Thank you, Brittany, this is helpful. I've responded to some of your questions below in blue.
1 Inter-fluve
Iwhere will logs be sourced for stream building? is a certain species desired? The contractor determines the source, but it is typically from the
Cape or southeastern MA. All native species; we typically request those common to the area like pine, oak, maple. If you know of any being
cleared, let us know!
IWhat soiltype/componentswill be sourced for areas requiring fill since there will not be enough native dredge materialonsite?No soilwiLL be
brought in - between the dredge and the excavation of upland soils from the mounds and berms, we will be able to provide the fill material
necessary.
Will staging areas and construction access paths be restored except for the one that may become a future parking area? Yes, that is correct.
IGeneral: What is anticipated permitting/construction schedule? We anticipate permittingto go through much of 2026 and construction can begin
as soon as permitting and final designs are complete -maybe end of 2026 or into 2027.
IManythanks,
Nick
Nick Nelson, CEW