HomeMy WebLinkAboutCCOR 03-06-2026 792-104Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. , , , • Tel • Fax • www.swcole.com Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:3/6/2026 Client:Wright-Pierce Client Rep:Eric SaloWeather:Rain 30 - 30°F S.W.COLE Rep:Kellie Jigerjian General Contractor:Nickerson Time Onsite:07:00 - 08:30 Placement Type: Footing  Wall  Slab  OtherPlacement Location:Solids handling building, SW wall Concrete Placement Observations Observed Comments Required mix used Yes 4500psi 3/4" Concrete properly conveyed to all areas of placement Yes pump truck Internal vibration / consolidation of concrete Yes handheld vibrator Even layering around openings and embedments Yes troweled evenly around openings and enbedments Post placement observations (finishing, curing, etc.)Yes smooth trowel finish Field Testing of Concrete performed:Yes *CYLINDER SET NO:792-104  *Refer to associated concrete test report Notes: S.W Cole Construction Services Technician KEJ arrived onsite at 7:00AM for concrete testing and sampling for the locations referenced above Concrete arrived onsite at 7:30AM (load 1) carrying 11CY of 4500psi 3/4", with SIKA control 75 and 1% nonchloride, added prior placed via pump truck One set of tests were performed with the following results Load 1: Slump: 7-3/4" Air content: 3.2% Concrete Temperature: 65F One set of compression cylinders (4x8) were cast for testing at 7, 14, 28 (3), and one held in reserve. KEJ spoke with Eric Salo while onsite After testing KEJ packed up equipment, had time corroborated, and left at 8:30AM Attachments: 2 Photos Reviewed by:3/10/2026 Kaylie OSuivKaylie OSullivan Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. , , , • Tel • Fax • www.swcole.com