HomeMy WebLinkAbout8 Stormwater plansCOMPLETE SET 8 SHEETS PROJECT LOCATION NATIONAL GRID SOUTH YARMOUTH LNG PERMIT DRAWINGS NOVEMBER 2025 LIST OF DRAWINGS SHEET NO.DRAWING NO.REVISION NO.DRAWING TITLE CHIV PROJECT DOCUMENT NO. 1 G-001 REV2 2 COVER SHEET 23510-CIV-DWG-0000-0020 2 G-002 REV2 2 GENERAL NOTES, LEGEND & ABBREVIATIONS 23510-CIV-DWG-0000-0021 3 C-101 REV3 3 EXISTING CONDITIONS SITE PLAN 23510-CIV-DWG-0000-0022 4 C-102 REV2 2 EROSION CONTROL & SITE DEMOLITION PLAN 23510-CIV-DWG-0000-0023 5 C-103 REV2 2 SITE LAYOUT & MATERIALS PLAN 23510-CIV-DWG-0000-0024 6 C-104 REV3 3 GRADING & DRAINAGE PLAN 23510-CIV-DWG-0000-0025 7 C-201 REV2 2 SITE DETAILS - 1 23510-CIV-DWG-0000-0026 8 C-202 REV2 2 SITE DETAILS - 2 23510-CIV-DWG-0000-0027 N LOCATION MAP SCALE: 1" = 2000' DESIGNED/CHECKED BY: DRAWN BY: FILE: DATE: APPROVED BY: South Yarmouth LNG CH-IV Houston, TX PROJECT NO: MARK DATE DESCRIPTION C5200-001-30% Plan Set.dwg 11/14/2023 C5200-001 SCALE:Plotted On:Dec 10, 2025-2:49pm By: APaoliLast Saved: 12/10/2025Tighe & Bond:J:\C\C5200 CH-IV\South Yarmouth LNG - 001\Drawings\AutoCAD\Sheet\C5200-001-30% Plan Set.dwgPERMIT DRAWINGS - NOT FOR CONSTRUCTION AEP TJG BSH South Yarmouth, MA G-001 REV2 COVER SHEET NO SCALE 23510-CIV-DWG-0000-0020 IFD 4/4/2024 ISSUED FOR DISTRIBUTION 0 4/1/2025 ISSUED FOR RFP PREPARED BY: PREPARED FOR: CH-IV Houston, TX BRIAN S. HUNTLEY, PE TIMOTHY J. GRACE, PE 1 11/7/2025 PERMIT DRAWINGS PERMIT DRAWINGS - NOT FOR CONSTRUCTION 2 12/8/2025 CLIENT COMMENTS G-002 REV2 GENERAL NOTES, LEGEND & ABBREVIATIONS NO SCALE DESIGNED/CHECKED BY: DRAWN BY: FILE: DATE: APPROVED BY: South Yarmouth LNG CH-IV Houston, TX PROJECT NO: MARK DATE DESCRIPTION C5200-001-30% Plan Set.dwg 11/14/2023 C5200-001 SCALE:Plotted On:Dec 10, 2025-2:49pm By: APaoliLast Saved: 12/10/2025Tighe & Bond:J:\C\C5200 CH-IV\South Yarmouth LNG - 001\Drawings\AutoCAD\Sheet\C5200-001-30% Plan Set.dwgPERMIT DRAWINGS - NOT FOR CONSTRUCTION AEP TJG BSH South Yarmouth, MA EXISTING PROPOSEDDESCRIPTION ABBREVIATIONS ABDN('D)ABANDON(ED) AC ASBESTOS CEMENT PIPE BC BITUMINOUS CURB BFP BACK FLOW PREVENTER BIT BITUMINOUS BL BASELINE BLDG BUILDING BND BOUND BOC BOTTOM OF CURB BOT BOTTOM BS BOTTOM OF STEP BW BOTTOM OF WALL CATV CABLE TELEVISION CB CATCH BASIN CEM CEMENT CI CAST IRON PIPE CL CENTERLINE CLF CHAIN LINK FENCE CO CLEAN OUT CONC CONCRETE CPP CORRUGATED POLYETHYLENE PIPE CY CUBIC YARD DH DRILL HOLE DI DUCTILE IRON PIPE DIA DIAMETER DMH DRAIN MANHOLE E EAST EF EACH FACE EG EXISTING GRADE EL/ELEV ELEVATION ELEC ELECTRIC EMH ELECTRIC MANHOLE EOP EDGE OF PAVEMENT EW EACH WAY EXIST EXISTING FES FLARED END SECTION FF FINISH FLOOR FM FORCE MAIN G GAS GG GAS GATE GRAN GRANITE HC HANDICAP HDPE HIGH DENSITY POLYETHYLENE HMA HOT MIX ASPHALT HYD HYDRANT IN INCHES INV INVERT IP IRON PIN L LENGTH OF CURB LCB LEACHING CATCH BASIN LP LIGHT POLE LT LEFT MAX MAXIMUM MH MANHOLE MIN MINIMUM MISC MISCELLANEOUS MON MONUMENT MJ MECHANICAL JOINT PROPERTY LINE LIMITS OF WORK INTERMEDIATE CONTOURS INDEX CONTOURS SPOT GRADE MAGNITUDE & DIRECTION OF SLOPE STORM DRAIN UNDERGROUND ELECTRIC GAS SERVICE CURB EDGE OF PAVEMENT FENCE - CHAIN LINK GUARDRAIL STORM DRAIN STRUCTURES WATER SERVICE STRUCTURES GAS SERVICE STRUCTURES ELECTRIC SERVICE STRUCTURES TREELINE GRAVEL ACCESS PATH HOT MIX ASPHALT DRIVEWAY 0.0% LEGEND ABBREVIATIONS CONT'D N NORTH NITC NOT IN THIS CONTRACT NTS NOT TO SCALE N/A NOT APPLICABLE N/F NOW OR FORMERLY OC ON CENTER OCS OUTLET CONTROL STRUCTURE OH OVERHEAD PB PLANT BED PC POINT OF CURVATURE PCC POINT OF COMPOUND CURVATURE PE POLYETHYLENE PIPE PERF PERFORATED PI POINT OF INTERSECTION PRC POINT OF REVERSE CURVATURE PSF POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE INCH PT POINT OF TANGENCY PVC POLYVINYLCHLORIDE PVMT PAVEMENT R RADIUS RCP REINFORCED CONCRETE PIPE RD ROOF DRAIN REV REVISION ROW RIGHT OF WAY RT RIGHT R&D REMOVE AND DISPOSE R&R REMOVE AND RESET R&S REMOVE AND STACK S SOUTH SAN SANITARY SCH SCHEDULE SF SQUARE FOOT SMH SEWER MANHOLE SS STAINLESS STEEL STA STATION STL STEEL STRM STORM T TANGENT LENGTH TC TOP OF CURB TEL TEL-DATA TP TEST PIT TS TOP OF STEP TW TOP OF WALL TYP TYPICAL UP UTILITY POLE W WATER WG WATER GATE WV WATER VALVE WWF WELDED WIRE FABRIC XFMR TRANSFORMER DEMOLITION / GEOTECHNICAL EROSION & SEDIMENT CONTROL UTILITY TO BE DEMOLISHED ITEM TO BE DEMOLISHED LEGEND 25 EROSION CONTROL AND RESOURCE AREA PROTECTION NOTES 1.PROVIDE ALL EROSION CONTROL MEASURES SHOWN, SPECIFIED, REQUIRED BY PERMIT, AND/OR REQUIRED BY THE ENGINEER PRIOR TO ANY CONSTRUCTION OR IMMEDIATELY UPON REQUEST. MAINTAIN SUCH CONTROL MEASURES UNTIL FINAL SURFACE TREATMENTS ARE IN PLACE AND/OR UNTIL PERMANENT VEGETATION IS ESTABLISHED. INSPECT AFTER EACH RAINSTORM AND DURING MAJOR STORM EVENTS TO CONFIRM THAT ALL SEDIMENTATION AND EROSION CONTROL MEASURES REQUIRED ARE IN PLACE AND EFFECTIVE. 2.INSTALL SILT SACKS OR OTHER APPROVED SEDIMENTATION BARRIERS IN/AT ALL CATCH BASINS IN THE PROJECT AREA. 3.COMPACT, STABILIZE, AND LOAM AND SEED SIDE SLOPES, SHOULDER AREAS AND DISTURBED VEGETATED AREAS IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND AS REQUIRED BY PERMITS. GRADE SIDE SLOPES, SHOULDER AREAS AND DISTURBED VEGETATED AREAS TO A MAXIMUM SLOPE OF 3 HORIZONTAL TO 1 VERTICAL (3H:1V), WHERE POSSIBLE. PROVIDE BIODEGRADABLE EROSION CONTROL BLANKETS TO PREVENT EROSION WHERE SLOPES ARE STEEPER THAN 3H:1V. 4.SETTLE OR FILTER ALL SILT-LADEN WATER FROM DEWATERING ACTIVITIES IN A SEDIMENTATION OR FILTER BAG TO REMOVE SEDIMENTS PRIOR TO RELEASE USING A SEDIMENTATION OR FILTER BAG LOCATED DOWN-GRADIENT OF THE DEWATERED AREA. 5.REMOVE AND PROPERLY DISPOSE OF SILT TRAPPED AT BARRIERS IN UPLAND AREAS OUTSIDE BUFFER ZONES. REMOVE MATERIALS DEPOSITED IN ANY TEMPORARY SETTLING BASINS AT THE COMPLETION OF THE PROJECT. RESTORE ALL DISTURBED AREAS TO THEIR PRECONSTRUCTION CONDITION. 6.SWEEP, COLLECT, REMOVE AND DISPOSE OF ANY SEDIMENT TRACKED ONTO PUBLIC RIGHT-OF-WAYS AT THE END OF EACH DAY. 7.LOAM AND SEED ALL DISTURBED VEGETATED AREAS TO ESTABLISH COVER AND STABILIZATION AS SOON AS POSSIBLE FOLLOWING DISTURBANCE. 8.MAINTAIN AN ADDITIONAL SUPPLY OF EROSION CONTROL MEASURES ON-SITE FOR EMERGENCY REPAIRS. 9.STORE FUEL, OIL, PAINT, OR OTHER HAZARDOUS MATERIALS IN A SECONDARY CONTAINER AND REMOVE TO A SECURE LOCKED AND COVERED AREA DURING NON-WORK HOURS. 10.PROVIDE A SUPPLY OF ABSORBENT SPILL RESPONSE MATERIALS SUCH AS BOOMS, BLANKETS, AND OIL ABSORBENT MATERIALS AT THE CONSTRUCTION SITE AT ALL TIMES TO CLEAN UP POTENTIAL SPILLS OF HAZARDOUS MATERIALS. IMMEDIATELY REPORT SPILLS OF HAZARDOUS MATERIALS TO THE STATE ENVIRONMENTAL AGENCY AND THE MUNICIPALITY WHERE THE WORK IS OCCURRING. GENERAL NOTES 1.NOTIFY DIGSAFE AT 1-888-344-7233 AND OTHER UTILITY OWNERS IN THE AREA NOT ON THE DIGSAFE LIST AT LEAST 72 HOURS PRIOR TO ANY DIGGING, TRENCHING, ROCK REMOVAL, DEMOLITION, BORING, BACKFILLING, GRADING, LANDSCAPING, OR ANY OTHER EARTH MOVING OPERATIONS. 2.LOCATIONS OF EXISTING UTILITIES ARE APPROXIMATE. IN ADDITION, SOME UTILITIES MAY NOT BE SHOWN. DETERMINE THE EXACT LOCATION OF UTILITIES BY TEST PIT OR OTHER METHODS, AS NECESSARY TO PREVENT DAMAGE TO UTILITIES AND/OR INTERRUPTIONS IN UTILITY SERVICE. PERFORM TEST PIT EXCAVATIONS AND OTHER INVESTIGATIONS TO LOCATE UTILITIES, AND PROVIDE THIS INFORMATION TO THE ENGINEER, PRIOR TO CONSTRUCTING THE PROPOSED IMPROVEMENTS. LOCATE ALL EXISTING UTILITIES TO BE CROSSED BY HAND EXCAVATION. 3.NOT ALL OF THE UTILITY SERVICES TO BUILDINGS ARE SHOWN. THE CONTRACTOR SHALL ANTICIPATE THAT EACH PROPERTY HAS SERVICE CONNECTIONS FOR THE VARIOUS UTILITIES. 4.BOLD TEXT AND LINES INDICATE PROPOSED WORK. LIGHT TEXT AND LINES INDICATE APPROXIMATE EXISTING CONDITIONS. 5.TIGHE & BOND ASSUMES NO RESPONSIBILITY FOR ANY ISSUES, LEGAL OR OTHERWISE, RESULTING FROM CHANGES MADE TO THESE DRAWINGS WITHOUT WRITTEN AUTHORIZATION FROM TIGHE & BOND. 6.EXCAVATE ADDITIONAL TEST PITS TO LOCATE EXISTING UTILITIES AS DIRECTED OR APPROVED BY THE ENGINEER. 7.NOTIFY THE ENGINEER OF ANY UTILITIES IDENTIFIED DURING CONSTRUCTION THAT ARE NOT SHOWN ON THE DRAWINGS OR THAT DIFFER IN SIZE OR MATERIAL. 8.THE CONTRACTOR IS RESPONSIBLE FOR SITE SAFETY; COORDINATION WITH THE OWNER, ALL SUBCONTRACTORS, AND WITH OTHER CONTRACTORS WORKING WITHIN THE LIMITS OF WORK, THE MEANS AND METHODS OF CONSTRUCTING THE PROPOSED WORK. 9.OBTAIN, PAY FOR AND COMPLY WITH PERMITS, NOTICES AND FEES NECESSARY TO COMPLETE THE WORK. ARRANGE AND PAY FOR NECESSARY INSPECTIONS AND APPROVALS FROM THE JURISDICTIONAL AUTHORITIES. 10.SHORE UTILITY TRENCHES WHERE FIELD CONDITIONS DICTATE AND/OR WHERE REQUIRED BY LOCAL, STATE AND FEDERAL HEALTH AND SAFETY CODES. 11.FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO CONSTRUCTION. IF FIELD CONDITIONS ARE OBSERVED THAT VARY SIGNIFICANTLY FROM THOSE SHOWN ON THE DRAWINGS, IMMEDIATELY NOTIFY THE ENGINEER IN WRITING FOR RESOLUTION OF THE CONFLICTING INFORMATION. 12.PROTECT AND MAINTAIN ALL UTILITIES IN THE AREAS UNDER CONSTRUCTION DURING THE WORK. LEAVE ALL PIPES AND STRUCTURES WITHIN THE LIMITS OF THE CONTRACT IN A CLEAN AND OPERABLE CONDITION AT THE COMPLETION OF THE WORK. TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SAND AND SILT FROM DISTURBED AREAS FROM ENTERING THE DRAINAGE SYSTEM. 13.NOTIFY THE ENGINEER IN WRITING OF ANY CONFLICT, ERROR, AMBIGUITY, OR DISCREPANCY WITH THE PLANS OR BETWEEN THE PLANS AND ANY APPLICABLE LAW, REGULATION, CODE, STANDARD SPECIFICATION, OR MANUFACTURER'S INSTRUCTIONS. 14.THE CONTRACTOR IS RESPONSIBLE FOR SUPPORT OF EXISTING UTILITIES AND REPAIR OR REPLACEMENT COSTS OF UTILITIES DAMAGED DURING CONSTRUCTION, WHETHER ABOVE OR BELOW GRADE. REPLACE DAMAGED UTILITIES IMMEDIATELY AT NO ADDITIONAL COST TO THE OWNER AND AT NO COST TO THE PROPERTY OWNER. 15.TAKE NECESSARY MEASURES AND PROVIDE CONTINUOUS BARRIERS OF SUFFICIENT TYPE, SIZE, AND STRENGTH TO PREVENT ACCESS TO ALL WORK AND STAGING AREAS AT THE COMPLETION OF EACH DAYS WORK. 16.NO OPEN TRENCHES WILL BE ALLOWED OVER NIGHT. THE USE OF ROAD PLATES TO PROTECT THE EXCAVATION WILL BE CONSIDERED UPON REQUEST, BUT BACKFILLING IS PREFERRED. 17.MAINTAIN EMERGENCY ACCESS TO ALL PROPERTIES WITHIN THE PROJECT AREA AT ALL TIMES DURING CONSTRUCTION. 18.WHEN WORKING IN THE ROAD, PROVIDE THE OWNER AND LOCAL FIRE/POLICE/SCHOOL AUTHORITIES A DETAILED PLAN OF APPROACH INDICATING METHODS OF PROPOSED TRAFFIC ROUTING ON A DAILY BASIS. PROVIDE COORDINATION TO ENSURE COMMUNICATION AND COORDINATION BETWEEN THE OWNER, CONTRACTOR AND LOCAL FIRE/POLICE/SCHOOL AUTHORITIES THROUGHOUT THE CONSTRUCTION PERIOD. 19.REMOVE AND DISPOSE OF ALL CONSTRUCTION-RELATED WASTE MATERIALS AND DEBRIS IN STRICT ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL LAWS. 20.THE TERM "DEMOLISH" USED ON THE DRAWINGS MEANS TO REMOVE AND DISPOSE OF IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REQUIREMENTS. 21.THE TERM "ABANDON" USED ON THE DRAWINGS MEANS TO LEAVE IN PLACE AND TAKE APPROPRIATE MEASURES TO DECOMMISSION AS SPECIFIED OR NOTED ON THE DRAWINGS. 22.ALL PROPOSED WORK MAY BE ADJUSTED IN THE FIELD BY THE OWNER'S PROJECT REPRESENTATIVE TO MEET EXISTING CONDITIONS. BASE PLAN NOTES 1.THE EXISTING CONDITIONS INFORMATION SHOWN ON THE DRAWINGS IS BASED ON THE FOLLOWING: 2.SURVEY DRAWINGS PROVIDED BY SGC TITLED BOUNDARY & EXISTING CONDITIONS SURVEY OF WHITES PATH PREPARED FOR NATIONAL GRID AND DATED 10/31/2025 3.UTILITY LOCATIONS SHOWN WERE PLOTTED FROM INFORMATION SUPPLIED BY RESPECTIVE UTILITY COMPANIES AND DATA OBTAINED FROM FIELD SURVEYS AND AS BUILT DRAWINGS. THE ACCURACY AND COMPLETENESS OF SUBSURFACE INFORMATION SHOWN ON THESE DRAWINGS IS NOT GUARANTEED. DETERMINE THE LOCATIONS AND ELEVATIONS OF ALL UTILITIES WHICH MAY AFFECT CONSTRUCTION OPERATIONS. 4.THE DRAWINGS ARE BASED ON THE FOLLOWING DATUMS: HORIZONTAL-NAD83 ; VERTICAL-NAVD88 5.THE EXISTING CONDITIONS SHOWN ARE APPROXIMATE. FIELD VERIFY EXISTING CONDITIONS. SURFACE RESTORATION NOTES 1.ALL PAVEMENT DAMAGED BY THE CONTRACTOR'S OPERATIONS SHALL BE REPLACED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. 2.PROTECT PROJECT FEATURES (E.G., WALLS, FENCES, MAIL BOXES, SIGNS, SIDEWALKS, CURBING, STAIRS, WALKWAYS, TREES, ETC.) FROM DAMAGE DURING CONSTRUCTION, INCLUDING PROVIDING TEMPORARY SUPPORTS, WHEN APPROPRIATE. 3.IF REMOVAL OF PROJECT FEATURES IS REQUIRED IN ORDER TO PERFORM THE PROPOSED WORK, REMOVE THOSE SITE FEATURES ONLY UPON APPROVAL OF ENGINEER. REPLACE ALL REMOVED PROJECT FEATURES; NEW ITEMS SHALL BE EQUAL OR BETTER IN QUALITY AND CONDITION TO THE ITEMS REMOVED. 4.EXISTING SURVEY MONUMENTS DISTURBED BY THE CONTRACTOR SHALL BE REPLACED BY A LAND SURVEYOR LICENSED IN THE STATE IN WHICH THE WORK IS PERFORMED AT NO ADDITIONAL COST TO THE OWNER. 5.COORDINATE THE ADJUSTMENT OF EXISTING UTILITY STRUCTURES WITH EACH RESPONSIBLE UTILITY OWNER PRIOR TO RECONSTRUCTION AND/OR PAVING OPERATIONS. RAISE ALL STRUCTURES TO FINISHED GRADES PRIOR TO THE END OF THE CONSTRUCTION SEASON AND PRIOR TO FINISHED PAVING. 6.REPAIR DISTURBED PAVED SURFACES AT THE END OF EACH WORK WEEK, UNLESS OTHERWISE APPROVED/REQUIRED BY THE OWNER. 7.PLACE TEMPORARY BITUMINOUS CONCRETE PAVEMENT AT DISTURBED PORTLAND CEMENT CONCRETE SIDEWALKS AND DRIVEWAYS AT THE END OF EACH WORK WEEK, UNLESS OTHERWISE APPROVED/REQUIRED BY THE OWNER. 8.TRANSFER ALL TEMPORARY BENCHMARKS, AS NECESSARY. 9.REGRADE ALL UNPAVED AREAS DISTURBED BY THE WORK AS REQUIRED. REPAIR/REPLACE PAVED SURFACES DISTURBED BY THE WORK IN-KIND, UNLESS OTHERWISE NOTED. RESTORE SURFACES TO EXISTING OR PROPOSED CONDITIONS AS INDICATED ON THE DRAWINGS. 10.PROVIDE A SMOOTH, FLUSH TRANSITION BETWEEN ALL NEW AND EXISTING PAVEMENTS AND WALKING SURFACES. 96.50 MANHOLE CATCH BASIN D IFD 4/4/2024 ISSUED FOR DISTRIBUTION 23510-CIV-DWG-0000-0021 0 4/1/2025 ISSUED FOR RFP 1 11/7/2025 PERMIT DRAWINGS 2 12/8/2025 CLIENT COMMENTS N C-101 REV3 EXISTING CONDITIONS SITE PLAN 00 40'80' SCALE: 1" = 40' 1" = 40' DESIGNED/CHECKED BY: DRAWN BY: FILE: DATE: APPROVED BY: South Yarmouth LNG CH-IV Houston, TX PROJECT NO: MARK DATE DESCRIPTION C5200-001-30% Plan Set.dwg 11/14/2023 C5200-001 SCALE:Plotted On:Dec 10, 2025-2:49pm By: APaoliLast Saved: 12/10/2025Tighe & Bond:J:\C\C5200 CH-IV\South Yarmouth LNG - 001\Drawings\AutoCAD\Sheet\C5200-001-30% Plan Set.dwgPERMIT DRAWINGS - NOT FOR CONSTRUCTION AEP TJG BSH South Yarmouth, MA IFD 4/4/2024 ISSUED FOR DISTRIBUTION 23510-CIV-DWG-0000-0022 1 4/1/2025 ISSUED FOR RFP 2 11/7/2025 PERMIT DRAWINGS 3 12/8/2025 CLIENT COMMENTS N C-102 REV2 EROSION CONTROL & SITE DEMOLITION PLAN 00 40'80' SCALE: 1" = 40' 1" = 40' DESIGNED/CHECKED BY: DRAWN BY: FILE: DATE: APPROVED BY: South Yarmouth LNG CH-IV Houston, TX PROJECT NO: MARK DATE DESCRIPTION C5200-001-30% Plan Set.dwg 11/14/2023 C5200-001 SCALE:Plotted On:Dec 10, 2025-2:49pm By: APaoliLast Saved: 12/10/2025Tighe & Bond:J:\C\C5200 CH-IV\South Yarmouth LNG - 001\Drawings\AutoCAD\Sheet\C5200-001-30% Plan Set.dwgPERMIT DRAWINGS - NOT FOR CONSTRUCTION AEP TJG BSH South Yarmouth, MA CLEAR & GRUB AREA AS REQUIRED STRIP & STOCK PILE OR EXPORT EXISTING TOPSOIL DEMO ALL EXISTING CHAIN LINK FENCE WITHIN LIMITS SHOWN DEMO EXISTING LIGHT POLES & CONDUIT ALONG FENCE LINE INSTALL SILT SACKS IN ALL EXISTING DRAINAGE STRUCTURES (TYP) INSTALL SILT SACKS IN ALL EXISTING DRAINAGE STRUCTURES (TYP) SAWCUT EXIST. PAVEMENT DO NOT DISTURB EXISTING TANK AND LNG INFRASTRUCTURE DURING CONSTRUCTION. DEMO EXISTING TANK AND INFRASTRUCTURE AFTER NEW TANK IS OPERATIONAL DEMO EXISTING CHAIN LINK FENCE AND REPLACE W/ POROUS VAPOR FENCE IFD 4/4/2024 ISSUED FOR DISTRIBUTION EXISTING SECURITY FENCE TO REMAIN EXISTING INTERIOR SECURITY FENCE TO REMAIN DEMO EXIST CHAIN LINK FENCE AND REPLACE W/ POROUS VAPOR FENCE SHEET NOTE: 1.NEW SECURITY FENCING TO BE ADDED BEFORE DEMOLITION OF EXISTING FENCING. 23510-CIV-DWG-0000-0023 0 4/1/2025 ISSUED FOR RFP 1 11/7/2025 PERMIT DRAWINGS EROSION CONTROL BARRIER INSTALL TRENCH DRAIN SEDIMENT CONTROL (TYP) CONSTRUCTION ENTRANCE SAWCUT EXIST. PAVEMENT DEMO EXIST CHAIN LINK FENCE AND REPLACE W/ POROUS VAPOR FENCE 2 12/8/2025 TEMPORARY ACCESS DRIVE. RESTORE TO EXISTING AT COMPLETION OF PROJECT CLIENT COMMENTS XXXXXXXXXXXX X X X X X X X X X X N C-103 REV2 SITE LAYOUT & MATERIALS PLAN 00 40'80' SCALE: 1" = 40' 1" = 40' DESIGNED/CHECKED BY: DRAWN BY: FILE: DATE: APPROVED BY: South Yarmouth LNG CH-IV Houston, TX PROJECT NO: MARK DATE DESCRIPTION C5200-001-30% Plan Set.dwg 11/14/2023 C5200-001 SCALE:Plotted On:Dec 10, 2025-2:49pm By: APaoliLast Saved: 12/10/2025Tighe & Bond:J:\C\C5200 CH-IV\South Yarmouth LNG - 001\Drawings\AutoCAD\Sheet\C5200-001-30% Plan Set.dwgPERMIT DRAWINGS - NOT FOR CONSTRUCTION AEP TJG BSH South Yarmouth, MA GRAVEL FIRE ROAD 10' HT. POROUS VAPOR FENCE SECURITY FENCE TIMBER GUARDRAIL INFILTRATION BASIN 20' WIDE HOT MIX ASPHALT DRIVEWAY 30'R 30'R 20'R EROSION CONTROL BARRIER 50'R 50'R 80'R 20'55'BIT CONC BERM BIT CONC BERM 40'R 30'R FLUSH TRANSITION BETWEEN NEW AND EXISTING PAVEMENTS (TYP) FLUSH TRANSITION BETWEEN NEW AND EXISTING PAVEMENTS (TYP) 20'R 15'R 30'R 20'R LIQUID NITROGEN STORAGE TANK, VAPORIZERS AND RECEIVER NEW HEATER AND RELOCATED EXISTING HEATERS LNG IMPOUNDMENT EXISTING SECURITY FENCE 10' HT. POROUS VAPOR FENCE NEW EDGE OF WOODS 20' IFD 4/4/2024 ISSUED FOR DISTRIBUTION30'23510-CIV-DWG-0000-0024 0 4/1/2025 ISSUED FOR RFP EXISTING ACCESS DRIVE PROPOSED FULL CONTAINMENT LNG STORAGE TANK 177' 85' 108'162'N:2714306.92 E: 1011307.45 N:2714171.42 E: 1011157.84 209'93'PEASTONE SURFACE COVER WITHIN TANK AREA 10'R 30'R 20'R 30'R 45'R 60'R 20'R 30'R N: 2714020.37 E: 1011297.44 N:2714216.71 E: 1011465.14 1 11/7/2025 PERMIT DRAWINGS PEDESTRIAN GATE STABILIZE EXISTING PERIMETER ACCESS ROAD WITH GRAVEL AS NECESSARY VEHICLE GATE 2 12/8/2025 CLIENT COMMENTS XXXXXXXXXXXX X X X X X X X X X X D D D D 35 34 37 35 34 33 32 31 3 0 2 9 2 8 2 7 30 35 3534 34 34 34 35 3536373840394138373637 3 8 40 41 37 38 39 37 D36 35 3 4 N C-104 REV3 GRADING & DRAINAGE PLAN 00 40'80' SCALE: 1" = 40' 1" = 40' CB-1 RIM = 36.00 8" INV IN = 33.00 12" INV OUT = 33.00 DESIGNED/CHECKED BY: DRAWN BY: FILE: DATE: APPROVED BY: South Yarmouth LNG CH-IV Houston, TX PROJECT NO: MARK DATE DESCRIPTION C5200-001-30% Plan Set.dwg 11/14/2023 C5200-001 SCALE:Plotted On:Dec 10, 2025-2:49pm By: APaoliLast Saved: 12/10/2025Tighe & Bond:J:\C\C5200 CH-IV\South Yarmouth LNG - 001\Drawings\AutoCAD\Sheet\C5200-001-30% Plan Set.dwgPERMIT DRAWINGS - NOT FOR CONSTRUCTION AEP TJG BSH South Yarmouth, MA DMH-2 RIM = 35.00 18" INV IN = 29.90 18" INV OUT = 29.87 CB-2 RIM = 33.50 24" INV OUT = 30.50 DMH-3 RIM = 34.00 18" INV IN (DMH)= 29.40 24" INV IN (CB-2)= 30.21 24" INV OUT = 29.31 SWTU RIM = 36.00 24" INV IN = 28.54 24" INV OUT = 28.54 STONE OUTLET PROTECTION INV OUT = 28.16 24" ADS, S=0.5% 18" ADS, S=0.5% 12" ADS, S=0.5% 24" ADS, S=0.5% SEDIMENT FOREBAYS 1 & 2 INFILTRATION BASIN 1 BOTTOM = 27.00 300 L.F. Z874-1802P TRENCH DRAIN RIM=37.00 18" BOTTOM OUTLET = 33.00 18" ADS, S=2.3% STONE OUTLET PROTECTION INV OUT = 30.00 37.50 1% 100 L.F. Z874-1201P TRENCH DRAIN RIM=37.00 12" BOTTOM OUTLET = 34.70 12" ADS, S=2% DMH-1 RIM = 36.00 12" INV IN (CB 1) = 32.75 12" INV IN (TRENCH) = 33.50 18" INV OUT = 30.34 37.50 37.50 1.2% 1.2%1.2%2%2%1%1% 1% 24" ADS WITH BFP S = 0.5% 18" ADS, S=0.5% 38.00 37.00 37.00 WEIR @ 34.50 WEIR @ 34.75 42.00 36.00 (EXIST) IFD 4/4/2024 ISSUED FOR DISTRIBUTION 23510-CIV-DWG-0000-0025 1 4/1/2025 ISSUED FOR RFP 2 11/7/2025 PERMIT DRAWINGS EMERGENCY SPILLWAY WEIR @ 34.50 3 12/8/2025 PROPOSED FULL CONTAINMENT LNG STORAGE TANK 1% 8" ADS, S=0.5% 8" ADS, S=0.5% DMH-4 RIM = 36.20 8" INV IN = 33.18 8" INV OUT = 33.18 130' LF Z874-1201P TRENCH DRAIN GRATE = 35.00 8" END OUTLET = 34.10 CLIENT COMMENTS2%2%2% C-201 REV2 SITE DETAILS - 1 AS SHOWN DESIGNED/CHECKED BY: DRAWN BY: FILE: DATE: APPROVED BY: South Yarmouth LNG CH-IV Houston, TX PROJECT NO: MARK DATE DESCRIPTION C5200-001-30% Plan Set.dwg 11/14/2023 C5200-001 SCALE:Plotted On:Dec 10, 2025-2:49pm By: APaoliLast Saved: 12/10/2025Tighe & Bond:J:\C\C5200 CH-IV\South Yarmouth LNG - 001\Drawings\AutoCAD\Sheet\C5200-001-30% Plan Set.dwgPERMIT DRAWINGS - NOT FOR CONSTRUCTION AEP TJG BSH South Yarmouth, MA NOTE: SILTSACKS FOR TRENCH GRATE WILL MATCH OPENING LENGTH AS REQUIRED. SILTSACK OR APPROVED EQUAL SILTSACK EROSION CONTROLR 1" REBAR FOR BAG REMOVAL FROM INLET DUMP STRAP (TYP OF 2) SILTSACK MANUFACTURED BY: ATLANTIC CONSTRUCTION FABRICS, INC. 1801-A WILLIS ROAD RICHMOND, VIRGINIA 23237 PLAN SECTION12"3"WORK ZONE FLOW AREA TO BE PROTECTED WOOD STAKES*-TYP. WORK ZONE 2"x2"x2'-0" WOOD STAKES FOR WATTLES* STRAW WATTLES OR MULCH LOGS SILT FENCE *-STAKES TO BE SPACED AT 4-5' O.C. STAGGER STAKES BETWEEN STRAW WATTLES AND SILT FENCE9"AREA TO BE PROTECTED 4'-6"18"EROSION CONTROL BARRIER NO SCALE 15" STANDARD MANHOLE RUNG 14" A SECTION A-A 3" 8" A 1" 70"/82"Ø MONOLITHIC BASE SEAL ALL JOINTS WITH APPROVED PRE-FORMED GASKET MATERIAL (SEE SPECIFICATIONS) FLAT SLAB TOP FOR SHALLOW MANHOLES 48"/60"Ø 6" 5w" SPIGOT & BELL REINFORCEMENT SHALL BE CONNECTED TO BARREL REINFORCEMENT 24"x48" ECCENTRIC PRECAST MANHOLE CONE 24"Ø STANDARD MANHOLE RUNG (SEE DETAIL BELOW) ADJUST TO GRADE WITH NOT MORE THAN 12" OF RED CLAY BRICK MASONRY OR CONCRETE GRADING RINGS FRAME & COVER TOP STEP TO BE 20" MAX. BELOW TOP OF FRAME 5"12"4"FRAME TO BE SET IN FULL BED OF MORTAR 1/4 PIPE DIAMETERSHAPE INVERT WITH CONCRETE FILL (3000 PSI) SS CLAMP GROUT SECTION B-B RUBBER BOOT PIPE LENGTH 48"/60" PRECAST DRAIN MANHOLE (DMH) NO SCALE B B COPOLYMER POLYPROPYLENE PLASTIC 1/2" GRADE 60 STEEL REINFORCEMENT 6" PIPE DIA. + 24" MIN. MULTIPLES 12", 24",36" OR 48" AS REQUIRED 18"-24" TAPERED SECTION PRECAST BASE6"MONOLITHIC BASE SEAL ALL JOINTS WITH APPROVED PRE-FORMED GASKET MATERIAL (SEE SPECIFICATIONS)MULTIPLES 12",24",36" OR 48"AS REQUIRED24"48" SPIGOT & BELL REINFORCEMENT SHALL BE CONNECTED TO BARREL REINFORCEMENT 24"x48" CONCENTRIC PRECAST CATCH BASIN CONE ADJUST TO GRADE WITH NOT MORE THAN 12" OF BRICK MASONRY FRAME & GRATE 5" FRAME TO BE SET IN FULL BED OF MORTAR 8" MIN 24" SQUARE OPENING O.D. OF PIPE +2" CLEARANCE FINISHED GRADE CAST IRON CATCH BASIN HOOD PRECAST CONCRETE DEEP SUMP HOODED CATCH BASIN (CB) NOTES: 1.FOR USE WITH PVC PIPE, PROVIDE RUBBER BOOT SIMILAR TO MANHOLE DETAIL. 2.FOR USE WITH OTHER TYPES OF PIPE, SEAL JOINT BETWEEN PIPE AND CATCH BASIN WITH GROUT.4'-0"IFD 4/4/2024 ISSUED FOR DISTRIBUTION 23510-CIV-DWG-0000-0026 0 4/1/2025 ISSUED FOR RFP6"2' MIN.TRENCH WIDTH (SEE NOTE 3)"D"6"TYPICAL DRAIN TRENCH SECTION UTILITY WARNING TAPE MARKED "DRAIN" PREVIOUSLY EXCAVATED MATERIAL 8" MAX. STONE DIAMETER COMPACT GRAVEL BORROW STORM DRAIN PIPE CONTRACTOR TO PROVIDE TRENCH BOX, SHEETING OR OTHER MEANS ACCORDING TO OSHA STANDARDS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY REQUIREMENTS ACCORDING TO OSHA. NOTES: 1.COMPACT ALL BACKFILL MATERIAL WITH VIBRATORY PLATE EQUIPMENT (MINIMUM TWO PASSES) TO A MINIMUM DENSITY OF 95 PERCENT OF THE STANDARD PROCTOR DENSITY AS DETERMINED BY ASTM D698. 2.PLACE BACKFILL MATERIAL IN MAXIMUM ONE FOOT LIFTS. 3.FOR PIPES LESS THAN 24" IN DIAMETER, THE TRENCH WIDTH SHALL BE 5.0'. FOR PIPES 24" IN DIAMETER AND GREATER, TRENCH WIDTH SHALL BE THE PIPE DIAMETER + 3.0' 1 11/7/2025 PERMIT DRAWINGS 1 1/2" HMA TOP COURSE 12" PROCESSED GRAVEL BORROW FOR PAVEMENT SUB-BASE 2 1/2" HMA BINDER COURSE HMA DRIVEWAYS AND PARKING AREAS NO SCALE 21 2" HMA BINDER COURSE 11 2" HMA TOP COURSE 12" PROCESSED GRAVEL BORROW FOR PAVEMENT SUB-BASE 12"11 2"5"3 4" WASHED STONE CAPE COD BITUMINOUS BERM NO SCALE 8" COMPACTED GRAVEL BASE 6" OF 3 4" WASHED STONE LANDSCAPING STONE AROUND BUILDINGS NO SCALE NON-WOVEN GEOTEXTILE FABRIC (MIRAFI 140N OR APPROVED EQUAL) PLAN VIEW STORMCEPTOR 450i NO SCALE OIL INSPECTION PIPE (CAP OPTIONAL) OUTLET PIPE OUTLET RISER PERMANENT POOL ELEVATIONWEIRREMOVABLE DROP TEE SOLIDS STORAGE SUMP REMOVABLE DROP TEE HANDLE STORMCEPTOR INSERT TOP SLAB ACCESS (SEE FRAME AND COVER DETAIL) A FLOW 48" [1219] I.D. MANHOLE STRUCTURE A FLO W +/-90°MAXCONTRACTOR TO GROUT TO FINISHED GRADE SECTION VIEW TOP SLAB ACCESS (SEE FRAME AND COVER DETAILS) 48" I.D. MANHOLE STRUCTURE 16' MI N . 30 ' L O N G PUBLIC W A Y 6" MINIMUM DEPTH OF 1 1 2" CRUSHED STONE BORROW GROUP 1 WOVEN GEOTEXTILE CONSTRUCTION ENTRANCE NO SCALE HMA BERM 2 12/8/2025 CLIENT COMMENTS C-202 REV2 SITE DETAILS - 2 AS SHOWN DESIGNED/CHECKED BY: DRAWN BY: FILE: DATE: APPROVED BY: South Yarmouth LNG CH-IV Houston, TX PROJECT NO: MARK DATE DESCRIPTION C5200-001-30% Plan Set.dwg 11/14/2023 C5200-001 SCALE:Plotted On:Dec 10, 2025-2:49pm By: APaoliLast Saved: 12/10/2025Tighe & Bond:J:\C\C5200 CH-IV\South Yarmouth LNG - 001\Drawings\AutoCAD\Sheet\C5200-001-30% Plan Set.dwgPERMIT DRAWINGS - NOT FOR CONSTRUCTION AEP TJG BSH South Yarmouth, MA NOTES: 1.ALL TIMBERS SHALL BE PRESSURE TREATED (0.40 PCF ACQ OR CCA-C) SOUTHERN YELLOW PINE. 2.ALL HARDWARE SHALL BE HOT DIP GALVANIZED. 3.ALL TIMBERS SHALL BE STAINED (COLOR AND TYPE TO BE SELECTED BY THE OWNER). 4.ALL CONNECTION BOLTS, PLATES, AND ASSOCIATED HARDWARE AND SPACING SHALL BE IN ACCORDANCE WITH THE MERRITT PARKWAY GUARDRAIL BY CTDOT. 5.ALL CONNECTION HARDWARE SHALL BE SUFFICIENTLY TIGHTENED TO ACCOMMODATE FOR SHRINKAGE OF THE WOOD ELEMENTS. ELEVATION END VIEW2'-3"UNDISTURBED SUBGRADE COMPACTED BACKFILL FINISHED GRADE 6"x12" TIMBER RAIL 10"x12" TIMBER POST POSTS SPACED 10'-0" O.C. POST CONNECTION WITH BUTT JOINT 7'-0"CARRIAGE BOLTS NUT AND WASHER EDGE OF ROADWAY PAVEMENT 6"83 4" 3" 3" TIMBER GUARD RAIL POST CONNECTION IFD 4/4/2024 ISSUED FOR DISTRIBUTION 23510-CIV-DWG-0000-0027 0 4/1/2025 ISSUED FOR RFP NOTES: 1.INSTALL BASIN AFTER LAWN IS STABILIZED. PREVENT SEDIMENT FROM CLOGGING BASIN. 2.DO NOT STOCKPILE MATERIAL OR EQUIPMENT IN BASIN DURING CONSTRUCTION BOTTOM OF BASIN EL = 27.00 NATIVE SOIL MATERIAL 3 3 1 INFILTRATION BASIN DETAIL NO SCALE DUMPED RIP RAP ALONG SIDES BASIN 1 3 CREST OF SPILLWAY-SEE SHEET C-104 FOR ELEVATIONS 3 TYP 1 BERM EXTEND ROCKFILL EXTENT AS SHOWN ON SHEET C-104 0.6' 6" CONCRETE CURB 3"-6" MODIFIED ROCKFILL (12" MIN DEPTH) MODIFIED ROCKFILL (12" MIN DEPTH) 3,000 PSI PRE-CAST CONCRETE CURB OR JERSEY BARRIER SPILLWAY-SEE SHEET C-104 FOR ELEVATIONS SECTION 30 MIL HDPE FLEXIBLE MEMBRANE LINER 30 MIL HDPE FLEXIBLE MEMBRANE LINER EMERGENCY SPILLWAY NO SCALE SECTION 1 MODIFIED ROCKFILL COVER ALONG BOTTOM OF BASIN 20' 1 11/7/2025 PERMIT DRAWINGS D W1 W2 L d 12" 6' 6' 5' 6" 6' 14' 8' 15" 6'-6" 8' 5' 12" 6'-6" 18' 12' 18" 7' 10' 5' 12" 7' 18' 12' 21" 7'-6" 12' 6'-6" 12" 7'-6" 22' 16' 24" 8' 14' 8'-4" 12" 8' 26' 20' 6"12"12"12"12"W12'2'PLAN L L 1 1 W2SECTION A-A NON-WOVEN GEOTEXTILE. OVERLAP SEAMS 12" MIND W1 W2 L D 12"15"18"21"24" SLOPE "S" DIMENSIONS FOR "S"=<1.0%DIMENSIONS FOR "S"=5.0% SLO P E V A R I E S d ** - THICKNESS SHALL BE 1'-0" OR 1.5xd , WHICHEVER IS GREATER d DENOTES AVERAGE STONE DIAMETERavg A A ANGULAR STONE-SEE TABLE FOR SIZE STONE OUTLET PROTECTION NO SCALE RODENT CAP CONCRETE FLARED END avg avg avg FOREBAY VARIES - SEE SITE PLANS CHECK DAM VARIES - SEE SITE PLANS 3 1 3 1 3 1 LOAM & SEED SIDE SLOPES (TYP) EXTEND CHECK DAM STONE TO COVER BOTTOM OF FOREBAYS SEDIMENT POST MARKED ON 6" INTERVAL FROM BOTTOM. INSTALL IN ALL FOREBAYS (TYP) FINISH GRADE SEE SITE PLANS FOR WEIR ELEVATIONS CHECK DAM/STONE WEIR: 2" DOUBLE-WASHED CRUSHED STONE OVER A NON-WOVEN GEOTEXTILE SEDIMENT FOREBAY - SECTION NO SCALE ZURN Z874 TRENCH DRAIN WITH CONTINUOUSLY SLOPED HDPE CHANNEL,DUCTILE IRON FRAME AND SLOTTED GRATE, 18" OR 12" BOTTOM OUTLET OR 8" END OUTLET FIBER REINFORCED 4500 PSI CAST-IN-PLACE CONCRETE 12"EXPANSION JOINT WHERE DRAIN ABUTS PAVEMENT12" TRENCH DRAIN DETAIL NO SCALE ABUTTING SURFACE COMPACTED PROCESS GRAVEL REINFORCEMENT 1.DETAILING, FABRICATION, AND ERECTION OF REINFORCEMENT, UNLESS OTHERWISE NOTED, SHALL CONFORM TO ACI "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE (ACI 318)" AND ACI "MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES (ACI 315)", LATEST EDITION. 2.STEEL REINFORCEMENT UNLESS OTHERWISE SHOWN SHALL CONFORM TO ASTM A615 GRADE 60 MINIMUM (YIELD STRENGTH - 60,000 PSI). 3.THE CONCRETE PROTECTIVE COVERING FOR REINFORCEMENT SHALL BE 3 INCHES FOR CAST-IN-PLACE CONCRETE CAST AGAINST EARTH, OR EXPOSED TO WATER OR WEATHER AND 1 1/2 INCHES IF CAST-IN-PLACE IS NOT CAST AGAINST EARTH, OR EXPOSED TO WATER OR WEATHER, UNLESS OTHERWISE SHOWN. 4.WHERE REINFORCEMENT IS CALLED FOR IN SECTION, REINFORCEMENT IS CONSIDERED TYPICAL WHEREVER THE SECTION APPLIES. 5.REINFORCEMENT SHALL BE CONTINUOUS THROUGH ALL CONSTRUCTION JOINTS UNLESS OTHERWISE INDICATED ON THE DRAWINGS. 6.REINFORCEMENT SHALL BE SET BEFORE PLACING CONCRETE. SETTING ANY REINFORCEMENT INTO WET CONCRETE IS PROHIBITED. FOUNDATIONS 1.NO CONCRETE SHALL BE PLACED IN WATER OR ON FROZEN GROUND. 2.BOTTOM OF FOUNDATION ELEVATIONS GIVEN ON DRAWINGS ARE TO BE CONSIDERED MINIMUM DEPTHS. CONTRACTOR SHALL HAVE FURTHER EXCAVATION AS REQUIRED TO REACH FIRM BEARING SURFACE AS DETERMINED BY ENGINEER. 3.REMOVE UNSUITABLE MATERIAL AND REPLACE WITH MATERIAL AS DIRECTED BY ENGINEER. 4.FROZEN MATERIAL MAY NOT BE USED AS BACKFILL. CONCRETE 1.CONCRETE WORK SHALL CONFORM TO THE LATEST EDITIONS OF THE BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE (ACI 318), AND SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDING (ACI 301. 2.CONCRETE SHALL BE NORMAL WEIGHT CONCRETE AND SHALL HAVE A COMPRESSIVE STRENGTH OF 4,500 PSI AT 28 DAYS, SHALL BE AIR ENTRAINED BETWEEN 4.5 AND 7.5 PERCENT, SHALL HAVE MAXIMUM WATER/CEMENT RATIO OF 0.45, AND SHALL HAVE A TOTAL CEMENTITIOUS MATERIAL IN THE MIX BETWEEN 635 LBS (MIN) AND 658 LBS (MAX) PER CUBIC YARD. 3.CONCRETE MATERIALS: 3.1.PORTLAND CEMENT: TYPE II, MEETING REQUIREMENTS OF ASTM C150 3.2.FLY ASH: CLASS F CONFORMING TO ASTM C989 3.3.GROUND GRANULATED BLAST SLAG: CONFORMING TO ASTM C989 3.4.FINE AGGREGATE: NATURAL SAND CONFORMING TO ASTM C33 WITH A FINENESS MODULUS = 2.75 (PLUS/MINUS 0.25) 3.5.COARSE AGGREGATE: 3/4" PROCESSED STONE CONFORMING TO ASTM C33 3.6.WATER: SHALL BE CLEAN, POTABLE 3.7.MID-RANGE WATER REDUCING AGENT: CONFORMING TO ASTM C494 TYPE A 3.8.HIGH-RANGE WATER REDUCING AGENT: CONFORMING TO ASTM C494 TYPE F 3.9.AIR-ENTRAINING AGENT: CONFORMING TO ASTM C260 4.CONCRETE SLAB SHALL BE CAST SO THAT THE SLAB THICKNESS IS AT NO POINT LESS THAN THAT INDICATED ON THE DRAWINGS. 5.CONCRETE SHALL BE PLACED WITHOUT HORIZONTAL CONSTRUCTION JOINTS EXCEPT WHERE SHOWN OR NOTED. 6.ALL CONCRETE SHALL BE CURED IMMEDIATELY AFTER FINISHING IN ACCORDANCE WITH THE FOLLOWING REQUIREMENTS: CURING SHALL BE ACCOMPLISHED BY A CONTINUOUS SOAKING PROCESS SUCH AS THE USE OF SOAKER HOSE OR SPRINKLERS, OR BY USE OF PLASTIC ROLL MATERIALS TO COVER THE CONCRETE, WHICH SHALL BE THOROUGHLY WETTED AT LEAST ONCE A DAY OR MORE OFTEN AS REQUIRED IN VERY HOT WEATHER. SUCH PLASTIC SHALL BE PLACED AS SOON AS POSSIBLE AFTER FINISHING OF CONCRETE AS IS PROPER SO THAT SCARRING OF THE SURFACE WILL NOT OCCUR. PLASTIC SHALL BE HELD IN PLACE ON THE SURFACE OF THE CONCRETE IN SUCH A MANNER AND MEANS AS WILL NOT ALLOW IT TO BE BLOWN OFF OR OTHERWISE DISLODGED FROM THE CONCRETE SURFACE. CURING PROCEDURES SHALL BE MAINTAINED CONTINUOUSLY FOR A PERIOD OF AT LEAST 7 DAYS. 7.CONCRETE SHALL NOT BE ALLOWED TO FLOW HORIZONTALLY OVER DISTANCES EXCEEDING 10 FEET OR DROPPED VERTICALLY OVER 6 FEET. 8.THOROUGHLY CONSOLIDATE EACH LAYER OF CONCRETE BY RODDING AND VIBRATING USING INTERNAL TYPE MECHANICAL VIBRATOR. 9.IMMEDIATELY AFTER THE END OF THE WET CURE PERIOD, REMOVE FROM TIES AND PATCH ALL TIE-HOLES, RAT HOLES AND OTHER SURFACE VOIDS WITH A NON-METALLIC, NON-SHRINK GROUT, WHICH MOST NEARLY MATCHES THE COLOR AND TEXTURE OF THE CONCRETE SURFACE. ALL PROTRUSIONS SHALL BE GROUND SMOOTH WITH AN APPROVED MECHANICAL GRINDER. 10.COLD WEATHER CONDITIONS SHALL BE IMPLEMENTED IN ACCORDANCE WITH ACI 306.1-90 WHEN FOR MORE THAN THREE SUCCESSIVE DAYS THE AVERAGE DAILY OUTDOOR TEMPERATURE DROPS BELOW 40°F. 11.DURING COLD WEATHER CONCRETE PROCEDURES, THE CONCRETE TEMPERATURE AT THE TIME OF PLACEMENT SHALL BE SPECIFIED: 11.1.A. TABLE - CONCRETE TEMPERATURE DURING COLD WEATHER CONDITIONS LEAST DIMENSIONS OF MINIMUM TEMPERATURE OF CONCRETE MAXIMUM GRADUAL DECREASE IN SECTION (INCHES)AS PLACED AND MAINTAINED DURING SURFACE TEMPERATURE DURING HOURS PROTECTION PERIOD, °F AFTER END OF PROTECTION, °F LESS THAN 12 55 50 12 TO LESS THAN 36 50 40 12" (MIN.) TYP #5 U-BAR, 12" O.C. #5 REBAR T&B, 15" O.C. 12" (MIN.) #5 REBAR #5 REBAR3'-6" #5 HORIZONTAL W/STANDARD HOOK AT EACH END, 12" O.C.VARIES24" (MIN.)ABUTTING SURFACE 2 12/8/2025 CLIENT COMMENTS