HomeMy WebLinkAbout7 Faith Road Site & Sewage Disposal PlanVAPr\Anl ITIA
GENERAL NOTES:
A.) NEITHER DRIVEWAYS NOR PARKING AREAS ARE ALLOWED OVER SEPTIC SYSTEM
UNLESS H-20 COMPONENTS ARE USED.
B.) THE DESIGNER WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UN-
LESS CONSTRUCTED AS SHOWN. ANY CHANGES SHALL BE APPROVED IN WRITING.
C.) CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL
UNDERGROUND AND OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK.
CONSTRUCTION NOTES:
1.)ALLCONSTRUCTION SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE,
TITLE 5,AND THE REQUIREMENTS OF THE LOCAL BOARD OF HEALTH.
2.) SEPTICTANK(S), GREASE TRAP(S), DOSING CHAMBER(S) AND DISTRIBUTION
BOX(ES) SHALL BE SET ON A LEVEL STABLE BASE WHICH HAS BEEN MECHANICALLY
COMPACTED, OR ON A 6 INCH CRUSHED STONE BASE.
3.) SEPTICTANK(S) SHALL MEET ASTM STANDARD C1127-93 AND SHALL HAVE
AT LEASTTHREE 20" DIAMETER MANHOLES. THE MINIMUM DEPTH FROM THE BOT-
TOM OF THE SEPTIC TANK TO THE FLOW LINE SHALL BE 48".
4.) SCHEDULE 40 PVC INLET AND OUTLET TEES SHALL EXTEND A MINIMUM OF 6"
ABOVE THE FLOW LINE OF THE SEPTIC TANK AND SHALL BE INSTALLED ON THE
CENTERLINE OF THE TANK DIRECTLY UNDER THE CLEANOUT MANHOLE.
5.) RAISE COVERS OF THE SEPTIC TANK AND DISTRIBUTION BOX WITH PRECAST
CONCRETE WATERTIGHT RISERS OVER INLET AND OUTLET TEES TO WITHIN 6" OF
FINISH GRADE, OR AS APPROVED BY THE LOCAL BOARD OF HEALTH AGENT.
6.) PIPING SHALLCONSIST OF 4" SCHEDULE 40 PVC OR EQUIVALENT. PIPE SHALL
BE LAID ON A MINIMUM CONTINUOUS GRADE OF NOT LESS THAN 1%.
7.) DISTRIBUTION LINES FOR SOIL ABSORPTION SYSTEM (AS REQUIRED) SHALL BE
4" DIAMETER SCHEDULE 40 PVC LAID AT 0.005 FT/FT. LINE SHALL BE CAPPED
AT END OR AS NOTED.
8.) OUTLET PIPES FROM DISTRIBUTION BOX SHALL REMAIN LEVEL FOR AT LEAST
2' BEFORE PITCHING TO SOIL ABSORPTION SYSTEM. WATER TEST DISTRIBUTION
BOXTOASSURE EVEN DISTRIBUTION.
9.) DISTRIBUTION BOX SHALL HAVE A MINIMUM SUMP OF 6" MEASURED BELOW
THE OUTLET INVERT.
10.) BASE AGGREGATE FOR THE LEACHING FACILITY SHALL CONSIST OF 3/4" TO
1-1/2" DOUBLE WASHED NATIVE STONE FREE OF IRON, FINES AND DUST AND SHALL
BE INSTALLED BELOW THE CROWN OF THE DISTRIBUTION LINE TO THE BOTTOM OF THE
SOILABSORPTION SYSTEM. BASE AGGREGATE SHALL BE COVERED WITH FILTER FABRIC
OR APPROVED EQUIVALENT.
11.) VENT SOIL ABSORPTION SYSTEM WHEN DISTRIBUTION LINES EXCEED 50 FEET,
WHEN LOCATED EITHER IN WHOLE OR IN PART UNDER DRIVEWAYS, PARKING AREAS,
TURNING AREAS OR OTHER IMPERVIOUS MATERIAL,- OR WHEN PRESSURE DOSED.
12.) SOIL ABSORPTION SYSTEM SHALL BE COVERED WITH A MINIMUM OF 9" OF
CLEAN MEDIUM SAND (EXCLUDING TOPSOIL).
13.) FINISH GRADE SHALL BE A MAXIMUM OF 36" OVER THE TOP OF ALL SYSTEM
COMPONENTS, INCLUDING THE SEPTIC TANK, DISTRIBUTION BOX, DOSING CHAMBER
AND SOILABSORPTION SYSTEM. SEPTIC TANKS SHALL HAVE A MINIMUM COVER
OF 9".
14.) FROM THE DATE OF INSTALLATION OF THE SOIL ABSORPTION SYSTEM UNTIL
RECEIPT OF A CERTIFICATE OF COMPLIANCE, THE PERIMETER OF THE SOIL ABSORP
TION SYSTEM SHALL BE STAKED AND FLAGGED TO PREVENT THE USE OF SUCH
AREA FOR ALLACTIVITIES THAT MIGHT DAMAGE THE SYSTEM.
15.) SOIL REMOVAL: ALL LOAMY SAND SOIL LAYERS SHALL BE REMOVED FOR A
DISTANCE OF 5' FROM THE SOIL ABSORPTION SYSTEM DOWN TO THE 'C1 COARSE SAND'
LAYER. AREA TO BE BACKFILLED WITH CI rAN SAND AND COMPACTED TO MINIMIZE
SETTLING.
FLOW PROFILE:
NOT TO SCALE
TOP OF FOUNDATION
1 E L=41.0±
SAS DETAIL:
SCALE: 1" = 10'
[ TOTAL OF (4): (2) ST, (1) DB, (1) SAS ]
21" DIAMETER CONCRETE COVERS
RAISED TO WITHIN 6" OF
FINISH GRADE (OR AS NOTED)
(SEE NOTE #5)
f Proposed EL=40.0±
10" 14"
3" T 40"
T
'
GAS BAFFLE -
1500 GALLON
SEPTIC TANK
U-t5UA
SOIL TEST LOGS:
TEST HOLE 1: EL=40.6±
DEPTH FROM
SURFACE
(INCHES)
SOIL
HORIZON
SOIL
TEXTURE
(USDA)
SOIL
COLOR
(MUNSELL)
SOIL
MOTTLING
OTHER
0-10
A
Fine Loamy Sand
10YR3 2
NONE
10-32
B
Loamy Sand
10YR6 8
NONE
32-120
C1
I Medium- Coarse Sand
10YR7 6
INONE
I PERC @ 60"; <2 MIN IN
TFST HN F 7- FI =40.6±
DEPTH FROM
SURFACE
(INCHES)
SOIL
HORIZON
SOIL
TEXTURE
(USDA)
SOIL
COLOR
(MUNSELL)
SOIL
MOTTLING
OTHER
0-10
A
Fine LoamV Sand
10YR3 2
NONE
10-30
B
Loamy Sand
10YR6 8
NONE
30-120
C1
I Medium- Coarse Sand
10YR7 6
INONE
TEST HOI F 3 FI_=40.2±
DEPTH FROM
SURFACE
(INCHES)
SOIL
HORIZON
SOIL
TEXTURE
(USDA)
SOIL
COLOR
(MUNSELL)
SOIL
MOTTLING
OTHER
0-10
A
Fine Loamy Sand
10YR3 2
NONE
10-26
B
Loamy Sand
10YR6 8
NONE
26-148
C1
Medium- Coarse Sand
10YR7 6
I NONE
I PERC 66"• <2 MIN IN
TFST Hni F 4- FI =40.2±
DEPTH FROM
SURFACE
(INCHES)
SOIL
HORIZON
SOIL
TEXTURE
(USDA)
SOIL
COLOR
(MUNSELL)
SOIL
MOTTLING
OTHER
0-10
A
Fine Loamy Sand
10YR3 2
NONE
10-24
B
Loamy Sand
10YR6 8
NONE
24-146
1 C1
Medium- Coarse Sand
10YR7 6
I NONE
DATE OF TESTING: 10/26/2023
PERCOLATION RATE: LESS THAN 2 MIN/INCH IN'Cl' LAYER.
WITNESSED BY: ROBERT REEDY, P.E., J.M. O'REILLY & ASSOCIATES, INC.
BARRY LEWIS, YARMOUTH HEALTH DEPARTMENT
NO WATER ENCOUNTERED
USE A LOADING RATE OF 0.74 GPD/SF FOR SIZING OF SOIL ABSORPTION SYSTEM.
SYSTEM DESIGN CALCULATIONS:
SEWAGE DESIGN FLO I ,`I `�\k, �1 Nome
4 BEDROOM D ELLIN - 40 GPD �1� c/
LEACHING CAPACITY REQUIREM V ay1
4 BEDROOMS (MAX.)110 GPD 440 G D REQUIRED
SEPTIC TANK CAPACITY REQUIREDi
DAILY FLOW= 4 PD 20 % 88O G L. REQUIRED
SEPTIC TANK CAPACrl� _PROVID
�5 0 GALLON EPT TANK M L WED)
CE HING C ITY PROVIDEM
ONE .5 X 1 X 2.0 LEACHING CHAMBER CAN LEACH:
Vt=[(33.5 X 2.83) + (33.5 X 2.0)2 + (12.83 X 2.0)2] X 0.74 GPD/SF1455.10 GPD
�45S GGPD>, GPD REC�QIRED
NOTE: A,,GARBAGE DISP AL I .0tPERMITTED WITH THIS DESIGN.
I NSTALLa✓
ONE 1 - 1500 GALLON SEPT� TANK
ONE (1)- 3 OUTLET DISTRIBUTION BOX (H-20 RATED)
THR EE (\00 GALLON LEACH CHAMBERS WlTtL4' OF NATIVE STONE ALL AROUND
COVER TO BE BUILT UP TO
WITHIN 6" OF FINISH GRADE
INSPECTION NOTE:
PRIOR TO FINAL INSPECTION BY THE ENGINEER, SYSTEM NEEDS TO
BE COMPLETE INCLUDING BUILDUP FOR COVERS.
38.2+
J�
36.75
.70
2"
t-- 2'
DB-3
D BOX
H-20
E L=40.0±
'roposed EL=40.0±
ROOF RUNOFF DOWNSPOUT SECTION:
NOT TO SCALE
PROPOSED 6" ADS HDPE 'T' CONNECTION
PROPOSED 6" ADS HDPE
PROPOSED DOWNSPOUT
(SEE ARCHITECTURAL PLANS
FOR DETAILS AND LOCATIONS)
ADS DOWNSPOUT ADAPTER
FINISH GRADE
MINIMUM 0% PITCH
6" ADS HDPE TO LEACHING -_
DRIVEWAY PAVEMENT SECTION:
NOT TO SCALE
_REQUIRED _ACCE_55 PRUNING_ZONE
_
r (12' TALL )(14' WIDE)
I I
I I
i 10' (ACCESS) i G
2, 20 (PARKING) 21
1/4" PER FOOT PITCH - �'L1�'
1" FINISH COVER (ROLLED)
1.5" BINDER COURSE (ROLLED)
4" DENSE GRADE CRUSHED STONE BASE (14' WIDE)
(MIN) 4" CLEAN SAND (SUB -BASE)
ALL DRIVEWAY FILL SHALL BE CLEAN SAND PLACED IN
(MAX) 6" LIFTS AND COMPACTED TO 95% DENSITY AS
DETERMINED BY THE MODIFIED PROCTOR TEST
36" Proposed
37.0± (9" Mir- 36" Max)
FILTER FABRIC
\ 36.25 3/4"- 1-112" NATIVE STONE
N N
/J 34.25
USE TI-REE (3) SHOREY PRECAST
500GALLON LEACH CHAMBERS 13.8'±
Longest Run WITH 4' OF NATIVE STONE AROUND
- 15' � (END VIEW)
LEACHING CHAMBER iEL=20.4± PERCHED GROUNDWATER,
TEST HOLES 3 AND 4, LOT 14 (8 FAITH ROAD)
33.5' x 12.83' x 2.0'
ROOF RUNOFF LEACHING SECTION:
NOT TO SCALE
1-112" WASHED STONE
SURROUNDING CHAMBERS
FINISH GRADE_
CULTEC NO. 410 NON -WOVEN GEOTEXTILE
(OR APPROVED EQUAL) AROUND TOP AN D
SIDES OF STONE.
(� 6" MINIMUM
/ NATURALLY COMPACTED FILL
ROOF RUN-OFF NOTES:
1.) ALL ROOF GUTTERS SHOULD BE DIRECTLY CONNECTED TO
LEACHING FACILITIES USING 6" ADS PIPE.
2.) DWELLING SHALL UTILIZE A TOTAL OF (2) CULTEC
RECHARGER 330XLHD STORMWATER LEACHING UNITS, SPLIT
INTO (2) 10.5' x 6.33' LEACHING FACILITIES.
3.) LEACHING FACILITIES SHALL BE SET WITHIN A CLEAN SAND
BASE WITH ANY UNSUITABLE SOILS AND/OR ORGANIC
MATERIAL REMOVED. CHAMBERS SHALL BE SURROUNDED BY
6" STONE ON TOP AND BOTTOM, 12' STONE ON SIDES.
-► " � \�-�Clintot��
6' ADS HDPE FROM ROOF " ' 30.5Dr
PIPE SHALL EXTEND -161. Ln
12" INSIDE CHAMBERS - Q)
NOT TO SCALE
12" 8.5' 2" rn
oi
rn
\_105x 6.33' LEACHING FACILITY- o PLAN BOOK 699 PAGE 51
ONE (1) CULTEC RECHARGER 330XLHD o DEED BOOK 35682 PAGE 239
HEAVY DUTY CHAMBER WITH 1' STONE CO ASSESSORS' MAP 125 PARCEL 39
AROUNDAND 6" STONE ABOVE AND BELOW.. 2
a
CULTEC NO.4800 WOVEN GEOTEXTILE TO BE PLACED LEGEND
BENEATH ALL INLET PIPES (FOR SCOUR PROTECTION)
KI EXISTING CONTOUR
32 PROPOSED CONTOUR
24x5 PROPOSED SPOT GRADE
-W- WATER SERVICE LINE
z TEST HOLE / BORING LOCATION
ST SEPTIC TANK
DB DISTRIBUTION BOX
SAS SOIL ABSORPTION SYSTEM
RES RESERVED FOR FUTURE
® CATCH BASIN
Z7 FIRE HYDRANT
S STEP
BH BULKHEAD
-%-X- LIMIT OF WORK
STORMWATER FLOW ARROW
OPEN SPA(
PITCH RUNOFF
LOT 14 STORMWATE
ROOF RUN-OFF LEACHING FACILITY, TYPICAL
(SEE DETAILS AND NOTES)
SCALE 1"=20'
NOTE: SET BENCHMARK(S) DURIN
REVISED 6/11/2024: ADJUSTED GRADING AND ELEVATIONS.
NSTRUCTION.1
THE DAVENPORT COMPANIES
20 NORTH MAIN STREET, YARMOUTH, MA
SITE & SEWAGE DISPOSAL SYSTEM DESIGN
7 FAITH ROAD (LOT 13), YARMOUTHPORT, MA
J.M. OTEILLY & ASSOCIATES, INC.
Professional Engineering & Land Surveying Services
1573 Main Street - Route BA
20 40 60 P.O. Box 1773
(508)896-6601 Office Brewster, MA 02631
SCALE 1"=20' DATE: SCALE: BY: CHECK:
G:\AAJobs\THE DAVENPORT COMPANY -ROUTE 6A-YARMOUTHPORT\DWG\8807.SDS Plans.dwg 12/1/2023 AS Noted RFR JMO
(508)896-6602 Fax