HomeMy WebLinkAboutCCOR 03-18-2026 792-109 to 792-111Concrete Construction Observation Report
The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control.
, , , • Tel • Fax • www.swcole.com
Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:3/18/2026
Client:Wright-Pierce Client Rep:Eric SaloWeather:Clear 26 - 30°F S.W.COLE Rep:Kellie Jigerjian
General Contractor:Nickerson Time Onsite:06:30 - 11:15
Placement Type: Footing Wall Slab OtherPlacement Location:SPR slab sections 32, 39, 44, 53
Concrete Placement Observations Observed Comments
Required mix used Yes 4500psi, 1-1/2"
Concrete properly conveyed to all areas of placement Yes pump truck
Internal vibration / consolidation of concrete Yes handheld vibrator
Even layering around openings and embedments Yes troweled evenly around openings and enbedments
Post placement observations (finishing, curing, etc.)Yes smooth screed finish
Field Testing of Concrete performed:Yes
*CYLINDER SET NO:792-109 to 792-111 *Refer to associated concrete test report
Notes:
S.W Cole Construction Services Technician KEJ arrived onsite at 6:30AM for concrete testing and sampling for the
locations referenced above
Concrete arrived onsite at 7:05AM (load 1), 8:05AM (load 10), and 10:05AM (load 24) all carrying 10CY of 4500psi
3/4", with SIKA control 75 and 1%
nonchloride (added only for last 40CY), added prior
placed via pump truck
Three set of tests were performed with the following results
Load 1:
Slump: 7-3/4"
Air content: 4.0%
Concrete Temperature: 72F
Load 10:
Slump: 7-1/4"
Air content: 4.0%
Concrete Temperature: 66F
Load 24:
Slump: 9-3/4"
Air content: 4.1%
Concrete Temperature: 64F
Three sets of compression cylinders (6x12, 15 altogether) were cast for testing at 7, 14, 28 (2), and one held in
reserve. CYL 792-111 was cast from the mix with Accelerator
After testing KEJ packed up equipment, had time corroborated, and left at 11:15AM
Attachments: 1 Other Reviewed by:3/18/2026 Kaylie OSu iv Kaylie OSullivan