HomeMy WebLinkAboutAppendix A(2) - Construction Plot Plan1
2
17
5
28
29
24
1613
25
7
27
21
2330
18
6
10% POROUS
GATE - 10 FT
LNG TANK MAINTENANCE
ACCESS ROAD
TRUCK UNLOADING
AREA SPILL CONTAINMENT
PAD
SPILL CONTAINMENT
TRENCH
TIE-IN POINTS:
BOG
RAW GAS TP-02B
POROUS VAPOR
FENCE - 10 FT
FIRE ACCESS ROAD
10
4
SECURITY FENCE
9
3
32
APPROXIMATE EXTENT
OF TREE CLEARING
CONSTRUCTION
ENTRANCE
H
G
F
E
D
B
A
C
B
1
C
2 3 4 5 6 7 8
2 3 4 5 6 7 81
H
G
F
E
D
Designed
& Date
Checked
& Date
Approved
& DateDescription
Sheet:Drawing No:
Drawn By:Scale:Date:
Project Title:
Drawing Title:
REVISIONS
A
Rev.
SOUTH YARMOUTH LNG
CONSTRUCTION PLOT PLAN
EV 1:85 11/3/2023
23510-PIP-PLT-0000-0002 1 OF 10ISSUED FOR
CLIENT REVIEW
EV
12/11/2023
RGR
12/11/2023
DJ
12/11/2023
1 ISSUED FOR
CLIENT REVIEW
EV
5/23/2024
RGR
5/23/2024
DJ
5/23/2024
2 ISSUED FOR
DESIGN
NB
10/11/2024
RGR
10/11/2024
DJ
10/11/2024
3 ISSUED FOR
DESIGN
NB
4/01/2025
RGR
4/01/2025
DJ
4/01/2025
CONSTRUCTION
PARKING AREA
CONSTRUCTION
LAYDOWN
AERIAL OVERLAY
IS APPROXIMATE
APPROXIMATE EXTENT
OF TREE CLEARING
NOTES
1.APPROXIMATE TREE CLEARING AREA:
225,000 SQ FT (5.16 ACRES).
2.ALL NEW LNG SPILL TRENCHES ARE
PROVIDED WITH TRENCH GRATING. ON THIS
PLAN, TRENCH GRATING IS ONLY SHOWN
FOR NEW LNG SPILL TRENCHES WITHIN
ROADWAYS IN ORDER TO MAINTAIN
THEVISIBILITY OF PIPE ROUTING WITHIN THE
REST OF THE SPILL TRENCH SYSTEM.
GRATING AT EACH NEW LNG
IMPOUNDMENT BASIN IS ONLY PROVIDED
OVER THE TRENCH ENTRY/ SUMP PIT.
3.*ITEMS 11 AND 12, AMBIENT VAPORIZER
VAP-AMB1 AND PRE-HEATER E-2, MAY BE
RELOCATED FROM THE NEW BOG
COMPRESSOR AREA TO THE NEW LNG
STORAGE TANK AREA FOLLOWING
DECOMMISSIONING OF THE EXISTING LNG
STORAGE TANK TK-1.
LEGEND:
PROPERTY BOUNDARY
10' POROUS VAPOR FENCE
LNG TRUCK UNLOADING LINE
LNG SENDOUT LINE
NITROGEN PIPING
BOG LINE
NATURAL GAS SENDOUT
EXISTING LNG TRUCK UNLOADING LINE
EXISTING SENDOUT LINE
EXISTING BOG LINE
SECURITY FENCE
CONCRETE
SPILL TRENCH GRATING
NITROGEN UTILITY STATION
TIE-IN POINTS:
LNG TRUCK UNLOADING
TP-101
TIE-IN POINT:
LNG SENDOUT
TP-103
8
22
26
19 20
11/12
NOTE 3
*
15
11/12*
NOTE 3
14
31
T-1000 PROPOSED LNG STORAGE TANK E-2 EXISTING PRE-HEATER C-9101/9102 EXISTING INSTRUMENT AIR COMPRESSOR PACKAGE
P-1001A/B/C PROPOSED LNG SENDOUT PUMPS BO-600A/B and BLDG-0006 EXISTING DECOMMISSIONED IN PLACE BOIL OFF
COMPRESSORS AND BUILDING
BLDG-0001 EXISTING CONTROL BUILDING
E-1002 PROPOSED BOG PREHEATER OS-623 EXISTING ODORANT STORAGE BLDG-0003 EXISTING STORAGE BUILDING #1
T-5700 PROPOSED LIQUID NITROGEN STORAGE TANK, VAPORIZERS AND
RECEIVER
C-8000/8001 EXISTING BOIL OFF COMPRESSOR PACKAGE BLDG-0004 EXISTING STORAGE BUILDING #2
S/P-6100 PROPOSED LNG IMPOUNDMENT (NEW TANK AREA) & SUMP PUMP FFC-9001/9002 EXISTING GLYCOL AIR COOLERS BLDG-0007 EXISTING TRUCK LOADING AREA AND BUILDING
S/P-6200 PROPOSED LNG IMPOUNDMENT (EXISTING VAPORIZER AREA) &
SUMP PUMP
VAP-151/251/351/451 EXISTING EXISTING VAPORIZER #1 (BLUE), #2 (YELLOW),
#3 (RED), #4 (GREEN)
PDC-100 EXISTING BOIL OFF GAS (BOG) ELECTRICAL BUILDING
N/A PROPOSED STORM WATER MANAGEMENT POND AND TREATMENT
FOREBAY
BLDG-0005 and B-1,B-2,B-3,B-4 EXISTING BOILER BUILDING AND BOILERS #1-4 BLDG-0002 EXISTING ADMIN & COGEN BUILDING
TR-XXX PLANNED ELECTRIC GRID TRANSFORMER (EVERSOURCE)TK-GT-01 EXISTING WATER GLYCOL (W/G) TANK BLDG-0015 EXISTING LOCKER ROOMS
TK-1 EXISTING LNG STORAGE TANK -EXISTING METERING SENDOUT SKID N/A EXISTING VAPORIZER IMPOUNDMENT
P-500A/B EXISTING LNG TRANSFER PUMP A/B GEN#1/2/3 EXISTING GENERATORS #1/2/3 N/A EXISTING TRUCK UNLOADING IMPOUNDMENT
VAP-AMB1 EXISTING AMBIENT VAPORIZER N/A EXISTING STANDBY GENERATOR