Loading...
HomeMy WebLinkAbout5223 21 Woodbine Ave Existing Conditions Site Plan 02.04.26LEGEND 99 — EXISTING CONTOUR X 99.1 EXIST. SPOT ELEV. —[991— PROPOSED CONTOUR [98.4] PROPOSED SPOT EL. THI 0 TEST HOLE E CONCRETE BOUND UTILITY POLE FIRE HYDRANT OCATCH BASIN LIGHT POST �Oo WATER SHUT OFF X — FENCE W — WATER LINE G GAS LINE — OHE — OVERHEAD ELECTRIC S — SEWER LINE NOTE: NOT ALL SYMBOLS MAY APPEAR IN DRAWING ZONING SUMMARY ZONING DISTRICT: R-25 DISTRICT MIN. LOT SIZE 25,000 S.F. MIN. LOT FRONTAGE 150' MIN. FRONT SETBACK 30' MIN. SIDE SETBACK 15' MIN. REAR SETBACK 20' MAX. BUILDING COVERAGE 25% MAX. BUILDING HEIGHT 35' EXISTING BUILDING COVERAGE EXCLUDING ROOFED OUTDOOR KITCHEN: 21.4% (963 S.F.) EXISTING ROOFED OUTDOOR KITCHEN COVERAGE: 5.6% (252 S.F.) TOTAL BUILDING COVERAGE 27.07. (1,215 S.F.) SURVEY: NHO DRAFTED BY: NHO/PTT CHECKED BY: DCE #25-336 12'X12' 2 5 - 4,500f S.F 0.10f AC. QP� r ^C SPA Scale: 1 "= 20' 0 10 20 30 40 50 FEET NOTES 1. DATUM IS NAVD88 2. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING OR ANY OTHER PURPOSE. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING DIGSAFE (811) AND VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK. 4. EXISTING SEPTIC LOCATION PER TIE —CARD ON FILE WITH TOWN. �' J ZONING SETBACK (TYP. ) 9 '5F .0 o O 6/1 Locus Route 28 0 3 a, o � 3 � �aG /e� a d ay 3 m LOCUS MAP SCALE 1 "=2000't ASSESSORS MAP 37 PARCEL 97 EXISTING CONDITIONS SITE PLAN LOCATED AT #21 WOODBINE AVE WEST YARMOUTH, MA PREPARED FOR BERINO DASILVA ,AAAA , _ DATE: FEBRUARY 4, 2026 .,IN OFMgS.� DANIEL _f v °FESS\°a �1f ND s u Rv DATE DANIEL A. OJALA, P.L.S. I 508-362-4541 downcope.com down cape C 111eefi7g, h7C. civil engineers land surveyors 939 Main Street (R to 6A) YARMOUTHPORT MA 02675