Loading...
HomeMy WebLinkAboutApproved Site plan 3.22.2026ZONING SETBACK LINE (TYP.) ZONE AE (12) ZONE X FLINTLOCKGRAVEL/DIRTPROPOSED NEW Garden New walkway and Allow invasive species on coastal bank: 2) Construct front patio; 3) Widen Driveway; 4) Construct front walkway; 5) Reconstruct masonry front entry; 5.0'5.0'New step entry do not remove; Prevent erosion, New ornamental & native plants Allow vegetation to remain do not replace; vegetation within 5' Fence Regrading to accomodate level driveway to property line (elev.=17' to 13.5)no retaining wall required; Mitigation and erosion preventive planting12"Ø Coir Coconut Fiber Rolls along property lineNative Plants-5 Inkberry TOP OF COASTAL B A N K DELINEATED W E T L A N D L I N E New Steps to patio of house perimeter to ground level, to Cut vegetation within 5' of garage perimeter. 1 2 WAY (40' WIDE) 35' from COASTAL BA N K 100' from COASTAL BANK Driveway expansion from 12' to 18' (width) 4 761 SF MITIGATION AREA #2 (see list with both elements) Replace existing vegetation with native and ornamental species3 Replace front entry (masonry) Replace front walk with permeable paving stones (Bluestone or other) 50' fro m C O A S T A L B A N K Replace existing driveway widen from 12' to 17.3' 3/4' crushed stone surface; Compacted Gravel footing: allow owner passage. 16" Tupelo to remain 12" Red Cedar 10" Maple Boulder Boulder Ex. Ilex Existing vegetation line HEMLOCK ARBORVITAE HEDGE5' PASSAGEExisting Yew Hedge (to remove) 10" Birch 14" Maple 8" Birch 5" BirchDRIVEWAYRemove multiflora roseNo work anticipated in this area EDGE patio (197 sf) Native Plants-5 Switch Grass Native Plants-5 Butterfly Weed 12 Blue Holly Native Plants-3 Fothergilla PERFORMED 0 4 - 1 7 - 2 0 2 5 BY WET TECH L A N D D E S I G N , I N C A A' 247 SF 15.32 Garage=17.12 506 SF Black Tupelo (Nyssa sylvatica) develops a deep, strong taproot system rather than wide-spreading roots MITIGATION AREA #1 MITIGATION AREA #3 Cobblestone (or similar) edging (Garage side) Replace these yews (et al) for mitigation planting; first. RELOCATE 3-5 FIELDSTONE FOR DRIVEWAY ENTRY RECONFIGURATION wettechlanddesign@gmail.comwww.wetlandplans.com