.
B.) THE DESIGNER WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UN-
LESS CONSTRUCTED AS SHOWN. ANY CHANGES SHALL BE APPROVED IN WRITING.
C.) CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL
UNDERGROUND AND OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK.
CONSTRUCTION NOTES:
1.) ALL CONSTRUCTION SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE,
TITLE 5, AND THE REQUIREMENTS OF THE LOCAL BOARD OF HEALTH,
2.) SEPTIC TANK(S), GREASE TRAP(S), DOSING CHAMBER(S) AND DISTRIBUTION
BOX(ES) SHALL BE SET ON A LEVEL STABLE BASE WHICH HAS BEEN MECHANICALLY
COMPACTED, OR ON A 6 INCH CRUSHED STONE BASE.
3.) SEPTICTANK(S) SHALL MEET ASTM STANDARD C1127-93 AND SHALL HAVE
AT LEASTTHREE 20" DIAMETER MANHOLES. THE MINIMUM DEPTH FROM THE BOT-
TOM OF THE SEPTIC TANK TO THE FLOW LINE SHALL BE 48".
4.) SCHEDULE 40 PVC INLET AND OUTLET TEES SHALL EXTEND A MINIMUM OF 6"
ABOVE THE FLOW LINE OF THE SEPTIC TANK AND SHALL BE INSTALLED ON THE
CENTERLINE OF THE TANK DIRECTLY UNDER THE CLEANOUT MANHOLE.
5.) RAISE COVERS OF THE SEPTIC TANK AND DISTRIBUTION BOX WITH PRECAST
CONCRETE WATERTIGHT RISERS OVER INLET AND OUTLET TEES TO WITHIN 6" OF
FINISH GRADE, OR AS APPROVED BY THE LOCAL BOARD OF HEALTH AGENT.
6.) PIPING SHALL CONSIST OF 4" SCHEDULE 40 PVC OR EQUIVALENT. PIPE SHALL
BE LAID ON A MINIMUM CONTINUOUS GRADE OF NOT LESS THAN 1%.
7.) DISTRIBUTION LINES FOR SOIL ABSORPTION SYSTEM (AS REQUIRED) SHALL BE
4" DIAMETER SCHEDULE 40 PVC LAID AT 0.005 FT/FT. LINE SHALL BE CAPPED
AT END OR AS NOTED.
8.) OUTLET PIPES FROM DISTRIBUTION BOX SHALL REMAIN LEVEL FOR AT LEAST
2' BEFORE PITCHING TO SOIL ABSORPTION SYSTEM. WATER TEST DISTRIBUTION
BOXTOASSURE EVEN DISTRIBUTION.
9.) DISTRIBUTION BOX SHALL HAVE A MINIMUM SUMP OF 6" MEASURED BELOW
THE OUTLET INVERT.
10.) BASE AGGREGATE FOR THE LEACHING FACILITY SHALL CONSIST OF 3/4" TO
1-1/2" DOUBLE WASHED NATIVE STONE FREE OF IRON, FINES AND DUST AND SHALL
BE INSTALLED BELOW THE CROWN OF THE DISTRIBUTION LINE TO THE BOTTOM OF THE
SOILABSORPTION SYSTEM. BASE AGGREGATE SHALL BE COVERED WITH FILTER FABRIC
OR APPROVED EQUIVALENT.
11.) VENT SOIL ABSORPTION SYSTEM WHEN DISTRIBUTION LINES EXCEED 50 FEET;
WHEN LOCATED EITHER IN WHOLE OR IN PART UNDER DRIVEWAYS, PARKING AREAS,
TURNING AREAS OR OTHER IMPERVIOUS MATERIAL; OR WHEN PRESSURE DOSED.
12.) SOILABSORPTION SYSTEM SHALL BE COVERED WITH A MINIMUM OF 9" OF
CLEAN MEDIUM SAND (EXCLUDING TOPSOIL).
13.) FINISH GRADE SHALL BE A MAXIMUM OF 36" OVER THE TOP OF ALL SYSTEM
COMPONENTS, INCLUDING THE SEPTIC TANK, DISTRIBUTION BOX, DOSING CHAMBER
AND SOILABSORPTION SYSTEM. SEPTIC TANKS SHALL HAVE A MINIMUM COVER
OF 9".
14.) FROM THE DATE OF INSTALLATION OF THE SOIL ABSORPTION SYSTEM UNTIL
RECEIPT OF A CERTIFICATE OF COMPLIANCE, THE PERIMETER OF THE SOIL ABSORP-
TION SYSTEM SHALL BE STAKED AND FLAGGED TO PREVENT THE USE OF SUCH
AREA FOR ALL ACTIVITIES THAT MIGHT DAMAGE THE SYSTEM.
SAS DETAIL:
SCALE: 1" = 10'
FLOW PROFILE:
NOT TO SCALE
I TOTAL OF (4): (2) ST, (1) DB, (1) SAS J
21" DIAMETER CONCRETE COVERS
RAISED TO WITHIN 6" OF
TOP OF FOUNDATION FINISH GRADE (OR AS NOTED)
EL=55.0± (SEE NOTE #5)
Proposed EL=53.5±
U-bux
SOIL TEST LOGS:
TFST HCII F 1 • FI =54.6+
DEPTH FROM
SURFACE
(INCHES)
SOIL
HORIZON
SOIL
TEXTURE
(USDA)
SOIL
COLOR
(MUNSELL)
SOIL
MOTTLING
OTHER
0-10
A
Fine Loamy Sand
10YR3 2
NONE
10-32
B
Loamy Sand
10YR6 8
NONE
32-132
Cl
Coarse Sand
10YR7 6
NONE
PERC @ 48"• <2 MIN IN
TFST Hr11 F 7• F1 =SA F;+
DEPTH FROM
SURFACE
(INCHES)
SOIL
HORIZON
SOIL
TEXTURE
(USDA)
SOIL
COLOR
(MUNSELL)
SOIL
MOTTLING
OTHER
0-8
A
Fine Loamy Sand
10YR3 2
NONE
8-32
B
Loamy Sand
10YR6 8
NONE
32-128
Cl
Coarse Sand
10YR7 6
NONE
TFST H01 F :I• FI =53.0+
DEPTH FROM
SURFACE
(INCHES)
SOIL
HORIZON
SOIL
TEXTURE
(USDA)
SOIL
COLOR
(MUNSELL)
SOIL
MOTTLING
OTHER
0-12
A
Fine Loamy Sand
10YR3 2
NONE
12-28
B
Loamy Sand
10YR6 8
NONE
28-122
Cl
Coarse Sand
10YR7 6
I NONE
I PERC c@ 51"• <2 MIN IN
TFST Hnl F 4• FI =53.0+
DEPTH FROM
SURFACE
(INCHES)
SOIL
HORIZON
SOIL
TEXTURE
(USDA)
SOIL
COLOR
(MUNSELL)
SOIL
MOTTLING
OTHER
0-11
A
Fine Loamy Sand
10YR3 2
NONE
11-29
B
LoamV Sand
10YR6 8
NONE
29-120
Cl
I Coarse Sand
10YR7 6
NONE
DATE OF TESTING: 10/26/2023
PERCOLATION RATE: LESS THAN 2 MIN/INCH IN'C1' LAYER.
WITNESSED BY: ROBERT REEDY, P.E., J.M. O'REI_LY & ASSOCIATES, INC.
BARRY LEWIS, YARMOUTH HEALTH DEPARTMENT
NO WATER ENCOUNTERED
USE A LOADING RATE OF 0.74 GPD/SF FOR SIZING OF SOIL ABSORPTION SYSTEM.
STEM DESIGN CALCULATIONS:
SEWAGE DESIGN
BEDR OM D ELLIN @ 110 GPD = 440 GPC��\' vkt f��ql
�AP,4Etfi1" REQUIRE6i��'' ---'� ' �✓ � �S
BEDROOMS(MAX.)11 GPD 4440 GPD REQUIR
SEPTIC TANK CAPACITY REQUIREDI
DAILY FLOW = 440 6PD 20 % = 880 GAL. R
PTIC TANK CAP CITY PROVIDEDI
1500GALLONTIC TANK MIN. ALLOWED)
LEACHING CAPACITY PROVIDEM
ONE 1 .5 12,83 X 2.0 LEACHING CHAMB CAN LEACH:
Vt=[(33.5 X 12.83) + (33_5 X 2.0)2 + (12.83 X 2.OPkX 0.74 GPD/SF=455.10 GPD
455 GPJZ>440 GPDREQUI,RED
NOTE: A GARBAGE DISIP ERMITTED WITH T SIGN.
INSTALLlAONE 1)- 1500� LLON SEPTIC TANK
ONE (1)- 3 OUTLET DISTRIBUTION BOX (H-20 RATED)
THREE (3)-500 GALLON LEACH CHAMBERS WITH 4' OF NATIVE STONE ALL AROUND
I COVER TO BE BUILT UP TO
WITHIN 6" OF FINISH GRADE
INSPECTION NOTE:
PRIORTO FINAL INSPECTION BY THE ENGINEER, SYSTEM NEEDS TO
BE COMPLETE INCLUDING BUILDUP FOR COVERS.
Proposed EL=53.5±
-.-Proposed E
ROOF RUNOFF DOWNSPOUT SECTION:
NOT TO SCALE
PROPOSED 6" ADS HDPE'T' CONNECTION
PROPOSED 6" ADS HDPE
PROPOSED DOWNSPOUT
(SEE ARCHITECTURAL PLANS
FOR DETAILS AND LOCATIONS)
ADS DOWNSPOUT ADAPT ER
FINISH GRADE
MINIMUM 0% PITCH
6" ADS HDPE TO LEACHING
DRIVEWAY PAVEMENT SECTION:
6" ADS HDPE FROM ROOF
PIPE SHALL EXTEND
12" INSIDE CHAMBERS
NOT TO SCALE
_REQ_UI_RED_ACCE_55 PR_UN/NG_ZO_NE_
r (12' TALL X 14' WIDE)
I �
I I
10' (ACCESS) i �\
2, 20' (PARKING) 2,
�C�_0
P
1/4" PER FOOT PITCH
4" DENSE GRADE C
(I
ALL DRIVEWAY FILL SI
(MAX) 6" LIFTS AND C
DETERMINED B
OPEN SPACE
0
m
26" Proposed
52.4+
(9" Min- 36" Max)
51.31
7-
_
- FILTER FABRIC
52.00 51.25 10" 14"
5 .00
50.50
3/4"- 1-1/2" NATIVE STONE
3 T
4'0"
5
50.78
ry N
GAS BAFFLE
2" DROP
48.50
IL -
USE THREE (3) SHOREY PRECAST
500GALLON LEACH CHAMBERS 28.1'±
Longest Run
WITH 4'OF NATIVE STONE AROUND
34' -�
1500 GALLON
2
DB-3
(END VIEW)
iEL=20.4±
SEPTIC TANK
[ QX
PERCHED GROUNDWATER,
LEACHING CHAMBER TEST HOLES 3 AND 4, LOT 14 (8 FAITH ROAD)
P-2671
33.5' x 12.83' x 2.0'
ROOF RUNOFF LEACHING SECTION:
NOT TO SCALE
1-1/2" WASHED STONE
SURROUNDING CHAMBERS
FINISH GRADE
CULTEC NO.410 NON -WOVEN GEOTEXTILE
(OR APPROVED EQUAL) AROUND TOP AND
SIDES OF STONE.
6" MINIMUM
NATURALLY COMPACTED FILL
�--10.5' x 6.33' LEACHING FACILITY -
ONE (1) CULTEC RECHARGER 330XLHD
HEAVY DUTY CHAMBER WITH 1' STON E
AROUNDAND 6" STONE ABOVE AND BELOW_
CULTEC NO.4800 WOVEN GEOTEXTILE TO BE PLACED
BENEATH ALL INLET PIPES (FOR SCOUR PROTECTION)
ROOF RUN-OFF NOTES:
1.) ALL ROOF GUTTERS SHOULD BE DIRECTLY CONNECTED TO
LEACHING FACILITIES USING 6" ADS PIPE.
2.) DWELLING SHALL UTILIZE A TOTAL OF (2) CULTEC
RECHARGER 330XLHD STORMWATER LEACHING UNITS, SPLIT
INTO (2) 10.5' x 6.33' LEACHING FACILITIES.
3.) LEACHING FACILITIES SHALL BE SET WITHIN A CLEAN SAND
BASE WITH ANY UNSUITABLE SOILS AND/OR ORGANIC
MATERIAL REMOVED. CHAMBERS SHALL BE SURROUNDED BY
6" STONE ON TOP AND BOTTOM, 12' STONE ON SIDES.
SWALE DETAIL:
NOT TO SCALE
Y
,-�-VA RI ESQ,
I I
"(min)
I I 12
i I
PERMEABLE SOIL _
(50% SAND, 50% LOAM)
I I
FILTER FABRIC -
3/4" TO 1-1/2" STONE -
I I
I I 18"(min)
I I
I
6" min)
NATIVE SOIL SUB -BASE- _
FREE FROM LOAM / ORGANIC MATERIAL
0 20 40 60
SCALE 1"=20'