HomeMy WebLinkAbout11 Miracle Site & Sewage Disposal PlanGENERAL NOTES:
A.) NEITHER DRIVEWAYS NOR PARKING AREAS ARE ALLOWED OVER SEPTIC SYSTEM
UNLESS H-20 COMPONENTS ARE USED.
B.) THE DESIGNER WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UN-
LESS CONSTRUCTED AS SHOWN. ANY CHANGES SHALL BE APPROVED IN WRITING.
C.) CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL
UNDERGROUND AND OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK.
CONSTRUCTION NOTES:
1.) ALL CONSTRUCTION SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE,
TITLE 5,ANDTHE REQUIREMENTS OF THE LOCAL BOARD OF HEALTH.
2.) SEPTICTANK(S), GREASE TRAP(S), DOSING CHAMBER(S) AND DISTRIBUTION
BOX(ES) SHALL BE SET ON A LEVEL STABLE BASE WHICH HAS BEEN MECHANICALLY
COMPACTED, OR ON A 6 INCH CRUSHED STONE BASE.
3.) SEPTIC TANK(S) SHALL MEET ASTM STANDARD C1127-93 AND SHALL HAVE
AT LEASTTHREE 20" DIAMETER MANHOLES. THE MINIMUM DEPTH FROM THE BOT-
TOM OF THE SEPTIC TANK TO THE FLOW LINE SHALL BE 48",
4.) SCHEDULE 40 PVC INLET AND OUTLET TEES SHALL EXTEND A MINIMUM OF 6"
ABOVE THE FLOW LINE OF THE SEPTIC TANK AND SHALL BE INSTALLED ON THE
CENTERLINE OF THE TANK DIRECTLY UNDER THE CLEANOUT MANHOLE.
5.) RAISE COVERS OF THE SEPTIC TANK AND DISTRIBUTION BOX WITH PRECAST
CONCRETE WATER TIGHT RISERS OVER INLET AND OUTLET TEES TO WITHIN 6" OF
FINISH GRADE, OR AS APPROVED BY THE LOCAL BOARD OF HEALTH AGENT.
6.) PIPING SHALL CONSIST OF 4" SCHEDULE 40 PVC OR EQUIVALENT. PIPE SHALL
BE LAID ON A MINIMUM CONTINUOUS GRADE OF NOT LESS THAN 1%.
7.) DISTRIBUTION LINES FOR SOIL ABSORPTION SYSTEM (AS REQUIRED) SHALL BE
4" DIAMETER SCHEDULE 40 PVC LAID AT 0.005 FT/FT. LINE SHALL BE CAPPED
AT END OR AS NOTED.
8.) OUTLET PIPES FROM DISTRIBUTION BOX SHALL REMAIN LEVEL FOR AT LEAST
2' BEFORE PITCHING TO SOIL ABSORPTION SYSTEM. WATER TEST DISTRIBUTION
BOXTOASSURE EVEN DISTRIBUTION.
9.) DISTRIBUTION BOX SHALL HAVE A MINIMUM SUMP OF 6" MEASURED BELOW
THE OUTLET INVERT.
10.) BASE AGGREGATE FOR THE LEACHING FACILITY SHALL CONSIST OF 3/4" TO
1-1/2" DOUBLE WASHED NATIVE STONE FREE OF IRON, FINES AND DUST AND SHALL
BE INSTALLED BELOW THE CROWN OF THE DISTRIBUTION LINE TO THE BOTTOM OF THE
SOILABSORPTION SYSTEM. BASE AGGREGATE SHALL BE COVERED WITH FILTER FABRIC
OR APPROVED EQUIVALENT.
11.) VENT SOI L ABSO RPTI 0 N SYSTEM WHEN DISTRIBUTION LINES EXCEED 50 FEET,
WHEN LOCATED EITHER IN WHOLE OR IN PART UNDER DRIVEWAYS, PARKING AREAS,
TURNING AREAS OR OTHER IMPERVIOUS MATERIAL; OR WHEN PRESSURE DOSED.
12.) SOIL ABSORPTION SYSTEM SHALL BE COVERED WITH A MINIMUM OF 9" OF
CLEAN MEDIUM SAND (EXCLUDING TOPSOIL).
13.) FINISH GRADE SHALL BE A MAXIMUM OF 36" OVER THE TOP OF ALL SYSTEM
COMPONENTS, INCLUDING THE SEPTIC TANK, DISTRIBUTION BOX, DOSING CHAMBER
AND SOIL ABSORPTION SYSTEM. SEPTIC TANKS SHALL HAVE A MINIMUM COVER
OF 9".
14.) FROM THE DATE OF INSTALLATION OF THE SOIL ABSORPTION SYSTEM UNTIL
RECEIPT OF A CERTIFICATE OF COMPLIANCE, THE PERIMETER OF THE SOIL ABSORP-
TION SYSTEM SHALL BE STAKED AND FLAGGED TO PREVENT THE USE OF SUCH
AREA FOR ALLACTIVITIES THAT MIGHT DAMAGE THE SYSTEM.
SAS DETAIL:
SCALE: 1" = 10'
FLOW PROFILE:
NOT TO SCALE
[ TOTAL OF (4): (2) ST, (1) DB, (1) SAS )
21" DIAMETER CONCRETE COVERS
RAISED TO WITHIN 6" OF
TOP OF FOUNDATION FINISH GRADE (OR AS NOTED)
tl �j EL=65.0± (SEE NOTE #5)
Proposed EL=63.5± ,
`i
7 10, 14"
3" �
4'0" T
GAS BAFFLE
1500 GALLON
SEPTIC TANK
U-bux
SOIL TEST LOGS:
TFCT Hni F 1 • F1 =(;S n+
DEPTH FROM
SURFACE
(INCHES)
SOIL
HORIZON
SOIL
TEXTURE
(USDA)
SOIL
COLOR
(MUNSELL)
SOIL
MOTTLING
OTHER
0-9
A
Fine Loamy Sand
10YR3 2
NONE
9-30
B
Loamy Sand
10YR5 8
NONE
30-120
Cl
Coarse Sand
10YR7 6
NONE
I PERC @ 78"• <2 MIN IN
TFCT Wr)l F 7• FI =F,*l R+
DEPTH FROM
SURFACE
(INCHES)
SOIL
HORIZON
SOIL
TEXTURE
(USDA)
SOIL
COLOR
(MUNSELL)
SOIL
MOTTLING
OTHER
0-8
A
Fine Loamy Sand
10YR3 2
NONE
8-31
B
Loamy Sand
10YR5 8
NONE
31-120
Cl
Coarse Sand
10YR7 6
NONE
TFCT Hni F'4• FI =r,2 R+
DEPTH FROM
SURFACE
(INCHES)
SOIL
HORIZON
SOIL
TEXTURE
(USDA)
SOIL
COLOR
(MUNSELL)
SOIL
MOTTLING
OTHER
0-8
A
Fine Loamy Sand
10YR3 2
NONE
8-29
B
Loamy Sand
10YR5 8
NONE
29-120
Cl
Coarse Sand
10YR7 6
NONE
PERC @ 60"• <2 MIN IN
TFCT Pni F A• FI =F7 n+
DEPTH FROM
SURFACE
(INCHES)
SOIL
HORIZON
SOIL
TEXTURE
(USDA)
SOIL
COLOR
(MUNSELL)
SOIL
MOTTLING
OTHER
0-9
A
Fine Loamy Sand
10YR3 2
NONE
9-31
B
Loa mV Sand
10YR5 8
NONE
31-122
Cl
Coarse Sand
I 10YR7 6
INONE
DATE OF TESTING: 10/25/2023
PERCOLATION RATE: LESS THAN 2 MIN/INCH IN'C1' LAYER.
WITNESSED BY: ROBERT REEDY, P.E., J.M. O'REILLY & ASSOCIATES, INC.
BARRY LEWIS, YARMOUTH HEALTH DEPARTMENT
NO WATER ENCOUNTERED
USE A LOADING RATE OF 0.74 GPD/SF FOR SIZIN3 OF SOIL ABSORPTION SYSTEM.
SYSTEM DESIGN CALCULATIONS:
SEWAGE DESIGN FLOWi
4 BE1? OM DWELLING @ 110 GPD = 440 G
LEACHING CAPACITY 1 `- '� �J'
BEDROOMS (MATTY 11 PD 440 G P D REQU RED
SEPTIC TANK CAPACITY REQUIRE '
DAILY FL W = 440 GPDe,200%880 L. REQUIRED
SEPTIC TANK CAPACITY PROVIDEM
N LF' 1 7 IN. LLOWED)
LEACHING CAPACITY PROVIDEM
ONE 1 33.5 X 2. LEA HING CHAMBER CAN LEACH:
Vt=[(33.5 X 12.83) + (33.5 X 2.0)2 + (12.83 X 2.Q2) X 0.74 GPD/SF=455.10 GP
455 GPD>440GN REQUIRED
NOTE: GARBAGE DISPOS I NO ERMITTED WITH THIS DESIGN.
INSTALU
ONE 1 - OOG N SEPTIC TANK
ONE (1)- 0 LET, DISTRIBUTION BOX (H-20 RATED)
THREE (3) 0 GAL ON LEACH CHAMBERS WITH 4' OF NATIVE STONE ALL AROUND
COVER TO BE BUILT UP TO
WITHIN 6" OF FINISH GRADE
INSPECTION NOTE:
PRIOR TO FINAL INSPECTION BYTHE ENGINEER, SYSTEM NEEDS TO
BE COMPLETE INCLUDING BUILDUP FOR COVERS.
Proposed EL=63.5±
1.43
2' DROP
I,D=BO
H-20 /
-.,-'roposed EL=63.5±
19" Proposed
61.9± (9" Min- 36" Max)
I
61.15 I �
N I 1 ry
FILTER FABRIC
3/4"- 1-1/2" NATIVE STONE
ROOF RUNOFF DOWNSPOUT SECTION:
NOT TO SCALE
PROPOSED 6" ADS H DPE 'T' CONNECTION
PROPOSED 6" ADS HDPE
ROOF RUNOFF LEACHING SECTION:
NOT TO SCALE
1-1/2" WASHED STONE
SURROUNDING CHAMBERS
-PROPOSED DOWNSPOUT
(SEE ARCHITECTURAL PLANS FINISH GRADE
FOR DETAILS AND LOCATIONS)
-ADS DOWNSPOUT ADAPTER
--- J_ - w__
6" ADS HDPE FROM ROOF
PIPE SHALL EXTEND
FINISH GRADE 12" INSIDE CHAMBERS \\
MINIMUM 0% PITCH
6" ADS HDPE TO LEACHING -_
DRIVEWAY PAVEMENT SECTION:
NOT TO SCALE
_REQ_Ul_RED_ACCE_55_PR_UNING_ZO_NE_
r (12' TALL X 14' W/DEJ
I �
I �
10' (ACCESS)
2, 20 (PARKING) 21
1/4" PER FOOT PITCH
1" FINISH COVER (ROLLED)
1.5 BINDER COURSE (ROLLED)
4" DENSE GRADE CRUSHED STONE BASE (14' WIDE)
(MIN) 4" CLEAN SAND (SUB -BASE)
ALL DRIVEWAY FILL SHALL BE CLEAN SAND PLACED IN
(MAX) 6" LIFTS AND COMPACTED TO 95% DENSITY AS
DETERMINED BY THE MODIFIED PROCTOR TEST
59.15
USE THREE (3) SHOREY PRECAST
500GALLON LEACH CHAMBERS 38.7'±
Longest Run WITH 4' OF NATIVE STONE AROUND
- 15' (END VIEW)
LEACHING CHAMBER EL=20.4±PERCHED GROUNDWATER,
TEST HOLES 3 AND 4, LOT 14 (8 FAITH ROAD)
33.5' x 12.83' x 2.0'
CULTEC NO.410 NON -WOVEN GEOTEXTILE
(OR APPROVED EQUAL) AROUND TOP AND
SIDES OF STONE.
r 6" MINIMUM
/ NATURALLY COMPACTED FILL
.5'
-10.5' x 6.33' LEACHING FACILITY -
ONE (1) CULTEC RECHARGER 330XLHD
HEAVY DUTY CHAMBER WITH 1' STONE
AROUNDAND 6" STONE ABOVE AND BELOW..
CULTEC NO.4800 WOVEN GEOTEXTILE TO BE PLACED
BENEATH ALL INLET PIPES (FOR SCOUR PROTECT ON)
I A
�. 110
Aril
OeK
3
60 \
f
f
f
OPEN SPACE\
ROOF RUN-CFF LEACHING FACILITY, TYPICAL
(SEE DETAILS AND NOTES) \
f
Inn
123E
P- /�100
SCALE 1"=20' 1
n
� 32
OROO ON � ,65 •
R � Q O`r FN
-�O
\ \ \ 00
f \ \
�x
X
LIMIT OF WORKX
ROOF RUN-OFF NOTES:
1.) ALL ROOF GUTTERS SHOULD BE DIRECTLY CONNECTED TO
LEACHING FACILITIES USING 6" ADS PIPE.
2.) DWELLING SHALL UTILIZE A TOTAL OF (2) CULTEC
RECHARGER 330XLHD STORMWATER LEACHING UNITS, SPLIT
INTO (2) 10.5' x 6.33' LEACHING FACILITIES.
3.) LEACHING FACILITIES SHALL BE SET WITHIN A CLEAN SAND
BASE WITH ANY UNSUITABLE SOILS AND/OR ORGANIC
MATERIAL REMOVED. CHAMBERS SHALL BE SURROUNDED BY
6" STONE ON TOP AND BOTTOM, 12' STONE ON SIDES.
\ 15
V A
\ s \
LOT 5
LOT 6 \\ \\
0,567 SF± \ \
12.6'± \
\
5� � \ \ \
o \
Q16
T� Lz:L
JUL 2 6 2024
S �5'o HEALTH DEPT.
X
X'_
OPEN SPACE
0 20 40 60
SCALE 1"=20'
G:\"obs\THE DAVENPORT COMPANY -ROUTE 6A-YARMOUTHPORT\DWG\8807.SDS Plans.dv�
u1
N
n,o
m
m
Q1
rn
Y
0
0
m
c
ra
a.