HomeMy WebLinkAboutSite & Septic Plan 12.29.2025GENERAL NOTES: A.) NEITHER DRIVEWAYS NOR PARKING AREAS ARE ALLOWED OVER SEPTIC SYSTEM UNLESS H-20 COMPONENTS ARE USED. B.) THE DESIGNER WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UNLESS CONSTRUCTED AS SHOWN. ANY CHANGES SHALL BE APPROVED IN WRITING. C.) CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UNDERGROUNDAND OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK. CONSTRUCTION NOTES: 1.) ALL CONSTRUCTION SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE, TITLE 5,AND THE REQUIREMENTS OF THE LOCAL BOARD OF HEALTH. 2.) SEPTICTANK(S), GREASE TRAP(S), DOSING CHAMBER(S) AND DISTRIBUTION BOX(ES) SHALL BE SET ON A LEVEL STABLE BASE WHICH HAS BEEN MECHANICALLY COMPACTED, OR ON A 6 INCH CRUSHED STONE BASE. 3.) SEPTICTANK(S) SHALL MEET ASTM STANDARD C1127-93 AND SHALL HAVE AT LEASTTHREE 20" DIAMETER MANHOLES. THE MINIMUM DEPTH FROM THE BOT- TOM OF THE SEPTIC TANK TO THE FLOW LINE SHALL BE 48". 4.) SCHEDULE 40 PVC INLET AND OUTLET TEES SHALL EXTEND A MINIMUM OF 6" ABOVE THE FLOW LINE OF THE SEPTIC TANK AND SHALL BE INSTALLED ON THE CENTERLINE OF THE TANK DIRECTLY UNDER THE CLEANOUT MANHOLE. 5.) RAISE COVERS OF THE SEPTIC TANK AND DISTRIBUTION BOX WITH PRECAST CONCRETE WATER TIGHT RISERS OVER INLET AND OUTLET TEES TO WITHIN 6" OF FINISH GRADE, OR AS APPROVED BY THE LOCAL BOARD OF HEALTH AGENT. 6.) PIPING SHALL CONSIST OF 4" SCHEDULE 40 PVC OR EQUIVALENT. PIPE SHALL BE LAID ON A MINIMUM CONTINUOUS GRADE OF NOT LESS THAN 1%. 7.) DISTRIBUTION LINES FOR SOIL ABSORPTION SYSTEM (AS REQUIRED) SHALL BE 4" DIAMETER SCHEDULE 40 PVC LAID AT 0.005 FT/FT. LINE SHALL BE CAPPED AT END OR AS NOTED. 8.) OUTLET PIPES FROM DISTRIBUTION BOX SHALL REMAIN LEVEL FOR AT LEAST 2' BEFORE PITCHING TO SOIL ABSORPTION SYSTEM. WATER TEST DISTRIBUTION BOXTO ENSURE EVEN DISTRIBUTION. 9.) DISTRIBUTION BOX SHALL HAVE A MINIMUM SUMP OF 6" MEASURED BELOW THE OUTLET INVERT. 10.) BASE AGGREGATE FOR THE LEACHING FACILITY SHALL CONSIST OF 3/4" TO 1-1/2" DOUBLE WASHED NATIVE STONE FREE OF IRON, FINES AND DUST AND SHALL BE INSTALLED BELOW THE CROWN OF THE DISTRIBUTION LINE TO THE BOTTOM OF THE SOIL ABSORPTION SYSTEM. BASE AGGREGATE SHALL BE COVERED WITH A LAYER OF FILTER FABRIC OR APPROVED EQUIVALENT. 11.) VENT SOILABSORPTION SYSTEM WHEN DISTRIBUTION LINES EXCEED 50 FEET; WHEN LOCATED EITHER IN WHOLE OR IN PART UNDER DRIVEWAYS, PARKING AREAS, TURNING AREAS OR OTHER IMPERVIOUS MATERIAL; OR WHEN PRESSURE DOSED. 12.) SOILABSORPTION SYSTEM SHALL BE COVERED WITH A MINIMUM OF 9" OF CLEAN MEDIUM SAND (EXCLUDING TOPSOIL). 13.) FINISH GRADE SHALL BE A MAXIMUM OF 36" OVER THE TOP OF ALL SYSTEM COMPONENTS, INCLUDING THE SEPTIC TANK, DISTRIBUTION BOX, DOSING CHAMBER AND SOIL ABSORPTION SYSTEM. SEPTIC TANKS SHALL HAVE A MINIMUM COVER OF 9". 14.) FROM THE DATE OF INSTALLATION OF THE SOIL ABSORPTION SYSTEM UNTIL RECEIPT OF A CERTIFICATE OF COMPLIANCE, THE PERIMETER OF THE SOIL ABSORPTION SYSTEM SHALL BE STAKED AND FLAGGED TO PREVENT THE USE OF SUCH AREA FOR ALLACTIVITIES THAT MIGHT DAMAGE THE SYSTEM. 15.) SUBSURFACE COMPONENTS OF A SYSTEM SHALL NOT BE BACKFILLED OR OTHERWISE CONCEALED FROM VIEW UNTIL A FINAL INSPECTION HAS BEEN CONDUCTED BYTHE APPROVING AUTHORITY AND PERMISSION HAS BEEN GRANTED BYTHE APPROVING AUTHORITY TO BACKFILL THE SYSTEM. THE DESIGNER SHALL INSPECTTHE CONSTRUCTION AFTER THE INITIAL EXCAVATION, PRIOR TO BACKFILLING, AND DURING BACKFILLING. IN ADDITION, THE FINAL INSPECTION OF THE SYSTEM SHALL BE CONDUCTED BY THE APPROVING AUTHORITY, THE SYSTEM INSTALLER AND DESIGNER PRIOR TO THE ISSUANCE OF A CERTIFICATE OF COMPLIANCE PURSUANT TO 310 CMR 15.021(3). ANY COMPONENT OF THE SYSTEM WHICH HAS BEEN COVERED WITHOUTSUCH PERMISSION SHALL BE UNCOVERED UPON REQUEST OF THE APPROVING AUTHORITY OR THE DEPARTMENT. 16.) INSTALLER SHALL VERIFY INVERT ELEVATIONS PRIOR TO SETTING ANY OF THE PROPOSED SEPTIC SYSTEM COMPONENTS. DUE TO THE CRAWL SPACE WITHIN THE BUILDING, THE DESIGN ENGINEER RECOMMENDS A WATER TEST OF THE WASTE PIPE TO CONFIRM ALL WASTE IS CONNECTED TO THE NEW SEWAGE SYSTEM. DESIGN ENGINEER SHALL BE NOTIFIED OF ANY ADDITIONAL PLUMBING LINES. 17.) EXISTING CESSPOOL TO BE PUMPED DRY, FILLED WITH CLEAN SAND, AND ABANDONED IN PLACE. 18.)THE EXISTING WATER LINE SHALL BE REPLACED WITH A NEW WATER SERVICE. NEW WATER SERVICE SHALL BE INSTALLED IN ACCORDANCE WITH THE TOWN OF YARMOUTH WATER DEPARTMENT REGULATIONS. 19.) INSTALLER TO CONFIRM LOCATION OF ALL UNDERGROUND AND OVERHEAD UTILITIES PRIOR TO START OF CONSTRUCTION. 20.)THE 4" PVC CLEANOUT SHALL BE WITHIN 3" OF FINISH GRADE. CLEANOUT SHALL BE MARKED WITH A PIECE OF #5 REBAR FOR FUTURE LOCATION. CONSERVATION NOTES: 1.) LIMIT OF WORK SHALL BE AS SHOWN. A ROW OF STAKED WATTLES SHALL BE CONSTRUCTED ALONG THE LIMIT OF WORK LINE PRIOR TO THE COMMENCEMENT OF OF ANY WORK. 2.) ALL DISTURBED AREAS RAKED SMOOTH, LOAMED AND SEEDED WITH A DROUGHT TOLERANT GRASS SEED MIXTURE. SEED MIXTURE SHALL BE APPROVED BY THE COMMISISON'S AGENT. FLOW PROFILE: NOT TO SCALE TOP OF FOUNDATION EL=19.0± `:•'.'•: CLEAN -OUT EXISTING 48' -� 21" DIAMETER CONCRETE COVERS RAISED TO WITHIN 6" OF FINISH GRADE (OR AS NOTED) (SEE NOTE #5) f Proposed EL=19.Oi 10" 14" 3„ T T 4'0" GAS BAFFLE - 1500 GALLON SEPTIC TANK SOIL TEST LOGS: TEST HOLE 1: EL=20.3± DEPTH FROM SURFACE (INCHES) SOIL HORIZON SOIL TEXTURE (USDA) SOIL COLOR (MUNSELL) SOIL MOTTLING OTHER 0-13 E LOAMY FINE SAND 10YR 5 2 NONE 13-37 B LOAMY FINE SAND 10YR 6 6 NONE 37-132 C1 FINE SAND 10YR 7 6 NONE LOOSE TFST HOI F 7: EL=21.0± DEPTH FROM SURFACE (INCHES) SOIL HORIZON SOIL TEXTURE (USDA) SOIL COLOR (MUNSELL) SOIL MOTTLING OTHER 0-12 E LOAMY FINE SAND 10YR 5 2 NONE 12-32 B LOAMY FINE SAND 10YR 6 6 NONE 32-140 C1 FINE SAND 10YR 7 6 NONE LOOSE- PERC AT 50" < 2 MIN INCH RATE DATE OF TESTING: 12-16-2025 PERCOLATION RATE: LESS THAN 2 MIN/INCH IN C1 LAYER. WITNESSED BY: M. FARRELL, EIT, J.M. O'REILLY & ASSOCIATES, INC. B. LEWIS, AGENT, YARMOUTH HEALTH DEPARTMENT NO WATER ENCOUNTERED USE A LOADING RATE OF 0.74 GPD/SF FOR SIZING OF SOIL ABSORPTION SYSTEM. INDEX WELL INFORMATION: PARCEL IS WITHIN ZONE A FOR MONITOR WELL M.I.W.- 29 ESTIMATED RISE FOR DECEMBER IS 2.2 FEET USING THE POND FOR GROUNDWATER ELEVATION (7.3±) THE ESTIMATED SEASONAL HIGH GROUNDWATER IS EL=9.5 PROPOSED ACCESS COVERS A TOTAL OF FIVE (5) COVERS ARE TO BE BUILTTO WITHIN 6-INCHES OF FINSH GRADE, 2 ON SEPTIC TANK, 1 ON D-BOX AND 1 ON SAS. ONE(1) 21" DIA BUILDUP AND COVER TO WITHIN 6" OF FINISH GRADE SYSTEM DESIGN CALCULATIONS: SEWAGE DESIGN FLOWi 3 BEDROOM DWELLING @ 110 GPD = 330 GPD LEACHING CAPACITY REQUIREM 3 BEDROOMS (MAX.) @ 110 GPD = 330 GPD REQUIRED SEPTIC TANK CAPACITY REQUIREM DAILY FLOW = 330 GPD @ 200% = 660 GAL. REQUIRED SEPTIC TANK CAPACITY PROVIDEM 1500 GALLON SEPTIC TANK (MIN. ALLOWED) LEACHING CAPACITY PROVIDEDi ONE (1) 33.0' X 11.00' X 1.0' LEACHING CHAMBER CAN LEACH: Vt=[(33.0 X 11.00) + (33.0 X 1.0)2 + (11.00 X 1.0)2] X 0.74 GPD/SF = 333 GPD Vt=333 GPD> 330 GPD REQUIRED INSTALLi ONE 1 -1500 GALLON SEPTIC TANK (USE SHOREY PRECAST ST15MH OR APPROVED EQUAL) ONE (1)- 6 OUTLET DISTRIBUTION BOX (H-20 RATED) FOUR (4)- 125 GALLON LEACH CHAMBERS WITH 4' OF STONE ALL AROUND- SEE DETAIL NOTE: A GARBAGE DISPOSAL IS NOT PERMITTED WITH THIS DESIGN. DB (H-20 RATED) `r STONE r, m 125 GAL -' CHAMBER SAS 4' 6.08' 6.08' 1' 6.08' 6.08' 4' 33.33' SAS DETAIL INSPECTION NOTE: PRIORTO FINAL INSPECTION BY THE ENGINEER, SYSTEM NEEDS TO BE COMPLETE INCLUDING BUILDUP FOR COVERS. SCALE: 1" = 10' Proposed EL=19.5± Proposed EL=19.8± 36" Proposed 18.1± S 16.8± (9" Min- 36" Max) " FILTER FABRIC 16.75 16.00 j 3/4"- 1-1/2" NATIVE STONE 16.50__7 16.33 2" DROP SAS ELEVATIONS ARE CRITICAL, DESIGN 15.00 ENGINEER SHALL BE NOTIFIED IF ELEVATIONS ADJUSTMENTS ARE NEEDED USE FOUR (4) SHOREY PRECAST DURING INSTALLATION. 125 GALLON LEACH CHAMBERS 5.5'± Longest Run WITH 4' OF NATIVE STONE AROUND �- 16' 21' (END VIEW) DB-6 LEACHING CHAMBER �- EL=9.5±SEASONAL HIGH GROUNDWATER D-BOX 32.32'x 11.0'x 1.0' 2� H-20 �- SZ - EL=7.3± WATER LEVEL WITHIN POND (11-26-25) / 22.8 / Q �Q PROPOSED GAS SERVICE-� y ` \ ' x19.� c �Nz qj \ G\ 22.8 0- LOT 3A Total Area=39,652 SF± Upland = 39,444 SF± X O Per Record Plan x 22.4 g / 1� 11,2 7.2 WG 19 7 . Paved Driveway 18.9 / Existing Water Service Line J TO BE REPLACED WITH A NEW 22.5 22,s SERVICE c : / / , 1�.3 / r is.s I s 2- 16" OAKS '� \ iix c\ Skl 9 G a x 11.7e w\ w\ f c 18,E. ; /ab E -9. o e v` s•1 � �CO 1-y 9.1 �. BENCHMARK #11 Garage Concrete Slab at Door h - EL=19.0± (NAVD88 Datum) -1\ x lr 6 ' 7 ^yy - 20,0 EXlsfing gedroom - ry x 21.4 w TP I � K \ kk �Jc 3 D>NO\0 DN 22,oN w � °�"' 'Rhoda \ = 18.3 E` 1 i� w I TP1 OL rll x 22.3 I I --\�® a- 11 V) \ S �' a N _ 20, �A x/is•1 46.4'+ Exisng�p+tl�ne� H DB PRUPD 7 H E2p 2 / ao SEE No ) ro 0 Ms: J Its �_ coPROPOSED LIMIT OF WORK LINE 20 - F`n 112.91± 1$ TO BE A ROW OF STAKED WATTLES. x 1 WATTLES SHALL BE INSTALLED PRIOR TO ANY x�x� r�\� O - WORK BEING STARTED FOR THE PROPOSED x �`S�X i .2 1-'.1 20.9 \ SEWAGE SYSTEM OR PROPOSED UTILITIES. e x - Existing Cesspool �+ r I TO REMAIN AND BE CONNECTED TO THE ROOF FOR xisting Stump X 21,e STORMWATER RUNOFF. CONNECTIONS SHALL BE MADE BY GUTTERS AND ' DOWNSPOUTS. PIPING TO BE 6-INCH 0 IA. ADS PIPING 2- 14" OAKS ��+I x' 14.4 ' 20.2 N X Existing Cesspool, / G SEE NOTE 17 I `'o +i Cq .11 °H I ON 7.7 x 21.6 Ln Utility Pole °" OH Off 246-24 �H °H 19.4 0-1 �pH °H " BENCHMARK #21 zo - OH off OH 245.00' X Utility 21.3 OH Top of Concrete Bound Y Pole OH OH OH x 1s.3 � - r�I EL=20.7± (NAVD88 Datum) 6-P _ x 22.6 gg - x 16. 11V --tility Po9e log�,j 1J do 246-R24 - ti� y� / 'T2's -lull ti� 8.9 � v � v 0 O p N Ln 0 20 40 60 SCALE 1"=20' w F- N Ln N 6 O O U Ln Q G:\AAJOBS:\WHARTON 9863\DWG\9863 SITE & SIDS PLAN.dwg