Loading...
HomeMy WebLinkAbout792-792-75The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, 14, Easton, MA 02375 • Tel 508 822 6934 • Fax • www.swcole.com Report of Grout Compressive Strength ASTM C109 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Supplier: Product Name: PLACEMENT INFORMATION Date Cast: 12/11/2025 Time Cast: 12:00 AM Date Received: 12/12/2025 Placement Location:ANCHORS: 141, 140, 118, 117, 15 Placement Method: Specimen Made By: * Specimen Not Made By S.W. Cole Placement Vol. (yd ): Aggregate Size (in): INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures: TEST RESULTS Slump (in) (C-143): Air Temp (°F): Conc. Temp (°F) (C-1064): Batch Number: Mixer Number: Ticket Number: Design (psi):4000 Specimen Designation Area (in ) Date Of Test Cure Type Age (Days) Load (kips) Strength (psi) 792-75A 4.20 12/19/2025 Lab 8 18.11 4310 792-75B 4.10 12/19/2025 Lab 8 13.65 3330 792-75C 4.06 12/26/2025 Lab 15 20.68 5090 792-75D 4.02 1/8/2026 Lab 28 21.34 5310 792-75E 4.06 1/8/2026 Lab 28 21.98 5410 792-75F HOLD Lab 3 2 Remarks:Kaylie OSullivan Reviewed By