HomeMy WebLinkAboutApproved Site plan 3.22.2026ZONING SETBACK LINE (TYP.)
ZONE AE (12)
ZONE X
FLINTLOCKGRAVEL/DIRTPROPOSED NEW Garden
New walkway and
Allow invasive species on coastal bank:
2) Construct front patio;
3) Widen Driveway;
4) Construct front walkway;
5) Reconstruct masonry front entry;
5.0'5.0'New step entry
do not remove; Prevent erosion,
New ornamental & native plants
Allow vegetation to remain
do not replace; vegetation within 5'
Fence
Regrading to accomodate level driveway to property line (elev.=17' to 13.5)no retaining wall required; Mitigation and erosion preventive planting12"Ø Coir Coconut Fiber Rolls along property lineNative Plants-5 Inkberry
TOP OF
COASTAL B
A
N
K
DELINEATED
W
E
T
L
A
N
D
L
I
N
E
New Steps to patio
of house perimeter to ground level, to
Cut vegetation within 5'
of garage perimeter.
1
2
WAY
(40' WIDE)
35' from COASTAL BA
N
K
100' from COASTAL BANK
Driveway expansion
from 12' to 18' (width)
4
761 SF
MITIGATION AREA #2 (see list with both elements)
Replace existing vegetation
with native and ornamental species3
Replace front entry (masonry)
Replace front walk with permeable
paving stones (Bluestone or other)
50' fro
m
C
O
A
S
T
A
L
B
A
N
K
Replace existing driveway
widen from 12' to 17.3'
3/4' crushed stone surface;
Compacted Gravel footing:
allow owner passage.
16" Tupelo to remain
12" Red Cedar
10" Maple
Boulder
Boulder
Ex. Ilex
Existing vegetation line
HEMLOCK
ARBORVITAE HEDGE5' PASSAGEExisting Yew Hedge (to remove)
10" Birch
14" Maple
8" Birch
5" BirchDRIVEWAYRemove multiflora roseNo work anticipated in this area
EDGE patio (197 sf)
Native Plants-5 Switch Grass
Native Plants-5 Butterfly Weed
12 Blue Holly
Native Plants-3 Fothergilla
PERFORMED
0
4
-
1
7
-
2
0
2
5
BY WET TECH
L
A
N
D
D
E
S
I
G
N
,
I
N
C
A A'
247 SF
15.32
Garage=17.12
506 SF
Black Tupelo (Nyssa sylvatica) develops a deep, strong taproot system rather
than wide-spreading roots
MITIGATION AREA #1
MITIGATION AREA #3
Cobblestone (or similar) edging
(Garage side)
Replace these yews (et al)
for mitigation planting; first.
RELOCATE 3-5 FIELDSTONE FOR
DRIVEWAY ENTRY RECONFIGURATION
wettechlanddesign@gmail.comwww.wetlandplans.com