HomeMy WebLinkAbout792-792-81 (1)The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control.
58 Norfolk Ave, 14, Easton, MA 02375 • Tel 508 822 6934 • Fax • www.swcole.com
Report of Grout Compressive Strength
ASTM C109
Project Name:Yarmouth MA - Town of
Yarmouth Water Resource
Recovery Facility - Concrete
Testing Services
Client:Wright-Pierce
Project #:25-0468
Supplier:
Product Name:Grout Cube
PLACEMENT INFORMATION
Date Cast: 12/17/2025 Time Cast: 12:00 AM Date Received: 12/18/2025
Placement Location:ANCHORS #190B, REGROUT 67, 69, 47
Placement Method:
Specimen Made By:
* Specimen Not Made By S.W. Cole
Placement Vol. (yd ):
Aggregate Size (in):
INITIAL CURING CONDITION DELIVERY INFORMATION
Temperatures
Minimum (°F):Maximum (°F):
Admixtures:
TEST RESULTS
Slump (in) (C-143):
Air Temp (°F):
Conc. Temp (°F) (C-1064):50
Batch Number:
Mixer Number:
Ticket Number:
Design (psi):4000
Specimen
Designation Area (in )
Date Of
Test
Cure
Type
Age
(Days)
Load
(kips)
Strength
(psi)
792-81A 4.04 12/22/2025 Lab 5 11.03 2730
792-81B 4.04 12/24/2025 Lab 7 14.5 3590
792-81C 4.00 12/31/2025 Lab 14 15.22 3810
792-81D 4.06 1/14/2026 Lab 28 16.12 3970
792-81E 4.08 1/14/2026 Lab 28 16.89 4140
792-81F 4.06 2/13/2026 Lab 58 17.02 4190
3
2
Remarks:Kaylie OSullivan
Reviewed By