Loading...
HomeMy WebLinkAboutinterfluve response to CA questions 2.4Attention!: This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. Thank you, Brittany, this is helpful. I've responded to some of your questions below in blue. 1 Inter-fluve Iwhere will logs be sourced for stream building? is a certain species desired? The contractor determines the source, but it is typically from the Cape or southeastern MA. All native species; we typically request those common to the area like pine, oak, maple. If you know of any being cleared, let us know! IWhat soiltype/componentswill be sourced for areas requiring fill since there will not be enough native dredge materialonsite?No soilwiLL be brought in - between the dredge and the excavation of upland soils from the mounds and berms, we will be able to provide the fill material necessary. Will staging areas and construction access paths be restored except for the one that may become a future parking area? Yes, that is correct. IGeneral: What is anticipated permitting/construction schedule? We anticipate permittingto go through much of 2026 and construction can begin as soon as permitting and final designs are complete -maybe end of 2026 or into 2027. IManythanks, Nick Nick Nelson, CEW �M s nuvlal Geomoryhdoglrt, Femi al Di eRar (he/h m) Fda