Loading...
HomeMy WebLinkAbout792-792-89The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, 14, Easton, MA 02375 • Tel 508 822 6934 • Fax • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:1/22/2026 Contract Number:146 Concrete Supplier:Cape Cod Ready Mix PLACEMENT INFORMATION Date Cast: 1/8/2026 Time Cast: 8:45 AM Date Received: 1/9/2026 Placement Location:BASEMENT ENTIRE SLAB SECTION Placement Method:Pump Cylinders Made By:Mohammed Rifaz Material Type:CONCRETE CYL Placement Vol. (yd ):148 Aggregate Size (in):1 1/2 Cylinder Size:6 x 12 INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures:SIKA CONTROL 75 TEST RESULTS Slump (in) (C-143):9 (Metric: 230) Air Content (%) (C-231):3.7 Air Temp (°F):36 Conc. Temp (°F) (C-1064):63 Load Number:10 Mixer Num.: Ticket Num.:34256 Cubic Yards:10 Design (psi):4500 Batch 7:03 AM Arrive 7:58 AM Depart 8:15 AM Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-89A N 29.2 6.01 28.37 1/15/2026 Lab Unbonded 7 5 147.48 5200 792-89B N 29 6 28.23 1/22/2026 Lab Unbonded 14 5 161.66 5720 792-89C 29.3 2/5/2026 Lab 28 792-89D 29.35 2/5/2026 Lab 28 792-89E 29.35 2/5/2026 Lab 28 792-89F 29.15 HOLD Lab 0 3 2 Remarks:Kaylie OSullivan Reviewed By