Loading...
HomeMy WebLinkAbout792-792-84 (1)The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, 14, Easton, MA 02375 • Tel 508 822 6934 • Fax • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:1/13/2026 Contract Number:146 Concrete Supplier:Cape Cod Ready Mix PLACEMENT INFORMATION Date Cast: 1/6/2026 Time Cast: 6:50 AM Date Received: 1/7/2026 Placement Location:SBR TANK SLABS #9, #10, #17, #28, #36 Placement Method:Pump Cylinders Made By:Rob Reuter Material Type:CONCRETE CYL Placement Vol. (yd ):330 Aggregate Size (in):1 1/2 Cylinder Size:6 x 12 INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures:WARM WATER TEST RESULTS Slump (in) (C-143):8 (Metric: 5) Air Content (%) (C-231):4 Air Temp (°F):35 Conc. Temp (°F) (C-1064):72 Load Number:2 Mixer Num.: Ticket Num.:34209 Cubic Yards:10 Design (psi):4500 Batch 5:45 AM Arrive 6:45 AM Depart 7:14 AM Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-84A N 29 6 28.32 1/13/2026 Lab Unbonded 7 6 118.82 4200 792-84B 29.15 1/20/2026 Lab 14 792-84C 28.95 2/3/2026 Lab 28 792-84D 28.95 2/3/2026 Lab 28 792-84E 28.95 2/3/2026 Lab 28 792-84F 28.95 HOLD Lab 0 3 2 Remarks:Kaylie OSullivan Reviewed By