Loading...
HomeMy WebLinkAboutAppendix A(2) - Construction Plot Plan1 2 17 5 28 29 24 1613 25 7 27 21 2330 18 6 10% POROUS GATE - 10 FT LNG TANK MAINTENANCE ACCESS ROAD TRUCK UNLOADING AREA SPILL CONTAINMENT PAD SPILL CONTAINMENT TRENCH TIE-IN POINTS: BOG RAW GAS TP-02B POROUS VAPOR FENCE - 10 FT FIRE ACCESS ROAD 10 4 SECURITY FENCE 9 3 32 APPROXIMATE EXTENT OF TREE CLEARING CONSTRUCTION ENTRANCE H G F E D B A C B 1 C 2 3 4 5 6 7 8 2 3 4 5 6 7 81 H G F E D Designed & Date Checked & Date Approved & DateDescription Sheet:Drawing No: Drawn By:Scale:Date: Project Title: Drawing Title: REVISIONS A Rev. SOUTH YARMOUTH LNG CONSTRUCTION PLOT PLAN EV 1:85 11/3/2023 23510-PIP-PLT-0000-0002 1 OF 10ISSUED FOR CLIENT REVIEW EV 12/11/2023 RGR 12/11/2023 DJ 12/11/2023 1 ISSUED FOR CLIENT REVIEW EV 5/23/2024 RGR 5/23/2024 DJ 5/23/2024 2 ISSUED FOR DESIGN NB 10/11/2024 RGR 10/11/2024 DJ 10/11/2024 3 ISSUED FOR DESIGN NB 4/01/2025 RGR 4/01/2025 DJ 4/01/2025 CONSTRUCTION PARKING AREA CONSTRUCTION LAYDOWN AERIAL OVERLAY IS APPROXIMATE APPROXIMATE EXTENT OF TREE CLEARING NOTES 1.APPROXIMATE TREE CLEARING AREA: 225,000 SQ FT (5.16 ACRES). 2.ALL NEW LNG SPILL TRENCHES ARE PROVIDED WITH TRENCH GRATING. ON THIS PLAN, TRENCH GRATING IS ONLY SHOWN FOR NEW LNG SPILL TRENCHES WITHIN ROADWAYS IN ORDER TO MAINTAIN THEVISIBILITY OF PIPE ROUTING WITHIN THE REST OF THE SPILL TRENCH SYSTEM. GRATING AT EACH NEW LNG IMPOUNDMENT BASIN IS ONLY PROVIDED OVER THE TRENCH ENTRY/ SUMP PIT. 3.*ITEMS 11 AND 12, AMBIENT VAPORIZER VAP-AMB1 AND PRE-HEATER E-2, MAY BE RELOCATED FROM THE NEW BOG COMPRESSOR AREA TO THE NEW LNG STORAGE TANK AREA FOLLOWING DECOMMISSIONING OF THE EXISTING LNG STORAGE TANK TK-1. LEGEND: PROPERTY BOUNDARY 10' POROUS VAPOR FENCE LNG TRUCK UNLOADING LINE LNG SENDOUT LINE NITROGEN PIPING BOG LINE NATURAL GAS SENDOUT EXISTING LNG TRUCK UNLOADING LINE EXISTING SENDOUT LINE EXISTING BOG LINE SECURITY FENCE CONCRETE SPILL TRENCH GRATING NITROGEN UTILITY STATION TIE-IN POINTS: LNG TRUCK UNLOADING TP-101 TIE-IN POINT: LNG SENDOUT TP-103 8 22 26 19 20 11/12 NOTE 3 * 15 11/12* NOTE 3 14 31 T-1000 PROPOSED LNG STORAGE TANK E-2 EXISTING PRE-HEATER C-9101/9102 EXISTING INSTRUMENT AIR COMPRESSOR PACKAGE P-1001A/B/C PROPOSED LNG SENDOUT PUMPS BO-600A/B and BLDG-0006 EXISTING DECOMMISSIONED IN PLACE BOIL OFF COMPRESSORS AND BUILDING BLDG-0001 EXISTING CONTROL BUILDING E-1002 PROPOSED BOG PREHEATER OS-623 EXISTING ODORANT STORAGE BLDG-0003 EXISTING STORAGE BUILDING #1 T-5700 PROPOSED LIQUID NITROGEN STORAGE TANK, VAPORIZERS AND RECEIVER C-8000/8001 EXISTING BOIL OFF COMPRESSOR PACKAGE BLDG-0004 EXISTING STORAGE BUILDING #2 S/P-6100 PROPOSED LNG IMPOUNDMENT (NEW TANK AREA) & SUMP PUMP FFC-9001/9002 EXISTING GLYCOL AIR COOLERS BLDG-0007 EXISTING TRUCK LOADING AREA AND BUILDING S/P-6200 PROPOSED LNG IMPOUNDMENT (EXISTING VAPORIZER AREA) & SUMP PUMP VAP-151/251/351/451 EXISTING EXISTING VAPORIZER #1 (BLUE), #2 (YELLOW), #3 (RED), #4 (GREEN) PDC-100 EXISTING BOIL OFF GAS (BOG) ELECTRICAL BUILDING N/A PROPOSED STORM WATER MANAGEMENT POND AND TREATMENT FOREBAY BLDG-0005 and B-1,B-2,B-3,B-4 EXISTING BOILER BUILDING AND BOILERS #1-4 BLDG-0002 EXISTING ADMIN & COGEN BUILDING TR-XXX PLANNED ELECTRIC GRID TRANSFORMER (EVERSOURCE)TK-GT-01 EXISTING WATER GLYCOL (W/G) TANK BLDG-0015 EXISTING LOCKER ROOMS TK-1 EXISTING LNG STORAGE TANK -EXISTING METERING SENDOUT SKID N/A EXISTING VAPORIZER IMPOUNDMENT P-500A/B EXISTING LNG TRANSFER PUMP A/B GEN#1/2/3 EXISTING GENERATORS #1/2/3 N/A EXISTING TRUCK UNLOADING IMPOUNDMENT VAP-AMB1 EXISTING AMBIENT VAPORIZER N/A EXISTING STANDBY GENERATOR