On behalf of the applicant, we hereby submit this Notice of Intent for the proposed work on a
single-family lot within 100 feet of a Coastal Beach, Coastal Bank, and Land Subject to Coastal
Storm Flowage. The applicant proposes to raze the existing single-family dwelling and construct
a new dwelling in its location. Enclosed please find the following:
1. Administrative Checklist
2. Complete NOI Application WPA Form 3
3. Narrative
4. 100’ Abutter Map
5. Certified Mail Receipts (to be submitted prior to scheduled hearing)
6. 1 original and 7 copies of the Site Plan
7. Check for $262.50 (NOI Fee)
8. Check for $300.00 (Bylaw Fee)
9. Check for $15.00 (Legal Ad Fee)
If you have any questions, please do not hesitate to call.
Sincerely,
GRADY CONSULTING, L.L.C.
Scott Fanara, P.E.
Project Engineer
cc: Joe Disipio DEP - SERO
334 North Street 20 Riverside Drive
Walpole, MA 02081 Lakeville, MA 02347
bdirienzo@yarmouth.ma.us
jjerolimo@yarmouth.ma.us
J:\2025\25-344\Conservation\cover.docx
NARRATIVE
The existing site is a 10,320 square foot lot and consists of a single-family dwelling, concrete
walkways, outdoor shower, shed, gravel driveway, and on-site subsurface sewage disposal
system. The property is directly to the east of Mill Creek. Resource areas were delineated on
site by South River Environmental on September 12, 2025, and consist of a Coastal Beach,
Coastal Bank, and Land Subject to Coastal Storm Flowage. The entire site is located within 100’
of these resource areas. The existing dwelling is located 16.0’ from the Coastal Bank and 24.5’
from the Coastal Beach. The nearest concrete walkway is located 15.0’ from the Coastal Bank
and 23.6’ from the Coastal Beach. The dwelling was constructed in 1940, per the Yarmouth
Assessor’s Department records.
The proposed work is to raze all existing structures and construct a new single family in its place.
The dwelling is proposed no closer than the existing dwelling. A pervious paver patio is also
proposed over an area of existing lawn and concrete to the side of the dwelling, no closer than
the existing concrete walkway. The project proposes an increase in area of coverage within 0-35
feet of the Coastal Bank of 272 square-feet, a decrease within 35-50 feet of 28 square-feet, and
an increase within 50-100 feet of 136 square-feet.
Site access is via the public way of Chilton Road. Erosion control measures and locations are
noted on the Site Plan. Since the slopes are not significant on this site, a single silt sock will
serve as erosion control and the limit of work. The silt sock will be installed prior to any site
work and shall remain until after construction and site stabilization occurs. Specific machinery
for this project will be determined by the contractor, but will generally include the use of an
excavator, dozer, and other mid-large size construction machines. Machines will be stored on
site and at the end of Chilton Road. This is a dead-end road, and construction will not impede
vehicular travel. The anticipated start date for this project is June 1st or within a week of all
department approvals, whichever is earlier.
The work is proposed within 100 feet of a Coastal Beach and Coastal Bank and within Land
Subject to Coastal Storm Flowage. The project has been designed to adhere to the following
regulations.
Yarmouth Wetland Protection Regulations
4.02 Coastal Beaches and Tidal Flats
3) Performance Standards
Any activity which is allowed on a coastal beach or tidal flat or within 100 feet of a coastal
beach or tidal flat shall not have an adverse effect on the coastal beach or tidal flat by:
a) Affecting the ability of waves to remove sand from the beach or tidal flat;
The site is separated from the coastal beach by an existing rock revetment and is located
approximately 7 feet higher than the beach. The proposed redevelopment will not affect
the ability of waves to remove sand from the beach.
b) Disturbing the vegetative cover, if any, so as to destabilize the beach or tidal flat;
The beach is stabilized by an existing rock revetment. Any disturbance of vegetation will
not affect the stabilization at this location. Nevertheless, the existing vegetation adjacent
to the revetment will not be removed.
c) Causing any modification of the beach or downdrift beach that would increase the
potential for storm or flood damage;
The beach will not be modified.
d) Interfering with the natural movement of the beach or tidal flat;
The beach will not be modified or interfered with.
e) Causing artificial removal of sand from the beach or downdrift beach; or
The beach will not be modified or interfered with. No removal of sand from the beach
will occur at any stage of construction or afterwards.
f) Removing seaweed or substrate from the coastal beach in the intertidal zone (between
MLW and MHW) that provides valuable habitat and potential for sand accretion, unless
deemed a public health emergency by the Director of Health.
The intertidal zone is located on the low side of the existing revetment. No work is
proposed in this location.
4.05 Coastal Banks
Any activity that is allowed on a coastal bank shall comply with the following provisions:
a) No new bulkhead, revetment, seawall, groin or other coastal engineering structure shall
be permitted on a coastal bank that provides significant sediment to an adjacent or
downdrift coastal beach; except that such a coastal engineering structure shall be
permitted when required to prevent storm damage to buildings constructed prior to
August 10, 1978, including re-construction of such buildings subsequent to the effective
date of these regulations, provided that the following requirements are met:
i. Coastal engineering structures or modifications thereto shall be designed and
constructed so as to minimize, using best available measures, adverse effects on
adjacent or nearby coastal beaches due to changes in wave action;
ii. The applicant demonstrates that no method of protecting the building other than the
proposed coastal engineering structure is feasible;
iii. Protective planting designed to reduce erosion may be permitted; and
iv. The applicant provides sufficient evidence that the building was constructed pursuant
to a Notice of Intent prior filed before August 10, 1978.
No work is proposed on the coastal bank.
b) Any project on a coastal bank or within 100 feet of the top of a coastal bank, other than a
structure permitted under section 4.05, (3), (a), shall not have an adverse effect due to
wave action on the movement of sediment from the coastal bank to coastal beaches or
land subject to tidal action or flooding, and shall not have an adverse effect on the
stability of a coastal bank.
Wave action is largely controlled by the existing revetment. The proposed structure is
located no closer to the coastal bank than the existing structure. No significant changes
in the site grades are proposed.
4.10 Land Subject to Coastal Storm Flowage
When the Commission determines that Land subject to coastal storm flowage overlays other
Resource areas, the applicable performance standards for each Resource area shall be
independently and collectively applied and the project shall be appropriately conditioned to
protect all stated Resource area values.
a) General Performance Standards
Any activity within land subject to coastal storm flowage which will result in the building upon,
removing, filling or altering of land shall not have an adverse effect on the interests protected by
the bylaw by:
i. reducing the ability of the land to absorb and contain flood waters;
There are no significant changes in grade proposed on site. The current flow patterns
and ability of the land to absorb and contain flood waters shall remain.
i. reducing the ability of the land to buffer more inland areas from flooding and wave
damage;
The revetment largely mitigates stormwater and flood waters from the mainland. The
proposed work includes features such as pervious pavers rather than impervious, gravel
driveway rather than asphalt, and the building includes Smart Vents to allow free flow
of water within the FEMA Flood Zone.
ii. increasing the elevation or velocity of flood waters, or by redirecting or increasing flows
or causing channelization, in each case at the project site, adjacent or nearby
properties, or any public or private way.
There are no significant changes in grade proposed on site. The proposed flow patterns
are designed to match existing conditions.
iii. displacing or diverting flood waters to other properties or resource areas. Fences and
privacy walls, including walls separating one property from another, may obstruct or
divert flood flow and waves toward buildings and protected areas. Solid fences
stockade and similar) must be constructed with 6 inches of clearance below to allow the
passage of floodwaters and wildlife;
No such structures are proposed which have the potential to divert or obstruct flood
flow. The proposed dwelling includes Smart Vents to allow passage of flood waters.
iv. causing, or creating the likelihood of, damage to other structures on land within the
flood plain as debris (collateral damage);
The proposed work will not damage other structures within the flood plain.
v. causing ground, surface or saltate pollution triggered by coastal storm flowage;
There are no sources of pollution contained on this site.
vi. reducing the ability of the resource to serve as a wildlife habitat and migration corridor
through activities such as, but not limited to the removal of substantial vegetative cover
and/or installation of fencing and other structures which prevent wildlife migration
across property.
The project does not propose removal of substantial vegetative cover or any structures
which could prevent wildlife migration across the property.
vii. prevention of the migration of resource areas such as salt marshes due to sea level rise.
No such measures are proposed.
viii. If flood control and storm damage protection functions have already been impaired,
redevelopment must improve existing conditions by reducing impervious surfaces,
restoring flood control and storm damage protection functions, installing native
plantings, or by restoring or creating other wetland resource areas. Where a previously
developed coastal Resource Area has not been regulated under the applicable
performance standards to protect the interests of flood control and storm damage
prevention, the proposed work shall restore those interests
The site has not been impaired.
And shall meet the following requirements;
ix. Existing septic system and cesspool repairs will be allowed provided they meet all Title
5 and local Board of Health thresholds.
The existing septic system is a Title V compliant system and shall remain for the new
dwelling.
x. All groundwater elevations shall incorporate seasonable adjustments if test holes and or
leaching components are 100 feet or closer from major estuaries.
The existing septic system is a Title V compliant system and shall remain for the new
dwelling.
xi. Any proposed deck, shed, or other similar structure must be securely anchored to a
footing or foundation.
All structures will be securely anchored with poured concrete foundations or similar.
xii. Any activity shall preserve existing soils, vegetation, and other natural conditions that
serve as buffers to coastal flooding and storm surges.
No significant site grading or removal of vegetation is proposed.
6.01Setbacks and Buffer Zones
1) Notwithstanding section 6.01(2) below, no new structures, including chicken coops and
swimming and spa pools (with the exception of water dependent structures), will be allowed
within 50 feet of the following Resource Areas:
a) Any freshwater or coastal vegetated wetlands, vernal pools and vernal pool habitat, salt
marshes, banks, lakes, ponds of any size, beaches, dunes, estuaries, the ocean, lands
under water bodies, and intermittent and perennial rivers, streams, brooks and creeks,
and Isolated or Bordering Land Subject to Flooding
We hereby request a waiver from this requirement. The existing site is fully
developed with a single-family dwelling, gravel driveway, concrete walkways, sheds,
outdoor shower, and maintained lawn. The proposed dwelling will maintain the same
existing setback distances to the resource areas. Careful consideration has gone into this
design, including pervious pavers rather than asphalt, gravel driveway rather than asphalt,
and reduction of the existing maintained lawn in favor of a new mitigation area with
native seeding and plants.
2) Minor structures up to 140 square feet total coverage such as sheds, decks, and pervious
patios may be allowed closer than 50 feet to a Resource Area but no closer than 35 feet.
With the exception of “Vista Pruning” as outlined in section 6.03, a 35-foot undisturbed
natural vegetative buffer shall be maintained between all projects and Resource Areas
mentioned in 6.01 (1), above to insulate wetland resource areas from adverse impacts
stemming from development elsewhere in the buffer zone. In cases where the slope of an
undisturbed buffer exceeds 18%, or in any instance where the scope or nature of the project
is likely to require a greater spatial offset to wetland resource areas, the Commission
reserves the right to increase buffer zone width to a more suitable dimension.
No applicable.
3) The following are prohibited within resource areas listed in 6.01 (1) and their 35-foot buffer
zones:
a) Lawn grasses including “Cape Cod Lawns”
b) Landscaping
c) Fertilizers
d) Pesticides (unless part of an approved invasive species removal program)
e) Irrigation except for temporary irrigation for establishment of native plantings
f) Mulch, other than for temporary ground stabilization for one growing season.
Groundcover plantings are to be used for permanent stabilization and weed control.
No new such features are proposed within this buffer. The project proposes the continued
use of the lawn as shown on the plan, which is a significant reduction in area over the exiting
conditions.
4) The following are prohibited within resource areas listed in 6.01(1) and their 50-foot buffer
zones, and the Riverfront Area:
a) Fertilizers
b) Pesticides (unless part of an approved invasive species removal program)
c) Irrigation except for temporary irrigation for establishment of native plantings
The applicant is aware of this requirement and will avoid these measures.
5) Lawns
Turf lawns may be a significant source of nutrients to wetlands, coastal embayments, and
other bodies of water through surface runoff and leaching to the groundwater. Excessive
nutrient loading of water bodies may lead to eutrophication. Indications of eutrophication
include nuisance algal blooms, oxygen depletion, fish kills and foul odors. To minimize
potential adverse impacts due to fertilization, the Conservation Commission requires that
turf lawns be minimized or even eliminated from landscaping plans; particularly in lots
adjoining surface water bodies and wetland resource areas. No new turf lawns shall be
permitted in the 50-foot buffer zone on an undeveloped lot. On lots where turf lawn
currently exists and has for a long period of time, the Commission may require that turf
lawn area to be reduced or eliminated when an application for a new project on that lot is
brought before them. Buffer zones of native plants may be required to reduce surface runoff.
a) New lawns may be irrigated for 2 growing seasons after planting but not thereafter.
d) New lawns in buffer zones shall be or mimic Cape Cod Lawns. A Cape Cod Lawn is an
area that is not irrigated, fertilized, or otherwise treated with chemicals that is diverse
with species including native sedges, mosses, grasses, and other lowgrowing plants that
are well adapted to the conditions of the Cape. Cape Cod Lawns can be established by
seeding with a mix of drought tolerant grasses and forbs and weeding to remove invasive
species as needed.
No new lawns are proposed.
6.02 Mitigation and Restoration
1) At a minimum, a 35-foot undisturbed buffer zone shall be retained between the landward-
most wetland resource area and the limit of proposed site disturbance. Landward of the 35-
foot no-disturb zone, work shall be designed to minimize the area of disturbance, to
preserve as much undisturbed vegetation within the one hundred-foot buffer zone as is
practicable for the proposed use.
Not applicable. The site is fully developed within this buffer zone. The project proposes
mitigation to provide/enhance a vegetated buffer.
2) Where a 50-foot undisturbed buffer zone exists prior to the proposed work, and shall remain
intact upon project completion, further buffer zone enhancement shall not be required.
Not applicable.
3) Where a 50-foot undisturbed buffer zone does not exist prior to the proposed work, any
work proposed within the 100-foot buffer zone shall be subject to mitigation planting
requirements intended to restore, in so far as is possible, both the dimensions of a 50-foot
undisturbed buffer and its vegetation. For work proposed within the 100-foot buffer zone,
the calculation of mitigation is set forth as follows:
a) For proposed, new or replacement hardscape or structure, whether pervious or
impervious, within the 50-100-foot buffer zone, mitigation shall be 2:1.
Applicable. The project proposes to meet this standard.
b) For proposed new or replacement hardscape or minor structure, whether pervious or
impervious within the 35–50-foot buffer zone, mitigation shall be 3:1.
Not applicable. The project proposes a net reduction of coverage within this area.
c) Where a variance is sought for proposed work within the 35-foot buffer, mitigation shall
be determined at the commission’s discretion.
Applicable. The project proposes mitigation in this area to the extent practicable, which
includes the conversion of existing maintained lawn areas.
d) In no case shall the total area of mitigation plantings required be greater than that which
is necessary to restore a 50-foot undisturbed buffer in its entirety.
e) If structures or hardscape already exist within the 35-50 foot buffer, then additional
structures or hardscape may not be allowed within the 100 foot buffer until the 50 foot
buffer and its vegetation have been fully restored.
We request a waiver from this requirement. The entire site is within the 100-foot
buffer, and full restoration of the 50-foot buffer is not practical. An extensive mitigation
plan is proposed to enhance this area.
4) Planting requirements
Where mitigation or restoration of buffer zone vegetation is proposed or required under a
Notice of Intent, it shall meet the following requirements:
a) Locally native and climate adapted plant species suited to the local growing conditions
will be used, refer to the approved plant lists posted on the Conservation website.
Mitigation areas should contain a diversity of woody species with varying heights
sufficient for the space (at least 3 species when the required mitigation area is >300 sqft)
and may be supplemented by an understory of native grasses and forbs (including ferns,
herbs, groundcovers, and perennials). Native grasses and forbs alone cannot be used as
mitigation.
The proposed mitigation plan complies with this regulation.
b) The recommended plant spacing and densities will be used as shown on the approved
plant lists available on the conservation website
The proposed mitigation plan complies with this regulation.
c) Only temporary use of mulch may be applied under the drip line of each plant at the time
of planting for moisture retention, soil stabilization, and weed control during
establishment. Native groundcovers will be utilized in the spaces between larger
plantings. At no time shall a mitigation or restoration area be sheet mulched. Hand
weeding is allowed.
The proposed mitigation plan complies with this regulation.
d) Foundation landscape beds within the buffer zone: Proposed foundation landscape bed
plantings should appear on all plans if within resource areas and the 100-foot buffer
zone. Foundation beds are defined as directly abutting a dwelling/structure and are a
maximum of 5 feet in width. These areas may be planted with native species, native
cultivars, or non-invasive non-natives with approval from the Commission or the
Conservation Administrator.
Foundation landscape beds are not proposed with this project.