Loading...
HomeMy WebLinkAboutYarmouth VCOD SPR Checklist - 645 Main StVCCD Site Plan Review Application Checklist ❑ Application Form ❑ Fee ❑ One(1) original and twenty-two (22) hard copies of the required information outlined below. A Professional Land Surveyor or Professional Civil Engineer or licensed architect shall sign and date and place their seal upon all pertinent documents and plans as appropriate to their discipline. All drawings shall be prepared on standard 24" x 36" plan sheets. Site Plans shall be at a minimum scale of 1" = 40' unless otherwise specified. Elevation drawings, where required, shall be drawn at a minimum scale of 1" = 4'. Drawings may be submitted in 11x17 format if plotted at a standard scale and are fully legible. All drawings must be to scale. If 11 x1 7 drawings are submitted, one full size set of all plans shall also be submitted. ❑ Digital Format of all Submittal Information: In addition to hard copies provided, all applications, supporting data, plans and specifications must be submitted in Adobe pdf digital format on CD or DVD. All site plans and architectural plans shall be included in one pdf file. Site Plans shall also be provided in AutoCad.dwg format. If requested, plans shall also be provided in the following acceptable digital formats: ESRI standard .shp or geodatabase file formats. All feature types that are shown on the recorded plans must be organized in separate layers to allow for easy viewing in digital format (e.g., right of way, buildings, lot lines, utilities, etc.). All drawing shall be geo-referenced in Mass State Plane coordinates to allow for easy integration into GIS. The following information shall be included the submittal package: Basic Information for allplans) Name of the proposed development. 2. Name and address of property owner and applicant. 3. Name, address and telephone number of person or firm preparing application plan and/or materials. 4.� Date of plan/materials preparation, with revision date(s) (if any). 5. Graphic scale and true north arrow on any graphic representations. 6. Assessors Map and lot number(s) of the parcel. Operational Regulations of the Yarmouth Planning Board Last Revised December 12, 2012 -15- Site Information Regional Locus - A locus plan locating the site on the most recent USGS quadrangle map that includes a half -mile radius around the site and zoning district boundaries. 2. Aerial Locus — The latest available aerial photograph produced at the same scale as the Regional Locus, including labeled street names. 3. Existing Conditions Plan — The location or identification of the following features: a. Surveyed property boundary; b. Wetlands, streams, water bodies, and their regulatory buffers; other regulatory setbacks/buffers; and 100-year flood plain boundary with elevation; C. w Zoning setbacks ; d. Unique natural land features, including all stonewalls, trees over eight (8) inches in diameter measured at breast height, rock outcrops, and the general location of the tree line; e. vl,, Adjacent streets with dimensions; f. Existing driveways or other means of access to and prom the site with dimensions; g. Existing on -site structures and structures on abutting properties if within 20' of the property line; h. Adjacent properties including lots on the opposite sides of adjacent streets with owners' names; i. Any deeds of easement, rights -of -way, covenants and any other agreements connected with the site with dimensions; j. Existing utilities; k. Existing stormwater management facilities; 1. Existing wastewater management facilities with design flow noted; rn.—Z— Topography in two -foot intervals with spot elevations. 4. V General Proposed Development Plans (information can be contained on multiple plans) a. Surveyed property boundary; b. Wetlands, streams, water bodies, and their regulatory buffers; other regulatory setbacks/buffers; and 100-year flood plain boundary with elevation; c.. Retained and proposed structures with height, footprint, total gross floor area, number of stories noted; d. If a structure is located in a setback, the measured setbacks for each structure to the nearest lot line and/or structure with Operational Regulations of the Yarmouth Planning Board Last Revised December 12, 2012 16- annotation for required zoning setback; e. Proposed deeds of easement, rights -of -way, covenants and any other agreements connected with the site with dimensions; f. Stormwater management system locations with description noted (e.g., "swale", "bioretention facility", "recharge chamber", etc.) g. Wastewater treatment facilities locations with description of the system and design flow noted; h. Water supply infrastructure location and description; i. Proposed telephonefelectricicable with transformer locations. i._ Delineation of landscaped areas; k. Parking and loading areas with stall dimensions, striping, islands, walkways, and number of spaces; I. Proposed vehicular and pedestrian connections to adjacent parcels, or identification of locations where future connections could be made. M. Circulation features such as site access, bicycle lanes/striping, general flow of automobile traffic, stacking capacity for any drive - through lanes, bicycle racks, speed bumps, crosswalks, and sidewalks. For crosswalks and sidewalks, materials, color, finish, and dimensions shall be noted; n. Location of waste disposal collection bins and associated screening; o. Parking requirement calculations and description of any shared parking or off -site parking strategies with associated calculations. p. Proposed topography in two -foot contours with spot elevations as required. All proposed first floor elevations of all buildings. q. Summary of zoning dimensional requirements, existing and proposed, with appropriate footnotes. r. Erosion Prevention and Sediment Control plans. 5. Lighting and Signage Plan a. The location, dimensions, height of all signs and lighting; b. Sketches or other stock images shall be provided to show typical applications to be used for free-standing and wall mounted lights to demonstrate compliance with the VCOD standards (separate sign permits required); C. Lighting plan showing the location of all fixtures with lumen output and foot candle intensity at property boundaries; d. Identification of any existing signs that will be improved or replaced in order to achieve compliance with VCOD standards. Operational Regulations of the Yarmouth Planning Board Last Revised December 12, 2012 17- 6. Landscaping/Planting Plan a. List of proposed plants in their common name and Latin name with variety, and proposed sizes; b. Location of each plant listed in 6a above; c. Parking Lot canopy calculations. d. Location, dimension, height, style, color, and materials for any decorative walls or fences proposed. e. Location, width, materials and colors of all pedestrian pathways. f. Location of any protective measures during construction including tree barriers. 7. Building Information -- The applicant shall provide the following building and architectural information: a. Architectural elevations demonstrating compliance with the VCOD standards for materials, rooflines, fenestration, signage and entrances as applicable. b. Architectural first floor plans for all proposed buildings or building expansions. C. Identify all building materials on the plans or in a separate narrative. Provide information and material samples where applicable, or requested, on the following: 1. Siding: materials, color and exposure; 2. Roof., material, color and exposure; 3. Windows: manufacturer, style, exterior material and color, grill configuration; 4. Doors: material, style and color(s); 5. Trims: Materials, dimensions and color(s) for trim associated with Windows, Doors, Corner Boards, Soffit, Fascia, Frieze, Rake Boards; 6. Decks: size, materials, colors; 7. Stair and Deck Railings: materials, dimensions and colors of top and bottom rails, balusters and posts; 8. Supplementary Information — The applicant shall provide a narrative report with the following information. a. Narrative summary of basic information. b. Narrative summary of existing conditions. C. Narrative summary and any additional documentation of strategy to provide water supply. d. Narrative summary and any additional documentation of strategy to treat and dispose of wastewater including a description of on -site soils, depth to groundwater throughout the site, and any test pit investigations that may have been performed. Operational Regulations of the Yarmouth Planning Board Last Revised December 12, 2012 - 18 - e. Narrative summary and any additional documentation of strategy to treat and discharge stormwater and, where applicable, the relationship between the stormwater management strategy and any impairment identified on the watershed 303(d) list. All documentation for subsurface soil investigations referenced by code or key to locations of testing sites on submitted plans. g. Stormwater flow calculations associated with all best management practices shown on submitted plans including discharge volume calculations for design storm frequencies, peak discharge rates for design storm frequencies, and soil percolation rates. Stormwater runoff calculations shall be conducted in HydroCad or similar software program using TR-20 or TR-55. h. Maintenance plans associated with all on -site utilities, responsible parties, descriptions of associated covenants, and funding sources where applicable. L Calculations associated with wastewater design flows. Description of proposed phasing (if any). k. Description of compliance with inclusionary zoning requirements [Sections 412.2 and 414.5.2.3]. I. Narrative description of the use of any open space including the uses that are proposed, the management structure for the open space, and a description of the restrictions that will be placed upon the open space area as applicable. 9. If requested by the Planning Board, the application shall also include a Technical Review Fee to cover the review of specific design or engineering elements of the proposed development subject to MGL. Chapter 44, Section 53G. Operational Regulations of the Yarmouth Planning Board Last Revised December 12, 2012 19-