Loading...
HomeMy WebLinkAbout792-792-69The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, 14, Easton, MA 02375 • Tel 508 822 6934 • Fax • www.swcole.com Report of Grout Compressive Strength ASTM C109 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Supplier: Product Name: PLACEMENT INFORMATION Date Cast: 12/5/2025 Time Cast: 12:00 AM Date Received: 12/8/2025 Placement Location:ANCHOR #162, 163, 164, 165, 166 Placement Method: Specimen Made By: * Specimen Not Made By S.W. Cole Placement Vol. (yd ): Aggregate Size (in): INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures: TEST RESULTS Slump (in) (C-143): Air Temp (°F): Conc. Temp (°F) (C-1064):45 Batch Number: Mixer Number: Ticket Number: Design (psi):4000 Specimen Designation Area (in ) Date Of Test Cure Type Age (Days) Load (kips) Strength (psi) 792-69A 4.06 12/9/2025 Lab 4 17.53 4320 792-69B 4.08 12/12/2025 Lab 7 27.73 6800 792-69C 4.06 12/19/2025 Lab 14 30.6 7540 792-69D 4.08 1/2/2026 Lab 28 32.51 7970 792-69E 4.06 1/2/2026 Lab 28 32.2 7930 792-69F HOLD Lab 3 2 Remarks: SPECIFIC GRAVITY: 1.92 Kaylie OSullivan Reviewed By