Loading...
HomeMy WebLinkAboutPetition 119 Staff Report 032626 with Attached Application Page 1 of 3 T O W N O F Y A R M O U T H 1146 ROUTE 28, SOUTH YARMOUTH, MASSACHUSETTS 02664-4492 Telephone (508) 398-2231, Ext. 1276, Fax (508) 398-2365 MEMORANDUM To: Planning Board From: Kathy Williams, Town Planner Date: March 26, 2026 Subject: Staff Report – Petition #119 Special Permit for Two Family Dwelling Huzafia Corporation - 49 & 55 Route 28 and 10 Drew’s Way, West Yarmouth A. General Description: The Owner/Applicant, Huzafia Corporation, owns three adjoining parcels at 49 & 55 Route 28 and 10 Drew’s Way, in West Yarmouth totaling approximately 2.26 acres. Two of the lots contain Becker’s Package Store and the associated paved parking area with two curb cuts off Route 28 and one off Drew’s Way. The third lot is currently wooded with frontage along Drew’s Way. The applicant is proposing to renovate and expand the existing Becker’s Package Store into a mixed- use building consisting of one enlarged commercial unit on the first floor (total of 5,074 square feet (sf)) and two 2-bedroom dwelling units on a new 2,683 sf second floor. The building will have a sprinkler system. Other improvements include more efficient parking layout with a single curb cut off Route 28, new septic system with stub for future municipal sewer connection, above grade stormwater management system, and landscaping. The parcel is being developed using the B2 zoning district and is also located within the Aquifer Protection District (APD). See the attached Project Narrative and Stormwater Management Report for more information on the proposed project. The Applicant is seeking a Special Permit per Zoning Bylaw Section 202.5 – Use Regulation Table, Use Code A2 to allow a two-family dwelling. The applicant is proposing to combine all three lots via an 81X plan, resulting in a lot greater than twice the minimum 20,000 sf lot size required in the B2 zoning district. This makes them eligible for a two-family dwelling via Special Permit from the Planning Board. Two family dwellings are allowed as of right in the APD. Other relief required, such as for setbacks, would be through the Zoning Board of Appeals. B. Process: Pursuant to MGL Chapter 40A, Section 9, the Planning Board must hold a public hearing within 65 days of filing the application. The Special Permit application was submitted on March 3, 2026. The Public Hearing was opened on March 18, 2026 and directly continued to April 1st at the request of the applicant. The Planning Board’s decision must be made within 90 days following the closing of the public hearing. A Special Permit requires a two-thirds vote (5 out of 7). C. Section 103.2.2 Special Permit Criteria: Special permits shall not be granted unless the applicant demonstrates that no undue nuisance, hazard, or congestion will be created and that there will be no substantial harm to the established or future character of the neighborhood or town. Planning Division Page 2 of 3 Planning Board Staff Report - Petition 119 – Becker’s Package Store March 26, 2026 D. Comments from Other Committees: 1. Site Plan Review Team Comments: As it was originally thought the property would be developed under the ROAD bylaw, the applicant went through the SPR Team on December 3, 2024, prior to Design Review (see attached Site Plan Review Comment Sheet). The plans available at that time were less detailed. Please note that many comments from the SPR involve other regulations or permits that the applicant must adhere to or obtain and are not under the purview of the Planning Board. The applicant will need to coordinate with these other Town Departments who are required to sign off on their approval as part of the building permit process. 2. Design Review Committee Comments: The applicant met with the Design Review Committee (DRC) on May 6, 2026 (see attached Design Review Comment Sheet). The DRC reviews commercial projects south of Route 6 as advisory only (not mandatory) as it relates to the Architectural and Site Design Standards and advises the Planning Board. To address some DRC comments, the applicant added additional in-lot trees and additional buffer trees along Drew’s Way and in front of the building; reduced the amount of brick, leaving it to serve as wainscotting and added more shingles; and reduced the upper story bump out facing the motel to provide more setback. An outstanding item from the DRC is the need to provide 3” caliper native buffer trees every 20’ on the eastern property line to screen the rear parking lot (approximately 4 trees). The DRC questioned the proximity of the expanded building to the eastern property line and the adjacent motel, rather than relocating it to meet current setback requirements. The applicant indicated they want the existing store to remain open during construction. Relocating the building would require the closing of the store to demolish the entire building. E. FINDINGS: Based on the current available information, the following Findings are offered for consideration by the Planning Board. This section will vary depending on the discussions at the public hearing, input from the applicant and the public, and other reasons the Board may have for approving or denying the relief requested by the Special Permit. The Board has reviewed the proposed plan and submittal information with respect to the criteria set forth in Bylaw Section 103.2.2 and finds that no undue nuisance, hazard, or congestion will be created by the granting of the Special Permit for a two-dwelling unit and there will be no harm to the established or future character of the neighborhood or town. The Planning Board reached this determination and allowed the requested relief from the Zoning Bylaw given by this Decision based on the following: 1. The consolidated lots will provide more than twice the minimum lot size required for a single- family home in the B2 zoning district, resulting in no increase in residential density. 2. The housing will be located on the second floor to provide top-of-shop housing without significantly increasing the building footprint. 3. Adequate parking is provided for the two residential units in addition to the commercial use. 4. The development decreases the number of curb cuts from three to a single curb cut and provides for an organized parking lot with sufficient in-lot trees. Finally, the Board also acknowledges that all cases are decided on their own specific facts, and granting the relief outlined in this Decision does not assure future applicants of similar outcomes. Page 3 of 3 Planning Board Staff Report - Petition 119 – Becker’s Package Store March 26, 2026 F. Planner Suggestion on Special Permit Request: VOTE: On a motion made by __________ and seconded by _______________, the Planning Board voted (?-?) to grant relief for Petition #119 from Section 202.5.A2 – Use Regulation, to allow for a two-family dwelling unit to be located within a B2 zoning district at 49 & 55 Route 28 and 10 Drew’s Way, West Yarmouth, with the following conditions: 1. The three lots must be legally combined into a single lot. 2. Provide 3” caliper native buffer trees every 20’ on the eastern property line where needed to screen the rear parking lot (approximately 4 trees). ATTACHMENTS: • Public Hearing Notice • February 26, 2026 Letter from William Laverly, Joe Casali Engineering, Inc. • Special Permit Application information • Project Narrative & Stormwater Management Report, dated February 2026 • Site Plan Review Comment Sheet, dated December 3, 2024 • Design Review Comment Sheet, dated May 6, 2025 • Site Plans: All plans prepared by Joe Casali Engineering, Inc, dated November 2024, last revised February 2, 2026 o Cover Sheet o Existing Conditions & Site Prep Plan o Site & Landscape Plan o Grading & Drainage Plan o Utility Plan o Civil Details I, II & III (3 sheets) o Boundary & Topographic Survey Plan by Waterman Engineering Company, dated September 19, 2024 • Architectural Plans: All prepared by Aharonian & Associations, Inc., dated May 20, 2025 unless otherwise noted. o Material Board, dated April 18, 2025 o Proposed Basement Floor Plan o Proposed First Floor Plan o Proposed Second Floor Plan o Proposed West Elevation o Proposed East Elevation Review is:  Conceptual  Formal  Binding (404 Motels/VCOD/R.O.A.D. Project)  Non-binding (All other commercial projects) Review is by:  Planning Board  Design Review Committee DESIGN REVIEW COMMENT SHEET Meeting Date: May 6, 2025 Map: 36 Lots: 77, 78 & 79 Applicant: Huzafia Corporation Zone(s): B2/APD Site Location: 49 & 55 Route 28 & 10 Drews Way Persons Present: DCR Members Present Yarmouth Town Staff Present Guests Steve O’Neil Kathy Williams Bill Lavery, Jr., Joe Casali Engin. Chris Vincent Oscar Ramirez, Aharonian Architects Sara Porter Dick Martin DRC Review for this project started at: 4:03 PM DRC Review ended at: 5:12 PM On a motion by Steve O’Neil, seconded by Sara Porter, the Design Review Committee (DRC) voted (4-0) to adjourn the May 6, 2025 DRC meeting at 5:12 PM. Project Summary General Description: The applicant is proposing an addition to the existing commercial building to create a total of 5,074 SF of commercial space on the first floor, with a new second floor for two (2), two-bedroom residential units, along with various site improvements. Summary of Presentation: Bill Lavery and Oscar Ramirez gave an overview of the project. Mr. Lavery reviewed the site plans containing three separate parcels. The existing single story structure is on the easternmost parcel with associated parking to the west. The lots will be combined for the proposed structure with first floor expansion for a larger Becker’s Package Store and second story for two dwelling units. Site improvements include revisions to the parking for easier accessible parking along the building edge sidewalk and more pockets of landscaping in the front. Rear parking is for the residential entry. Also aware of the MassDOT future streetscape improvements and will need to file a MassDOT access permit to modify the curb cut. Drainage will be directed to a low spot in the rear of the building with pre-treatment, with a small trench and infiltration in the front. Will upgrade the existing septic system and move it to a new location. Shrubs and flowering plants will be around the building with buffer trees. Oscar Ramirez gave an overview of the architecture starting with a review of the floor plans including the new basement area for storage with a lift, utility rooms and a restroom. First floor includes expanded sales area and backroom storage area with sink for possible coffee station, and can recycling. Stairs in the rear are to the second floor where there are two 1,300 square foot 2-bedroom units. Mr. Ramirez reviewed the proposed Elevations and talked about building materials. Materials include asphalt roof shingle with colonial red metal roof on the entrance overhang, brick veneer, composite for gable ends and bump outs with areas of clapboard/shakes. Existing signage would be removed and reinstalled. DRC Questions & Discussions: Dick Martin felt the design and site plan is good and inquired about the in-lot trees. Kathy Williams noted they may be short a couple trees, as they need 1 tree per 8 spaces. Mr. Martin asked about the plans for the rear of the lot. Mr. Ramirez indicated there may be some expansion in the future, but not at this time. Mr. Martin asked about what portion of the building is being retained. Mr. Ramirez indicated about 900 sf with an addition of over 4,000 sf to the commercial space. Mr. Martin noted the buffer trees along Drews Way should match buffer tree requirements. Mr. Martin thought the building is very close to Route 28 and the side buffer and he would rather it be pushed back and meet proper setbacks on all sides and allow for buffer trees in the front. He noted there is only 8’ to the eastern sideline and the hotel is very close to the property line. Mr. Martin questioned whether the existing signage would be considered grandfathered. Mr. Martin also felt less brick and more shingles or clapboards should be used on the siding. Jim Saben also asked about what parts of the existing building are being retained. Mr. Ramirez indicated the existing sales area would be retained to keep the store open during construction in the back, keeping about 900 sf with the addition being over 4,000 sf. Mr. Saben was also concerned about the building setbacks. Mr. Ramirez indicated they would have to demolish the entire building to get the front/side setbacks. Mr. Saben asked about the grades to ensure it is pitched away from the parking lot/building. Mr. Lavery noted there is proposed drainage in place to address this but will look at an additional swale. Mr. Saben asked why there is a 2nd floor bump out in the living room to be closer to the side setback and inquired as to whether it could be eliminated. Kathy Williams indicated it was their attempt to vary the façade. Mr. Ramirez noted this bump out could be eliminated. Jim Saben also indicated he is not a big fan of the brick veneer, but likes that the building is broken up with different materials. He would prefer more cedar shingle. Steve O’Neil asked about the use for the additional commercial square footage. Mr. Ramirez indicated it would be increasing the sales areas by 2,000 sf with the remainder for storage. Mr. O’Neil thanked them for staying in town and expanding in Yarmouth. Mr. O’Neil felt the existing signage helps the building stand out. Sara Porter likes the building and has no problems with building being close to the road in the front. She likes it just the way it is. Ms. Porter asked about the means of egress from the 2nd floor. Mr. Ramirez noted the bedroom windows are emergency egress with Kathy Williams noting the building will be sprinklered. Ms. Porter would prefer brick wainscotting in the front with blue clapboards wrapped around. Mr. Ramirez noted there could be some changes to the inset areas in the front. Kathy Williams indicated they may wish to have the sewer line come out the west side with a future sewer line for easy connection to the municipal sewer and suggested coordinating sewer stub/water stub locations with the Water Department. As the site plans have changed since Site Plan Review, she also recommended coordinating with the Fire Department, and the Building Commissioner on zoning compliance and specific relief needed. If disturbing more than one acre, she indicated Stormwater Management Permit would be needed from the Conservation Commission. Review Comments In Relation To The Design Standards SITING STRATEGIES Sect. 1, Streetscape  N/A  Meets Standards, or  Discrepancies: Sect. 2, Tenant Spaces  N/A  Meets Standards, or  Discrepancies: Sect. 3, Define Street Edge  N/A  Meets Standards, or  Discrepancies: Sect. 4, Shield Large Buildings  N/A  Meets Standards, or  Discrepancies: Sect. 5, Design a 2nd Story  N/A  Meets Standards, or  Discrepancies: Sect. 6, Use Topo to Screen New Development  N/A  Meets Standards, or  Discrepancies: Sect. 7, Landscape Buffers/Screening  N/A  Meets Standards, or  Discrepancies: Meets the standard if trees are 3” caliper native species, and buffer plantings are located on the east side of the rear parking lot. Sect. 8, Parking Lot Visibility  N/A  Meets Standards, or  Discrepancies: Parking is located to the side/rear of the building with access improvements Sect. 9, Break up Large Parking Lots  N/A  Meets Standards, or  Discrepancies: Appears to need additional in-lot trees, coordinate with the Building Commissioner. Sect. 10, Locate Utilities Underground  N/A  Meets Standards, or  Discrepancies: Will need to coordinate with the Utility Company regarding location of existing utility pole and investigate under grounding the utilities. Sect. 11, Shield Loading Areas  N/A  Meets Standards, or  Discrepancies: Loading area in rear of property and screened. Provide solid wood dumpster enclosure. BUILDING STRATEGIES: Sect. 1, Break Down Building Mass – Multiple Bldgs.  N/A  Meets Standards, or  Discrepancies: Sect. 2, Break Down Building Mass – Sub-Masses  N/A  Meets Standards, or  Discrepancies: Sect. 3, Vary Façade Lines  N/A  Meets Standards, or  Discrepancies: Facades of greater than 50’ without modulation, but upper level is setback creating variation in the west elevation façade line, and there is a small bump out on the east elevation. DRC is supportive of eliminating the small bump out on the east elevation to provide more side setback. Sect. 4, Vary Wall Heights  N/A  Meets Standards, or  Discrepancies: Sect. 5, Vary Roof Lines  N/A  Meets Standards, or  Discrepancies: Sect. 6, Bring Down Building Edges  N/A  Meets Standards, or  Discrepancies: Sect. 7, Vary Building Mat’ls For Depth  N/A  Meets Standards, or  Discrepancies: Suggested modifications along the Route 28 façade to include a brick wainscotting with composite blue shakes Sect. 8, Use Traditional & Nat’l. Building Mat’ls  N/A  Meets Standards, or  Discrepancies: Sect. 9, Incorporate Pedestrian-scaled Features  N/A  Meets Standards, or  Discrepancies: Sect. 10, Incorporate Energy-efficient Design  N/A  Meets Standards, or  Discrepancies: Considering roof mounted solar. Next step for applicant:  Coordinate with Staff on SPR Comments  Return to Design Review for Formal Review On a motion by Jim Saben, seconded by Steve O’Neil, the Design Review Committee (DRC) voted (4-0) to approve these DRC Comments as meeting minutes for the May 6, 2025 DRC meeting for the proposed mixed- use development at 49 & 55 Route 28 & 10 Drews Way, West Yarmouth. Received by Applicant(s) William M. Lavery, Jr. ATTACHMENTS: • May 6 DRC Agenda • DRC Application: o DRC Application and Materials Specification Sheet o Site Plans: All plans prepared by Joe Casali Engineering Inc, dated April 2025:  Cover Sheet  Existing Conditions & Site Prep Plan  Site & Landscape Plan  Grading & Drainage Plan  Drainage Details  Civil Details I  Civil Details II o Architectural Plans: Prepared by Aharonian & Associates Architects, dated XXX:  Material Board, dated April 18, 2025  Proposed Elevations (2 sheets), dated March 7, 2025  A1.0 – Proposed Basement Plan, dated January 4, 2021  A1.1 – Proposed First Floor Plan, last revised March 10, 2025  A1.2 – Proposed Second Floor Plan, dated January 4, 2021 SHEET DESIGNED BY:WMLJR DRAWN BY: SEK/SD CHECKED BY: JAC DATE:NOV. 2024 PROJECT NO: 19-19v REVISIONS: NO. DATE. DESCRIPTION 1 4/2025 DESIGN REVIEW 2 2/5/2026 PERMIT SET BE C K E R ' S P A C K A G E S T O R E 55 R O U T E 2 8 WE S T Y A R M O U T H , M A S S A C H U S E T T S AP 3 6 , L O T S 7 7 , 7 8 & 7 9 OF 8Q: \ 1 9 - 1 9 A h a r o n i a n & A s s o c i a t e s \ 1 9 - 1 9 v B e c k e r s P a c k a g e S t o r e \ A C A D \ B e c k e r ' s P a c k a g e S t o r e [ W o r k i n g P l a n ] - R 3 . d w g F e b . 2 4 , 2 0 2 6 1 1 : 4 5 a m PRELIMINARY, NOT FOR CONSTRUCTION JC E JC E JO E C A S A L I E N G I N E E R I N G , I n c . Ci v i l ∙ S i t e D e v e l o p m e n t ∙ T r a n s p o r t a t i o n Dr a i n a g e ∙ W e t l a n d s ∙ I S D S ∙ T r a f f i c ∙ F l o o d p l a i n 30 0 P o s t R o a d , W a r w i c k , R I 0 2 8 8 8  0       3 0 0  0       3  3 F A ; W W W . J O E C A S A L I . C O 0 COVER SHEET 1 SITE SITE IMPROVEMENT PLANS FOR BECKER'S PACKAGE STORE A PROPOSED MIXED-USE BUILDING CONSISTING OF ONE EXISTING COMMERCIAL UNIT & TWO NEW RESIDENTIAL UNITS 55 ROUTE 28 WEST YARMOUTH, MASSACHUSETTS AP 36, LOTS 77 - 79 ZONING DISTRICT: B2 BUSINESS ZONE & AQUIFER PROTECTION OVERLAY DISTRICT (APD) PROJECT TEAM INDEX OF DRAWINGS SHEET NO. PLAN 1 COVER SHEET 2 EXISTING CONDITIONS & SITE PREP. PLAN 3 SITE & LANDSCAPE PLAN 4 GRADING & DRAINAGE PLAN 5 UTILITY PLAN 6 CIVIL DETAILS I 7 CIVIL DETAILS II 8 CIVIL DETAILS III REFERENCE PLANS: SHEET 1 OF 1 SURVEY PLAN, PREPARED BY WATERMAN ENGINEERING OWNER:HUZAFIA CORPORATION 59 ANCHOR LANE COTUIT, MA 02635 ARCHITECT: AHARONIAN & ASSOCIATES, INC 310 GEORGE WASHINGTON HWY SMITHFIELD, RI 02917 PHONE: (401) 232-5010 CIVIL JOE CASALI ENGINEERING, INC. ENGINEER:300 POST ROAD WARWICK, RI 02888 PHONE: 401-944-1300 FAX: 401-944-1313 JOECASALI.COM LAND WATERMAN ENGINEERING CO. SURVEYOR:40 SUTTON AVENUE EAST PROVIDENCE, RI 02914 PHONE: 401-438-5775 STATE WIDE MAP WEST YARMOUTH, MA LOCUS MAP SCALE: 1' = 2,000'N SUBMISSIONS: PLANNING BOARD FOR SPECIAL PERMIT (USE) ZONING BOARD OF APPEALS (ZBA) SPECIAL PERMIT FOR NON-CONFORMING STRUCTURE WITH RELIEF APPROVALS: HISTORIC COMMISSION MEETING (JULY 30, 2025) DESIGN REVIEW COMMITTEE: FORMAL REVIEW (MAY 6, 2025) SITE PLAN REVIEW: FORMAL REVIEW (DECEMBER 3, 2024) RENDERING BY AHARONIAN & ASSOCIATES, INC. X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X E M WV GV S 01°19'37" W 155.73' N 01°18'20" E 511.62'140.00' 131.62' 240.00' N 7 8 ° 5 2 ' 0 5 " E 9 9 . 6 3 ' MAP 36, LOT 82.1 N/F KISHOR K. PATEL VOLUME 12505, PAGE 226 (COMMERCIAL USE; ZONE B2) N 7 8 ° 5 9 ' 3 3 " E 9 9 . 5 8 ' ( 1 0 0 ' ~ D E E D ) (100' ~ DEED) S 01°18'20" W 99.70' CONCRETE BOUND(FND ~ DESTROYED) CONCRETEBOUND (FND)CONCRETEBOUND(FND) CONCRETE BOUNDW/ METAL DISK (FND) ( 1 0 0 ' ~ D E E D ) CONCRETEBOUND (FND) S 01°07'27" W 189.80'S 00°23'57" W 187.75' S 00°56'53" W 365.55' N 7 8 ° 5 9 ' 3 3 " E 2 9 8 . 0 9 ' ( M E A S U R E D ) MASS. HWY. BOUND N 7 8 ° 5 9 ' 3 3 " E 8 0 . 1 4 ' MAP 36, LOT 82.2.1 N/F JOAO SILVA VOLUME 31220, PAGE 309 (RESIDENTIAL USE; ZONE B2) MH WV DREW'S WAY (PRIVATE RIGHT OF WAY ~ 12' WIDTH) 2 STY. ECONOLODGE MOTEL No. 59 MAP 36, LOT 76 N/F DIPTI LLC VOLUME 27426, PAGE 307 (COMMERCIAL USE; ZONE B2) MAP 36, LOT 71 N/F ROSEANN KELLEHER VOLUME 21626, PAGE 104 (RESIDENTIAL USE; ZONE B1) MAP 36, LOT 82.2.2 N/F HUGH VARDAN & JOHN MOYLAN VOLUME 29158, PAGE 71 (RESIDENTIAL USE; ZONE B2) 1 9 3 3 S T A T E H I G H A W Y ~ L O 2 9 7 7 2 2 21 22 21 20 19 18 17 1 6 21 20 20 19 19 2 5 24 23 23 23 23 22 21 OHW OHW OHW OHW GM 1. 4 ' 25 2 4 24 23 23 2 2 22 21 20 19 12.4' GV GV DD D D D W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W G G G G G G G G G G G G G G W W W W W W G G W W T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T OHW OHW OHW OHW OHW OHW N 01°18'20" E 99.92' (100' ~ DEED) O H W O H W O H W O H W O H W O H W O H W O H W O H W O H W O H W OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW GM BH HEDGES COLUMN GUY GASMETER ELEC.METER GASMETER CHAIN LINK FENCE ACUNIT ACUNIT ACUNIT ICE 18 17 1 9 1 8 1 8 1 8 19 1 9 1 8 1 9 BOLLARDS BIT. PAVED DRIVEWAY "DREW'S WAY"SIGN BIT. PAVED PARKING AREA O V E R H E A D W I R E S ( T Y P . ) 5/8" WATER S E R . 2" WATER G G G G G G G G G G G G G G G G G G G GAPPROXIMATE 2" PE GAS MAIN 6 " P E G A S M A I N WOOD GUARD RAIL C.O. OVERHANG BIT. PAVEMENT C O N C . W A L K C O N C . W A L K BIT. PAVED DRIVEWAY "BECKER'S PACKAGE STORE" 1 STY. W/F & MASONRY BUILDINGNo. 55 (ROUTE 28) LAWN MAP 36, LOT 79 51,026 S.F. (1.171 AC.) MAP 36, LOT 78 9,711 S.F. (0.223 AC.) MAP 36, LOT 77 37,669 S.F. (0.865 AC.) S 00°51'57" W 98.35' APPROXIMATE SEPTIC SYSTEM APPROX. 1/2" GAS S E R . UTILITYPOLE (TYP.)(DENSE WOODS / BRUSH) (DENSE WOODS / BRUSH) EDGE OF PAVEMENT EDGE OF PAVEMENT WOOD FENCE VINYL FENCE G R A N I T E C U R B I N G ( T Y P . ) MAG-NAIL(FND) O H W O H W O H W O H W R O U T E 2 8 - M A I N S T R E E T ( S T A T E H I G H W A Y L A Y O U T 2 9 7 7 & 6 2 3 7 ) 12 ' A P P R O X . T E L E C O M D U C T ( T Y P . ) A P P R O X . 8 " W A T E R M A I N A P P R O X . 1 6 " W A T E R M A I N 2 STY. "RELAX INN" No. 41 METERPIT 2 0 Z O N E B 1 Z O N E B 2 ZONE B1 ZONE B2 LOD LOD LOD LOD LOD LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD L O D L O D L O D L O D L O D LOD L O D L O D L O D LODL O D L O D L O D L O D L O D L O D L O D L O D LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD L O D L O D L O D LO D LO D LO D LO D LO D S 8 6 ° 4 2 ' 3 7 " W 8 0 . 6 0 ' 30' FRONT YA R D SETBACK 25 ' S I D E Y A R D SE T B A C K TH-3 & 4 (DRAINAGE)REMOVE AND DISPOSE EXISTING SYSTEM IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL LAW. EMPTY SYSTEM OF ALL CONTENTS, CRUSH AND FILL WITH COMMON BORROW PLACES IN 12" THICK LOOSE LIFTS COMPACTED TO 92% MODIFIED PROCTOR. REFER TO UTILITY PLAN FOR PROPOSED SEPTIC SYSTEM DESIGN. PLEASE ALSO NOTE THAT PROJECT WILL EVENTUALLY BE CONNECTED TO PUBLIC SEWER (SEE GENERAL NOTE 7). REMOVE AND DISPOSE EXISTING PAVEMENT (TYP.) PORTION OF EXISTING BUILDING TO BE RAZED; REFER TO ARCHITECTURAL PLAN FOR DETAILS REMOVE & DISPOSE EXISTING CURB REMOVE & DISPOSE EXISTING BOLLARDS INTERIOR LOT LINES TO BE ABANDONED; LOTS TO BE COMBINED PER ZONING BYLAW §104.3.5(5) AS AN 81X PERIMETER PLAN REMOVE AND DISPOSE EXISTING UTILITY POLE AND ASSOCIATED OVERHEAD WIRES; COORDINATION WITH UTILITY COMPANY REQUIRED REMOVE AND RELOCATE "DREW'S WAY SIGN; SEE SITE PLAN CLEAR AND GRUB (TYP.) BUILDING SETBACKS SHOWN FOR FUTURE COMBINED LOTS VIA ZONING BYLAW §104.3.5(5) AS AN 81X PERIMETER PLAN BENCHMARK: NAIL (SET) IN UTILITY POLE ELEV: 20.76' (NAVD 88) 30 ' F R O N T Y A R D SE T B A C K PROPOSED TREE LINE (TYP.) TH-1 & TH-2 (SEPTIC) SHEET DESIGNED BY: WMLJR DRAWN BY: SEK/SD CHECKED BY: JAC DATE:NOV. 2024 PROJECT NO: 19-19v REVISIONS: NO. DATE. DESCRIPTION 1 4/2025 DESIGN REVIEW 2 2/5/2026 PERMIT SET BE C K E R ' S P A C K A G E S T O R E 55 R O U T E 2 8 WE S T Y A R M O U T H , M A S S A C H U S E T T S AP 3 6 , L O T S 7 7 , 7 8 & 7 9 OF 8Q: \ 1 9 - 1 9 A h a r o n i a n & A s s o c i a t e s \ 1 9 - 1 9 v B e c k e r s P a c k a g e S t o r e \ A C A D \ B e c k e r ' s P a c k a g e S t o r e [ W o r k i n g P l a n ] - R 3 . d w g F e b . 2 4 , 2 0 2 6 1 1 : 4 5 a m PRELIMINARY, NOT FOR CONSTRUCTION JC E JC E JO E C A S A L I E N G I N E E R I N G , I n c . Ci v i l ∙ S i t e D e v e l o p m e n t ∙ T r a n s p o r t a t i o n Dr a i n a g e ∙ W e t l a n d s ∙ I S D S ∙ T r a f f i c ∙ F l o o d p l a i n 30 0 P o s t R o a d , W a r w i c k , R I 0 2 8 8 8  0       3 0 0  0       3  3 F A ; W W W . J O E C A S A L I . C O 0 EXISTINGCONDITIONS &SITE PREP.PLAN 2 SCALE (FEET) 0 1 INCH = FT 10 20 40 80 201-888-344-7233 1-888-DIG-SAFETO ANY EXCAVATION CALL DIGSAFE AT: BE DONE BY THE APPROPRIATE UTILITY COMPANY OR MUNICIPALITY PRIOR EXISTING DOCUMENTATION AND MAY NOT BE ACCURATE. EXACT LOCATION TO LOCATION OF EXISTING UTILITIES SHOWN, ARE FROM GATE LOCATION AND WORKING DAYS NOTICE PROTECT YOURSELF, GIVE THREE MA. MAINLAND (NAD 83) LEGEND: UP#T2 ABUTTING PROPERTY LINE PROPOSED CONTOUR EXISTING CONTOUR EXISTING UTILITY POLE EXISTING PROPERTY LINE 100 100 PROPOSED DRAINAGE MANHOLED EXISTING CATCH BASIN BUILDING SETBACK LINE EXISTING CURB PROPOSED CURB EXISTING METAL FENCE EXISTING DRAIN LINEDDD PROPOSED DRAIN LINEDDD EXISTING DRAINAGE MANHOLED PROPOSED CATCH BASIN PROPOSED UTILITY POLE EXISTING TELECOM DUCTBANKTELTEL EXISTING ELECTRIC DUCTBANKEEE PROPOSED GAS LINEGASGAS CHAIN LINK FENCE WETLAND EDGE WETLAND FLAGWF FDC H/C WG EXISTING SEWER LINE TEST HOLE EXISTING SEWER MANHOLE S S S S NOW OR FORMERLYN/F TREELINE LIMIT OF DISTURBANCELODLOD EXISTING WATER LINEWWW WATER GATE SILT FENCE PROPOSED WATER LINEWWW WV PROPOSED SEWER LINESSS PROPOSED SEWER MANHOLES EXISTING TREE BOLLARD HYDRANT LAMP POLE FIRE DEPTMENT CONTROL EXISTING HANDICAP PROPOSED HANDICAP WATER VALVE ZONING CRITERIA ZONING DISTRICT MINIMUM LOT AREA MINIMUM FRONTAGE MINIMUM FRONT YARD MINIMUM SIDE YARD MINIMUM REAR YARD MAXIMUM BUILDING COVERAGE (%) MAXIMUM IMPERVIOUS COVERAGE (%) SHAPE FACTOR1 REQUIRED B-2 20,000 SF 125 FT 30 FT 25 FT 20 FT 25% 70% 22 EXISTING LOT 77 GENERAL NOTES: 1. THIS PLAN IS BASED ON A OCTOBER 2024 BOUNDARY & TOPOGRAPHIC SURVEY PLAN PREPARED BY WATERMAN ENGINEERING CO. 2. THE LOCATION AND DEPTH OF EXISTING UTILITIES ARE APPROXIMATE AND HAVE BEEN PLOTTED FROM THE LATEST AVAILABLE INFORMATION. THE UTILITY LOCATIONS ARE APPROXIMATE AND MAY NOT BE ALL INCLUSIVE. THE CONTRACTOR SHALL CHECK AND VERIFY THE LOCATIONS OF ALL EXISTING UTILITIES, BOTH OVERHEAD AND UNDERGROUND, AND "DIG-SAFE" MUST BE NOTIFIED PRIOR TO COMMENCING ANY CONSTRUCTION OPERATIONS. RESTORATION AND REPAIR OF DAMAGE TO EXISTING UTILITIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR WITH NO ADDITIONAL COST THE OWNER. NO EXCAVATION SHALL COMMENCE UNTIL ALL INVOLVED UTILITY COMPANIES AND/OR CITY WHOSE FACILITIES MIGHT BE AFFECTED BY ANY WORK TO BE PERFORMED BY THE CONTRACTOR ARE NOTIFIED AT LEAST 72 HOURS IN ADVANCE. 3. THIS SITE LIES IN ZONE X (AREAS DETERMINED TO BE OUTSIDE OF THE 0.2% ANNUAL CHANCE FLOOD), AS SHOWN ON THE FIRM MAP FOR BARNSTABLE COUNTY, MASSACHUSETTS (ALL JURISDICTIONS) PANEL 567 OF 875, TOWN OF YARMOUTH, MAP NUMBERS 25001C0567K, EFFECTIVE DATE: JULY 16, 2014. 4. SOILS EXISTING ON THE SITE CONSIST ENTIRELY OF CARVER COARSE SAND, 3-8% SLOPES (252B). 5. THESE PREMISES MAY BE SUBJECT TO THE FOLLOWING EASEMENTS, RIGHTS OF WAY OR AGREEMENTS OF RECORD: ·RIGHTS AND RIGHTS OF OTHERS IN, TO AND ACROSS THAT 12' WIDE PRIVATE RIGHT OF WAY KNOWN AS "DREW'S WAY" AS DESCRIBED IN VOLUME 460, PAGE 431 & VOLUME 456, PAGE 25 ·EASEMENTS MAY EXIST FOR THE UTILITY POLES & OVERHEAD WIRES AS SHOWN (NO RECORDS FOUND) 6. WATER, GAS, AND TELECOMMUNICATIONS ARE AVAILABLE TO THE PROJECT SITE VIA MAIN STREET. ELECTRIC SERVICES ARE AVAILABLE VIA OVERHEAD LINES ALONG MAIN STREET. SEWER IS NOT CURRENTLY AVAILABLE TO THE PROJECT SITE. 7. THESE PROPERTIES ARE IN THE PROCESS OF OBTAINING SEWER CONNECTIONS AS SHOWN WITHIN "PHASE 1 - CONTRACT NO. 6" OF THE TOWN OF YARMOUTH, MASSACHUSETTS PROPOSED WASTEWATER COLLECTION AND WATER RESOURCE RECOVERY FACILITIES PROJECT, PROJECT NO. CWSRF - 8349/6 , AUGUST, 2024, AS SHOWN ON THE PROPOSED SEWER DESIGN PLANS CURRENTLY UNDER REVIEW WITH THE TOWN OF YARMOUTH. B-2 37,669 SF 80.14 FT2 12.4 FT2 1.4 FT2 >20 FT 8% 16.5% 22 EXISTING LOT 78 B-2 9,711 SF2 99.58 FT2 N/A N/A N/A N/A 69% 16.4 EXISTING LOT 79 B-2 51,026 SF N/A N/A N/A N/A N/A 12.6% 29.8 NOTES: 1. SHAPE FACTOR SHALL BE OBTAINED BY DIVIDING THE SQUARE OF THE LOT PERIMETER (P), MEASURED IN FEET, BY THE AREA OF THE LOT (A), MEASURED IN SQUARE FEET (I.E. P2 ÷ A). 2. PRE-EXISTING, NON-CONFORMING CONDITION EXISTING LOTS 77-79 B-2 98,406 SF 179.72 FT 12.4 FT2 1.4 FT2 >20 FT 3% 19.7% 26.1 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X E M WV GV MAP 36, LOT 82.1 N/F KISHOR K. PATEL VOLUME 12505, PAGE 226 (COMMERCIAL USE; ZONE B2) S 8 6 ° 4 2 ' 3 7 " W 8 0 . 6 0 ' MASS. HWY. BOUND MAP 36, LOT 82.2.1 N/F JOAO SILVA VOLUME 31220, PAGE 309 (RESIDENTIAL USE; ZONE B2) MH WV DREW'S WAY (PRIVATE RIGHT OF WAY ~ 12' WIDTH) 2 STY. ECONOLODGE MOTEL No. 59 MAP 36, LOT 76 N/F DIPTI LLC VOLUME 27426, PAGE 307 (COMMERCIAL USE; ZONE B2) MAP 36, LOT 71 N/F ROSEANN KELLEHER VOLUME 21626, PAGE 104 (RESIDENTIAL USE; ZONE B1) MAP 36, LOT 82.2.2 N/F HUGH VARDAN & JOHN MOYLAN VOLUME 29158, PAGE 71 (RESIDENTIAL USE; ZONE B2) 1 9 3 3 S T A T E H I G H A W Y ~ L O 2 9 7 7 OHW OHW OHW OHW GM GV GV DD D D D W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W G G G G G G G G G G G G G G W W W W W W G G W W T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T OHW OHW OHW OHW OHW OHW O H W O H W O H W O H W O H W O H W O H W O H W O H W O H W O H W OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW GM BH HEDGES COLUMN GUY GASMETER ELEC.METER GASMETER CHAIN LINK FENCE ACUNIT ACUNIT BIT. PAVED DRIVEWAY O V E R H E A D W I R E S ( T Y P . ) 5/8" WATER S E R . 2" WATER G G G G G G G G G G G G G G G G G G G GAPPROXIMATE 2" PE GAS MAIN 6 " P E G A S M A I N C O N C . W A L K C O N C . W A L K BIT. PAVED DRIVEWAY LAWN APPROX. 1/2" GAS S E R . UTILITYPOLE (TYP.) (DENSE WOODS / BRUSH) EDGE OF PAVEMENT EDGE OF PAVEMENT WOOD FENCE VINYL FENCE G R A N I T E C U R B I N G ( T Y P . ) R O U T E 2 8 - M A I N S T R E E T ( S T A T E H I G H W A Y L A Y O U T 2 9 7 7 & 6 2 3 7 ) 12 ' A P P R O X . T E L E C O M D U C T ( T Y P . ) A P P R O X . 8 " W A T E R M A I N A P P R O X . 1 6 " W A T E R M A I N 2 STY. "RELAX INN" No. 41 METERPIT 20 ' ( T Y P . ) 24 ' ( T Y P . ) 20 ' ( T Y P . ) ±103' (REFER TO ARCHITECTURAL PLAN) ±4 7 . 5 ' Z O N E B 1 Z O N E B 2 ZONE B1 ZONE B2 D 3 5 3 ACCESS TO RESIDENTIAL STAIRWELL ACCESS TO BASEMENT STAIRWELL PROPOSED 2ND FLOOR (2 RESIDENTIAL UNITS) TOTAL AREA: 2,849 SF LIMITS OF 2ND FLOOR "BECKER'S PACKAGE STORE" FIRST FLOOR EXISTING: 935 SF ADDITION: 4,180 SF TOTAL AREA: 5,115 SF BASEMENT EXISTING: 95 SF ADDITION: 4,079 SF TOTAL AREA: 4,174 SF MAIN ENTRANCE (REFER TO ARCHITECTURAL PLAN) LOADING ZONE PROPOSED CONCRETE CURB (SEE DETAIL - TYP.) PROPOSED BITUMINOUS CONCRETE PAVEMENT (TYP.) PROPOSED 5'x5' CEMENT CONCRETE LANDING (TYP.) PROPOSED CEMENT CONCRETE SIDEWALK (SEE DETAIL) PROPOSED STREET TREES (TYP.) SPECIFIC PLANTINGS TO BE COORDINATED WITH MASSDOT PROPOSED (7) EVERGREEN BUFFER PLANTINGS, JUNIPERUS VIRGINIANA, EASTERN RED CEDAR, SPACED 20-FT O.C., 3" CALIPER PROPOSED LANDSCAPED AREA LOAM AND SEED ALL DISTURBED AREAS (TYP.) LIMITS OF STORMWATER MANAGEMENT AREA PROPOSED DUMPSTER CONCRETE PAD WITH SOLID WOOD ENCLOSURE (TYP. - SEE DETAIL) STORMWATER MANAGEMENT AREA (TYP.) PROPOSED HANDICAP PARKING SYMBOL AND STRIPING (TYP - SEE DETAIL) 4" WHITE EPOXY PAVEMENT MARKING (TYP.) PROPOSED WHEELCHAIR RAMP WITH DETECTABLE WARNING PANEL (TYP.) (E 107.2.0 & E 107.6.5) 4" WHITE EPOXY PAVEMENT MARKING (TYP.) PROPOSED CONCRETE CURB (SEE DETAIL - TYP.) 7 20' MIN. LANDSCAPED BUFFER S 01°19'37" W 155.73' S 01°07'27" W 189.80'S 00°23'57" W 187.75' S 00°51'57" W 98.35' N 01°18'20" E 611.54' 12.3' 7. 5 ' 4 5 S LIMITS OF PROPOSED ON-SITE WASTEWATER TREATMENT SYSTEM PROPOSED CONCRETE CURB FLUSH WITH ASPHALT (SEE DETAIL - TYP.) 12'12.9' 9' 5' PARKING COUNT; DO NOT PAINT (TYP.) RELOCATED STREET SIGN (TYP.) FUTURE ROADWAY IMPROVEMENTS CONSISTING OF BIKE LANES AND GRASS STRIPS BASED ON PENDING MASSDOT CORRIDOR PROJECT (TYP.) 3 10'8'7'10'8'8'8'10'10'27.72'10'24'20'24' 33 . 7 5 ' 12 ' PROPOSED (4) AMELANCHIER ARBOREA, DOWNY SERVICEBERRY, SPACED 20-FT O.C., 2.5" CALIPER N 7 8 ° 5 9 ' 3 3 " E 1 7 9 . 7 2 ' VARIOUS SHRUB AND FLOWERING PLANTINGS (TYP.) R 3 ' ( T Y P . ) R5' R5 ' 25.55' SHEET DESIGNED BY: WMLJR DRAWN BY: SEK/SD CHECKED BY: JAC DATE:NOV. 2024 PROJECT NO: 19-19v REVISIONS: NO. DATE. DESCRIPTION 1 4/2025 DESIGN REVIEW 2 2/5/2026 PERMIT SET BE C K E R ' S P A C K A G E S T O R E 55 R O U T E 2 8 WE S T Y A R M O U T H , M A S S A C H U S E T T S AP 3 6 , L O T S 7 7 , 7 8 & 7 9 OF 8Q: \ 1 9 - 1 9 A h a r o n i a n & A s s o c i a t e s \ 1 9 - 1 9 v B e c k e r s P a c k a g e S t o r e \ A C A D \ B e c k e r ' s P a c k a g e S t o r e [ W o r k i n g P l a n ] - R 3 . d w g F e b . 2 4 , 2 0 2 6 1 1 : 4 5 a m PRELIMINARY, NOT FOR CONSTRUCTION JC E JC E JO E C A S A L I E N G I N E E R I N G , I n c . Ci v i l ∙ S i t e D e v e l o p m e n t ∙ T r a n s p o r t a t i o n Dr a i n a g e ∙ W e t l a n d s ∙ I S D S ∙ T r a f f i c ∙ F l o o d p l a i n 30 0 P o s t R o a d , W a r w i c k , R I 0 2 8 8 8  0       3 0 0  0       3  3 F A ; W W W . J O E C A S A L I . C O 0 SITE& LANDSCAPEPLAN 3 SCALE (FEET) 0 1 INCH = FT 10 20 40 80 20 MA. MAINLAND (NAD 83) PARKING CALCULATION Per Town of Yarmouth Zoning Bylaw, Section 301.5 Table of Parking Demand: USE: MERCANTILE REQUIRED: 1 SPACE PER 7 OCCUPANTS 50 OCCUPANTS * (1 SPACE / 7 OCCUPANTS) = 7.14 SPACES USE: RESIDENTIAL, 1 & 2 FAMILY REQUIRED: 2 SPACES/UNIT 2 UNITS * (2 SPACES / UNIT) = 4 SPACES TOTAL PARKING SPACES REQUIRED = 12 SPACES PARKING SPACES PROPOSED = 30 SPACES ADA ACCESSIBLE PARKING SPACES REQUIRED: 2 SPACE ADA ACCESSIBLE PARKING SPACES PROPOSED: 2 SPACE TOWN OF YARMOUTH ZONING BYLAWS SECTION 104.3.2(3): A. OTHER LAWFULLY PRE-EXISTING, NON-CONFORMING STRUCTURES MAY BE ALTERED, EXTENDED, RAZED AND REPLACED BY SPECIAL PERMIT FROM THE BOARD OF APPEALS IF IT IS DETERMINED THAT: 1. CONFORMS TO THE CURRENT DIMENSIONAL REQUIREMENTS OF THE BYLAW OR DOES NOT INCREASE THE EXISTING NON-CONFORMING NATURE OF THE STRUCTURE, OR; 2. WILL NOT BE SUBSTANTIALLY MORE DETRIMENTAL TO THE NEIGHBORHOOD, ZONING DISTRICT, OR TOWN B. THE EXTENSION, ALTERATION, OR RAZE AND REPLACEMENT WILL NOT CAUSE OR CONTRIBUTE TO ANY UNDUE NUISANCE, HAZARD OR CONGESTION, AND; C. STRICT ENFORCEMENT OF THE CURRENT BYLAWS WOULD RESULT IN UNDUE HARDSHIP TO THE PROPERTY OR ITS OWNER SPECIAL PERMIT REQUESTED WITH VARIANCE TO EXTEND/MAINTAIN THE EXISTING NON-CONFORMING NATURE OF THE EXISTING BUILDING (SIDE YARD & FRONT YARD) SPECIAL PERMIT REQUESTED TO ALLOW A DUPLEX WITHIN THE B2 ZONING DISTRICT 1 ZONING CRITERIA ZONING DISTRICT MINIMUM LOT AREA MINIMUM FRONTAGE MINIMUM FRONT YARD MINIMUM SIDE YARD MINIMUM REAR YARD MAXIMUM BUILDING COVERAGE (%) MAXIMUM IMPERVIOUS COVERAGE (%) SHAPE FACTOR1 REQUIRED B-2 20,000 SF 125 FT 30 FT 25 FT 20 FT 25% 70% 22 EXISTING LOT 77 B-2 37,669 SF 80.14 FT2 12.4 FT2 1.4 FT2 N/A 8% 16.5% 22 EXISTING LOT 78 B-2 9,711 SF2 99.58 FT2 N/A N/A N/A N/A 69% 16.4 EXISTING LOT 79 B-2 51,026 SF N/A N/A N/A N/A N/A 12.6% 29.8 NOTES: 1. SHAPE FACTOR SHALL BE OBTAINED BY DIVIDING THE SQUARE OF THE LOT PERIMETER (P), MEASURED IN FEET, BY THE AREA OF THE LOT (A), MEASURED IN SQUARE FEET (I.E. P2 ÷ A). 2. PRE-EXISTING, NON-CONFORMING CONDITION 3. RELIEF REQUESTED TO EXTEND A PRE-EXISTING, NON-CONFORMING CONDITION 4. CORNER LOTS ARE CONSIDERED TO HAVE TWO FRONT YARD SETBACKS AND TWO SIDE YARD SETBACKS. THE FRONT YARD SETBACK FOR CORNER LOTS MAY BE REDUCED TO 25' TO ACCOMMODATE PARKING IN THE REAR OR SIDE OF THE BUILDING. EXISTING LOTS 77-79 B-2 98,406 SF 179.72 FT 12.4 FT2 1.4 FT2 N/A 3% 19.7% 26.1 PROPOSED LOTS 77-79 B-2 98,406 SF 179.72 FT 12.3 FT2 7.5 FT3 N/A 5.2% 25.6% 26.1 2 LANDSCAPE NOTES: 1.GUARANTEE THAT, UPON COMPLETION AND FINAL ACCEPTANCE, LANDSCAPE PLANTINGS CONFORM TO REQUIREMENTS OF CONTRACT DOCUMENTS. PROVIDE A WARRANTY FOR TREE PLANTINGS FOR A MINIMUM OF TWO (2) YEARS, INCLUDING TWO (2) CONTINUOUS GROWING SEASONS. COMMENCE WARRANTY ON DATE IDENTIFIED IN THE 'CERTIFICATE OF FINAL COMPLETION'. 2. REPLACEMENTS: PLANTS OF SAME SIZE AND SPECIES AS SPECIFIED, PLANTED IN THE NEXT GROWING SEASON, WITH NEW WARRANTY AND EXTENDED MAINTENANCE SERVICE COMMENCING ON THE DATE OF REPLACEMENT. 3. PLANT MATERIALS SHALL BE OF SIZE AND CALIPER REQUIRED AND CONFORM TO THE REQUIREMENTS DESCRIBED IN THE LATEST EDITION OF AMERICAN STANDARD FOR NURSERY STOCK, PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN. 4. PLANTS OF OTHER KINDS THAN THOSE NAMED IN THE PLANT SCHEDULE SHALL NOT BE ACCEPTED WITHOUT APPROVAL. REPLACEMENT PLANTS LARGER IN SIZE THAN EXISTING MAY BE USED IF APPROVED BY THE A/E, PROVIDED USE OF LARGER PLANTS DOES NOT INCREASE CONTRACT PRICE. 5. A PROFESSIONAL HORTICULTURIST/NURSERYMAN SHALL BE CONSULTED TO DETERMINE THE PROPER TIME TO MOVE AND INSTALL PLANT MATERIAL SO THAT STRESS TO THE PLANT IS MINIMIZED. PLANTING OF DECIDUOUS MATERIAL MAY BE CONTINUED DURING WINTER MONTHS PROVIDED THERE IS NO FROST IN THE GROUND AND FROST-FREE TOPSOIL PLANTING MIXTURES ARE USED. 6. UNLESS OTHERWISE APPROVED BY THE A/E, ALL PLANTS SHALL BE NURSERY GROWN IN ACCORDANCE WITH GOOD HORTICULTURAL PRACTICES AND SHALL HAVE BEEN GROWN UNDER CLIMATIC CONDITIONS SIMILAR TO THOSE IN THE LOCALITY OF THE PROJECT FOR AT LEAST TWO (2) YEARS. 7. SET PLANTS PLUMB AND AT SUCH A LEVEL THAT AFTER SETTLEMENT THEY BEAR THE SAME RELATION TO THE SURROUNDING GROUND AS THEY BORE TO THE GROUND FROM WHICH THEY WERE DUG. SETTLE BACKFILL MATERIAL FOR PLANTS, THOROUGHLY & PROPERLY, BY FIRMING OR TAMPING. ACCOMPANY BACKFILLING WITH THOROUGH WATERING UNLESS OTHERWISE APPROVED. FORM SAUCER CAPABLE OF HOLDING WATER AROUND INDIVIDUAL PLANTS. 8. FERTILIZE SHRUB BEDS WITH 10-6-4 FERTILIZER AT THE RATE OF 3 POUNDS PER 100 SQUARE FEET OF SURFACE AREA, BROAD CAST. APPLY THE FERTILIZER UNIFORMLY TO THE SURFACE BEDS AND WORK INTO THE UPPER TWO (2) INCHES OF SOIL. FERTILIZE INDIVIDUAL TREES AT THE RATE OF ONE (1) AGRIFORM PELLET PER INCH OF TREE DIAMETER (FOLLOW MANUFACTURER'S WRITTEN INSTRUCTIONS). APPLY A SECOND APPLICATION OF FERTILIZER TO ALL PLANT ITEMS AT THE SAME SPECIFIED RATES OVER THE MULCH AT THE END OF AN EIGHT WEEK PERIOD. 9. CONTAINER GROWN MATERIALS: REMOVE PLANT FROM CONTAINER AND "BUTTERFLY" ROOT BALL OR OTHERWISE SPREAD OUT ROOTS ON SETTING MOUND. BACKFILL SHALL BE SIFTED THROUGH THEM AND SOLIDLY FIRMED. 10. AFTER PLANTING PRUNE ONLY BROKEN OR DEFORMED BRANCHES AND IN SUCH MANNER AS TO PRESERVE NATURAL CHARACTER OF PLANT. 11. IMMEDIATELY AFTER PLANTING, STAKE TREES OVER FIVE (5) FEET AS INDICATED ON DETAIL DRAWING INDICATED OR APPROVED BY THE OWNERS REPRESENTATIVE. REMOVE STAKES AT THE END OF GUARANTEE PERIOD. 12. MULCH SHALL BE APPLIED A MINIMUM OF THREE (3) INCHES IN DEPTH IN ALL PLANTING BEDS, AS INDICATED ON THE DRAWINGS. 13. THE PLANTS SHALL BE WATERED IMMEDIATELY FOLLOWING PLANTING, PREFERABLY WHEN TWO THIRDS OF THE BACKFILL HAS BEEN PLACED SO ALL AIR POCKETS ARE REMOVED AND THE PLANT PROPERLY SET. ADDITIONAL WATERING SHALL BE MADE AT LEAST ONCE EVERY THREE (3) WEEKS UNLESS OTHERWISE DIRECTED UNTIL FINAL ACCEPTANCE OF THE PLANT MATERIAL. 14. UNLESS OTHERWISE SPECIFIED, CONTRACTOR TO LOAM AND SEED ALL DISTURBED AREAS. 15.TREE PRUNING NOTE: STREET TREES SHOULD BE PRUNED TO MAINTAIN A MINIMAL BRANCH HEIGHT OF 7' WITHIN TWO (2) YEARS OF INSTALLATION OF THE TREE. 16.LANDSCAPE ESTABLISHMENT AND MAINTENANCE NOTE: CONTRACTOR SHALL ENSURE THAT ALL LAWN AREAS AND PLANTINGS ARE FULLY ESTABLISHED AND ACCEPTABLE TO THE OWNER'S REPRESENTATIVE PRIOR TO RELINQUISHING THEIR RESPONSIBILITIES FOR MAINTENANCE OF THESE AREAS. 17.TREE PROTECTION NOTE: NO MATERIAL, TEMPORARY SOIL DEPOSIT OR EXCAVATION SHALL OCCUR WITHIN FOUR FEET OF SHRUBS OR WITHIN TWO FEET OF THE DRIP LINE OF ANY SHRUBS OR TREES TO REMAIN. ANY RETAINED EXISTING VEGETATION SHALL BE PROTECTED AS PER NORTH KINGSTOWN ZONING ORDINANCE, SECTION 21-277, SUBSECTION 3a: PROTECTION OF EXISTING PLANTINGS AND SITE FEATURES. PLANT SCHEDULE SYMBOL CODE BOTANICAL / COMMON NAME SIZE CONTAINER QTY DETAIL REMARKS DECIDUOUS TREES AMC Amerlanchier canadensis / Serviceberry, shadbush 3" Cal.B&B 3 NYS Nyssa sylvatica / Black Tupelo 3" Cal.B&B 2 EVERGREEN TREES JV2 Juniperus virginiana / Eastern Red Cedar 6` Ht.B&B 7 3" Cal. min. SHRUBS RHP Rhododendron periclymenodies / Pink Azalea, pinxterbloom 3 gal CONT.6 COP Comptonia peregrina / Sweet Fern 2 - 3 gal CONT.22 IAH Ilex opaca / American Holly 3-5 gal CONT.5 PRM Prunus maritima / Beach Plum 2-3 gal CONT.13 PERENNIALS MON Monardo fisulosa / Wild Bergamot 1 gal.CONT.11 CAR Carex ensylvanica / Pennsylvania Sedge 1 gal.CONT.14 NOTES 1. PLANT ALL DISTURBED AREAS WITH LOAM AND SEED UNLESS NOTED OTHERWISE. 2. INSTALL BIODEGRADABLE EROSION CONTROL MAT IN ALL SLOPES GREATER THAN 3:1. X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X E M WV GV MAP 36, LOT 82.1 N/F KISHOR K. PATEL VOLUME 12505, PAGE 226 (COMMERCIAL USE; ZONE B2) MASS. HWY. BOUND MAP 36, LOT 82.2.1 N/F JOAO SILVA VOLUME 31220, PAGE 309 (RESIDENTIAL USE; ZONE B2) MH WV DREW'S WAY (PRIVATE RIGHT OF WAY ~ 12' WIDTH) 2 STY. ECONOLODGE MOTEL No. 59 MAP 36, LOT 76 N/F DIPTI LLC VOLUME 27426, PAGE 307 (COMMERCIAL USE; ZONE B2) MAP 36, LOT 71 N/F ROSEANN KELLEHER VOLUME 21626, PAGE 104 (RESIDENTIAL USE; ZONE B1) MAP 36, LOT 82.2.2 N/F HUGH VARDAN & JOHN MOYLAN VOLUME 29158, PAGE 71 (RESIDENTIAL USE; ZONE B2) 1 9 3 3 S T A T E H I G H A W Y ~ L O 2 9 7 7 2 2 21 22 21 20 19 18 17 1 6 21 20 20 19 19 2 5 24 23 23 23 23 22 21 OHW OHW OHW OHW GM 25 2 4 24 23 23 2 2 21 22 21 20 19 GV GV DD D D D W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W G G G G G G G G G G G G G G W W W W W W G G W W T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T OHW OHW OHW OHW OHW OHW O H W O H W O H W O H W O H W O H W O H W O H W O H W O H W O H W OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW GM BH HEDGES COLUMN GUY GASMETER ELEC.METER GASMETER CHAIN LINK FENCE ACUNIT ACUNIT 18 17 1 9 1 8 1 8 1 8 19 1 9 1 8 1 9 BIT. PAVED DRIVEWAY O V E R H E A D W I R E S ( T Y P . ) 5/8" WATER S E R . 2" WATER G G G G G G G G G G G G G G G G G G G GAPPROXIMATE 2" PE GAS MAIN 6 " P E G A S M A I N C O N C . W A L K C O N C . W A L K BIT. PAVED DRIVEWAY LAWN APPROX. 1/2" GAS S E R . UTILITYPOLE (TYP.) (DENSE WOODS / BRUSH) EDGE OF PAVEMENT EDGE OF PAVEMENT WOOD FENCE VINYL FENCE G R A N I T E C U R B I N G ( T Y P . ) R O U T E 2 8 - M A I N S T R E E T ( S T A T E H I G H W A Y L A Y O U T 2 9 7 7 & 6 2 3 7 ) 12 ' A P P R O X . T E L E C O M D U C T ( T Y P . ) A P P R O X . 8 " W A T E R M A I N A P P R O X . 1 6 " W A T E R M A I N 2 STY. "RELAX INN" No. 41 METERPIT 2 0 Z O N E B 1 Z O N E B 2 ZONE B1 ZONE B2 LOD LOD LOD LOD LOD LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD L O D L O D L O D L O D L O D LOD L O D L O D L O D LODL O D L O D L O D L O D L O D L O D L O D L O D LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD L O D L O D L O D LO D LO D LO D LO D LO D D D D D D D PROPOSED BUILDING AREA = 5,115 S.F. FFE = 19.50 D 19.50 18.50 19.5019.5019.50 19.50 19.2619.26 D PROPOSED 12" WIDE REVEAL TRENCH DRAIN SYSTEM WITH STEEL FRAME ZURN Z882 OR EQUAL A A PROPOSED INFILTRATION BASIN (SEE DETAILS) PROPOSED TOPOGRAPHIC DEPRESSION EXTENSION 102 LF - 8" ADS N-12 HDPE PIPE S= 0.03 FTT/F BLDG. INV.: 18.50 8" ADS N-12 HDPE PIPE TO BE MITER TO MATCH SLOPE INV.= 15.50 8" HDPE 45°ELBOW 8-INCHES DEEP CLASS R-3 RIPRAP ATOP 6-INCHES OF 34 -INCH CRUSHED STONE BEDDING ATOP GEOTEXTILE FILTER FABRIC (MIRAFI 140N, OR APPROVED EQUAL); EXTENDING TO BOTTOM OF BASIN AND SLOPE PROPOSED SEDIMENT FOREBAY (SEE DETAILS) PROPOSED CONCRETE WEIRS SPILLWAY (TYP - SEE DETAILS) DMH #1 PROPOSED NYLOPLAST 24" DRAIN BASIN WITH 24" STANDARD FRAME, GRATE, & ENVIROHOOD RIM: 18.60 INV. IN: 16.95 INV. OUT: 16.95 SUMP: 14.95 (SEE DETAILS) PROPOSED UNDERGROUND CRUSHED STONE INFILTRATION TRENCH (TYP.) (SEE DETAILS) 19.15 TH-3 & 4 (DRAINAGE) SS S S S S FM FM FM FM FM F M TH-1 & TH-2 (SEPTIC) TC: 19.38BC: 19.00 19.30 19.00 TC: 19.38BC: 19.00 19.00 TC: 19.38BC: 19.00 19.00 TC: 19.50BC: 19.15 17.50 TC: 19.38BC: 19.00 TC: 19.50BC: 19.00 1 8 19 18 1 8 . 5 16 . 5 16 . 5 15 . 5 17.5 18 . 5 1 8 15 . 5 16 . 5 19 18.5 1 9 19 19 18.5 1 8 18 25 16 14 . 5 14 . 5 16 . 5 18 . 5 17 . 5 20 21 22 23 19 18 17.5 16 17 19 20 21 22 19 20 21 22 23 23 24 24 24 1 9 1 8 . 7 5 18 19 SHEET DESIGNED BY: WMLJR DRAWN BY: SEK/SD CHECKED BY: JAC DATE:NOV. 2024 PROJECT NO: 19-19v REVISIONS: NO. DATE. DESCRIPTION 1 4/2025 DESIGN REVIEW 2 2/5/2026 PERMIT SET BE C K E R ' S P A C K A G E S T O R E 55 R O U T E 2 8 WE S T Y A R M O U T H , M A S S A C H U S E T T S AP 3 6 , L O T S 7 7 , 7 8 & 7 9 OF 8Q: \ 1 9 - 1 9 A h a r o n i a n & A s s o c i a t e s \ 1 9 - 1 9 v B e c k e r s P a c k a g e S t o r e \ A C A D \ B e c k e r ' s P a c k a g e S t o r e [ W o r k i n g P l a n ] - R 3 . d w g F e b . 2 4 , 2 0 2 6 1 1 : 4 5 a m PRELIMINARY, NOT FOR CONSTRUCTION JC E JC E JO E C A S A L I E N G I N E E R I N G , I n c . Ci v i l ∙ S i t e D e v e l o p m e n t ∙ T r a n s p o r t a t i o n Dr a i n a g e ∙ W e t l a n d s ∙ I S D S ∙ T r a f f i c ∙ F l o o d p l a i n 30 0 P o s t R o a d , W a r w i c k , R I 0 2 8 8 8  0       3 0 0  0       3  3 F A ; W W W . J O E C A S A L I . C O 0 GRADING &DRAINAGEPLAN 4 SCALE (FEET) 0 1 INCH = FT 10 20 40 80 20 MA. MAINLAND (NAD 83) PROPOSED MIRAFI 140N FILTER FABRIC AROUND THE OUTER EDGE OF STONE 8" PERFORATED ADS HDPE PIPE (PERFORATIONS UP) INV. IN: 16.95 14"14" 6" 36" 24" PROPOSED 3/4" DOUBLE WASHED CRUSHED STONE COMMON BORROW 6" LOAM & SEED DESCRIPTION 100 YEAR STORM 25 YEAR STORM 10 YEAR STORM 2 YEAR STORM 1 YEAR STORM TOP OF BASIN BOTTOM OF BASIN ELEV. 17.50 14.50 15.05 15.58 16.76 17.25 17.35 INFLTRATION BASIN INFILTRATION BASIN 17.85x x SEDIMENT FOREBAY 30 LF - BROAD CRESTED CONCRETE WEIR WITH 3" REVEAL (TOP OF CURB = EL. 17.35) 4" SANDY LOAM & SEED (TYP.) 3 1 EXISTING GRADE PROPOSED PRECAST CONCRETE CURB FLUSH WITH ASPHALT 3 1 3 1 4" SANDY LOAM & SEED (TYP.) x 17.85x PROPOSED EXISTING DEPRESSION EXTENSION 2 1 4" SANDY LOAM & SEED (TYP.) 16.50x 14.50 16.00 30 LF - BROAD CRESTED CONCRETE WEIR WITH 3" REVEAL (TOP OF CURB = EL. 17.21) EX I S T I N G G R A D E 3 1 PROPOSED BITUMINOUS CONCRETE PARKING LOT UNCOMPACTED SUBGRADE (TYP.); CONTRACTOR MUST NOTIFY DESIGN ENGINEER OF RECORD FOR REVIEW AND APPROVAL OF SUBGRADE PRIOR TO PLACEMENT OF LOAM DESCRIPTION 100 YEAR STORM 25 YEAR STORM 10 YEAR STORM 2 YEAR STORM 1 YEAR STORM TOP OF POND BOTTOM OF POND ELEV. 17.50 16.50 SEDIMENT FOREBAY 17.38 17.40 17.43 17.45 17.49 4" SANDY LOAM & SEED (TYP.) SHGWT ELEV.: NOT ENCOUNTERED (>96-INCHES) TH-3 TH-4 NOT TO SCALE SEDIMENT FOREBAY & INFILTRATION BASIN - SECTION A-A1 NOT TO SCALE CRUSHED STONE INFILTRATION TRENCH DETAIL3 DESCRIPTION 100 YEAR STORM 25 YEAR STORM 10 YEAR STORM 2 YEAR STORM 1 YEAR STORM TOP OF BASIN BOTTOM OF BASIN ELEV. 17.50 16.00 16.00 16.00 16.00 16.02 16.77 EXISTING DEPRESSION EXTENSION SEE PLAN 3:1TOP OF SLOPE 3:1 TOP OF SLOPE BOTTOM OF SLOPE3:1 3:1 EXTEND CLASS "R-3" RIP-RAP TO TOE OF DOWN STREAM SLOPEFLOW FRONT VIEW SIDE VIEW TOP OF SLOPE SEE PLAN GEOTEXTILE FILTER FABRIC (MIRAFI 140N OR APPROVED EQUAL) GEOTEXTILE FILTER FABRIC (MIRAFI 140N OR APPROVED EQUAL) 15" DEEP RIP-RAP (CLASS R-3; 4" TO 6" NOMINAL DIA.) 6-INCH-WIDE x 36-INCH-DEEP CAST-IN-PLACE CONCRETE WEIR (LENGTH PER PLAN) 6" DEEP RIP-RAP BEDDING (3 4" CRUSHED STONE) BOTTOM OF EXPOSED WEIR 15" DEEP RIP-RAP (CLASS R-3; 4" TO 6" NOMINAL DIA.) 6" DEEP RIP-RAP BEDDING (3 4" CRUSHED STONE) COMPACT NATIVE BACKFILL OR COMMON BORROW TO 92% MODIFIED PROCTOR 18" MIN. 18" MIN. BOTTOM OF CIP CONCRETE WEIR (EMBED MIN. 12-INCHES INTO EMBANKMENT) NOT TO SCALE CONCRETE WEIR DETAIL2 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X E M WV GV MAP 36, LOT 82.1 N/F KISHOR K. PATEL VOLUME 12505, PAGE 226 (COMMERCIAL USE; ZONE B2) MAP 36, LOT 82.2.1 N/F JOAO SILVA VOLUME 31220, PAGE 309 (RESIDENTIAL USE; ZONE B2) MH WV DREW'S WAY (PRIVATE RIGHT OF WAY ~ 12' WIDTH) 2 STY. ECONOLODGE MOTEL No. 59 MAP 36, LOT 76 N/F DIPTI LLC VOLUME 27426, PAGE 307 (COMMERCIAL USE; ZONE B2) MAP 36, LOT 71 N/F ROSEANN KELLEHER VOLUME 21626, PAGE 104 (RESIDENTIAL USE; ZONE B1) MAP 36, LOT 82.2.2 N/F HUGH VARDAN & JOHN MOYLAN VOLUME 29158, PAGE 71 (RESIDENTIAL USE; ZONE B2) 1 9 3 3 S T A T E H I G H A W Y ~ L O 2 9 7 7 2 2 21 22 21 20 19 18 17 1 6 21 20 20 19 19 2 5 24 23 23 23 23 22 21 OHW OHW OHW OHW GM 25 2 4 24 23 23 2 2 21 22 21 20 19 GV GV DD D D D W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W G G G G G G G G G G G G G G W W W W W W G G W W T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T OHW OHW OHW OHW OHW OHW O H W O H W O H W O H W O H W O H W O H W O H W O H W O H W O H W OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW OHW GM BH HEDGES COLUMN GUY GASMETER ELEC.METER GASMETER CHAIN LINK FENCE ACUNIT ACUNIT 18 17 1 9 1 8 1 8 1 8 19 1 9 1 8 1 9 BIT. PAVED DRIVEWAY O V E R H E A D W I R E S ( T Y P . ) 5/8" WATER S E R . 2" WATER G G G G G G G G G G G G G G G G G G G GAPPROXIMATE 2" PE GAS MAIN 6 " P E G A S M A I N C O N C . W A L K C O N C . W A L K BIT. PAVED DRIVEWAY LAWN APPROX. 1/2" GAS S E R . UTILITYPOLE (TYP.) (DENSE WOODS / BRUSH) EDGE OF PAVEMENT EDGE OF PAVEMENT WOOD FENCE VINYL FENCE G R A N I T E C U R B I N G ( T Y P . ) R O U T E 2 8 - M A I N S T R E E T ( S T A T E H I G H W A Y L A Y O U T 2 9 7 7 & 6 2 3 7 ) 12 ' A P P R O X . T E L E C O M D U C T ( T Y P . ) A P P R O X . 8 " W A T E R M A I N A P P R O X . 1 6 " W A T E R M A I N 2 STY. "RELAX INN" No. 41 METERPIT 2 0 Z O N E B 1 Z O N E B 2 ZONE B1 ZONE B2 D D D D D D D D BLDG. SEWER INV. 15.50 2" - SDR-21 PVC SEWER 15 LF - 4" SCH40 PVC SEWER PIPE S = 0.02 FT/FT (MIN.) PROPOSED 1,000 GALLON ONE COMPARTMENT SEPTIC TANK PUMP CHAMBER (SEE DETAIL) INV IN: 14.67 INV OUT: 16.50 TH-3 & 4 (DRAINAGE) S SMH #1 RIM: 19.00 INV IN: 15.20 (BLDG) INV OUT : 15.10 (TANK) INV OUT: 15.10 (STUB) S S S S S CAP SEWER SERVICE FOR FUTURE CONNECTION INV: 14.0± BACKWATER VALVE (CLEAN-CHECK OR EQUAL) AND CLEANOUT (TYP.) FFE: 19.50 UG E UGE 50 LF - 4" SDR-35 PVC SEWER PIPE S = 0.02 FT/FT (MIN.) FM FM FM FM FM F M EFFLUENT INTAKE CTL-12 INV IN: 22.32 PROPOSED SOIL ABSORPTION SYSTEM (SAS) CONSISTING OF (12) CUR -TECH CTL-12, 4' X 8' UNITS TOTAL BED SIZE: 48' x 12.75' 4" VENT WITH CHARCOAL FILTER (SEE DETAIL) DISTRIBUTION BOX (DBOX DB-5) INV IN: 22.50 INV OUT: 22.33 TH-1 & TH-2 (SEPTIC) INSPECTION PORT 1 8 19 18 1 8 . 5 16 . 5 16 . 5 15 . 5 17.5 18 . 5 1 8 15 . 5 16 . 5 19 18.5 1 9 19 19 18.5 1 8 18 25 16 14 . 5 14 . 5 16 . 5 18 . 5 17 . 5 20 21 22 23 19 18 17.5 16 17 19 20 21 22 19 20 21 22 23 23 24 24 24 1 9 1 8 . 7 5 18 19 PROPOSED 2,500 GALLON TWO COMPARTMENT SEPTIC TANK (SEE DETAIL) INV IN: 15.00 INV OUT: 14.82 8 LF - 4" SDR-35 PVC SEWER PIPE S = 0.01 FT/FT (MIN.) 10 LF - 4" SDR-35 PVC SEWER PIPE S = 0.01 FT/FT (MIN.) SHEET DESIGNED BY: WMLJR DRAWN BY: SEK/SD CHECKED BY: JAC DATE:NOV. 2024 PROJECT NO: 19-19v REVISIONS: NO. DATE. DESCRIPTION 1 4/2025 DESIGN REVIEW 2 2/5/2026 PERMIT SET BE C K E R ' S P A C K A G E S T O R E 55 R O U T E 2 8 WE S T Y A R M O U T H , M A S S A C H U S E T T S AP 3 6 , L O T S 7 7 , 7 8 & 7 9 OF 8Q: \ 1 9 - 1 9 A h a r o n i a n & A s s o c i a t e s \ 1 9 - 1 9 v B e c k e r s P a c k a g e S t o r e \ A C A D \ B e c k e r ' s P a c k a g e S t o r e [ W o r k i n g P l a n ] - R 3 . d w g F e b . 2 4 , 2 0 2 6 1 1 : 4 5 a m PRELIMINARY, NOT FOR CONSTRUCTION JC E JC E JO E C A S A L I E N G I N E E R I N G , I n c . Ci v i l ∙ S i t e D e v e l o p m e n t ∙ T r a n s p o r t a t i o n Dr a i n a g e ∙ W e t l a n d s ∙ I S D S ∙ T r a f f i c ∙ F l o o d p l a i n 30 0 P o s t R o a d , W a r w i c k , R I 0 2 8 8 8  0       3 0 0  0       3  3 F A ; W W W . J O E C A S A L I . C O 0 UTILITY PLAN 5 SCALE (FEET) 0 1 INCH = FT 10 20 40 80 20 MA. MAINLAND (NAD 83) DESIGN FLOW CALCULATION: PER SECTION 15.203: SYSTEM SEWAGE FLOW DESIGN CRITERIA PROPOSED RETAIL (LIQUOR STORE): 5,115 SF / 1,000 SF x 50 GPD = 256 GPD, USE 260 GPD MIN. PROPOSED FAMILY DWELLING, MULTIPLE: TOTAL NUMBER OF BEDROOMS = 4 BEDROOMS 4 BEDROOMS x 110 GPD = 440 GPD TOTAL DESIGN FLOW = 260 GPD + 440 GPD = 700 GPD SEPTIC TANKS: PER SECTION 15.224 MULTIPLE COMPARTMENT TANKS: (2) THE FIRST COMPARTMENT SHALL BE SIZED FOR A MINIMUM HYDRAULIC DETENTION TIME OF 48 HOURS BASED ON THE DESIGN FLOW. (3) THE SECOND COMPARTMENT SHALL BE SIZED FOR A MINIMUM HYDRAULIC DETENTION TIME OF 24 HOURS BASED ON THE DESIGN FLOW. RETAIL + MULTIPLE FAMILY DWELLING DESIGN FLOW: 700 GPD 48 HOUR DETENTION TIME: 1,400 GALLONS 24 HOUR DETENTION TIME: 700 GALLONS ·THEREFORE A 2,500 TWO-COMPARTMENT TANK REQUIRED. PERCOLATION TEST DATA HOLE #: DATE: RATE: DEPTH: ELEVATION 1 11/19/2025 2 MIN/IN 60" 22.5900 2 11/19/2025 2 MIN/IN 60" 22.5900 PERFORMED BY: CHARLOTTE SPEAKMAN WITNESSED BY: BARRY LEWIS, YARMOUTH BOARD OF HEALTH LEACHFIELD DESIGN: DESIGN DATA: DESIGN RATE: <2 MIN/IN CLASS I SOILS EFFLUENT LOADING RATE: 0.74 GPD/SF LEACHING BED: 700 GPD / 0.74 GPD/SF = 946 SF REQUIRED AREA 1 LEACHING BED PROPOSED CONSISTING OF: 2 ROWS OF 6 CUR-TECH GOOD FLOW CTL-12 (4' x 8') UNITS EACH UNIT PROVIDES 10.57 SF/LF OF TREATMENT AREA 6 UNITS x 8 FT/UNIT x 2 ROWS = 96 LF 96 LF x 10.57 = 1,014.72 SF 1,014.72 > 946 SF OK SHEET DESIGNED BY: WMLJR DRAWN BY: SEK/SD CHECKED BY: JAC DATE:NOV. 2024 PROJECT NO: 19-19v REVISIONS: NO. DATE. DESCRIPTION 1 4/2025 DESIGN REVIEW 2 2/5/2026 PERMIT SET BE C K E R ' S P A C K A G E S T O R E 55 R O U T E 2 8 WE S T Y A R M O U T H , M A S S A C H U S E T T S AP 3 6 , L O T S 7 7 , 7 8 & 7 9 OF 8Q: \ 1 9 - 1 9 A h a r o n i a n & A s s o c i a t e s \ 1 9 - 1 9 v B e c k e r s P a c k a g e S t o r e \ A C A D \ B e c k e r ' s P a c k a g e S t o r e [ W o r k i n g P l a n ] - R 3 . d w g F e b . 2 4 , 2 0 2 6 1 1 : 4 5 a m PRELIMINARY, NOT FOR CONSTRUCTION JC E JC E JO E C A S A L I E N G I N E E R I N G , I n c . Ci v i l ∙ S i t e D e v e l o p m e n t ∙ T r a n s p o r t a t i o n Dr a i n a g e ∙ W e t l a n d s ∙ I S D S ∙ T r a f f i c ∙ F l o o d p l a i n 30 0 P o s t R o a d , W a r w i c k , R I 0 2 8 8 8  0       3 0 0  0       3  3 F A ; W W W . J O E C A S A L I . C O 0 CIVIL DETAILS I 6 HANDICAPPED $50.00 FINE TOWING ENFORCED REQUIRED CERTIFICATE PARKING VAN NOTE: SIGNS ARE TO CONFORM WITH THE MOST RECENT EDITION OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. * VAN ACCESSIBLE SIGNS FOR SPACES ADJACENT TO THE 8' STRIPED ISLE. SIGN NOTES: 1. SIGN POSTS SHALL BE GALVANIZED STEEL U-CHANNEL (3 1/2" WIDE-MIN) AND INSTALLED IN CONFORMANCE TO M.U.T.C.D. AND RHODE ISLAND STANDARD SPECIFICATIONS. 2. POSTS SHALL BE DRIVEN TO A DEPTH OF 4 FEET (MIN). 3. THE EDGE OF THE SIGN SHALL BE 18" FROM THE FACE OF THE CURB. 4. WITHIN SIDEWALK LOCATIONS THE SIGN POST WILL BE INSTALLED WITHIN A 8"X8"X6" SQUARE BOX FORM. 8 " 6" 26" 27 " 5" WHITE 2 " 6" 18 " 45° 3' O C STRIPE 4" WHITE 8'8' 20 ' SEE HANDICAP PAVEMENT MARKING DETAIL THIS SHEET PROPOSED HANDICAP PARKING SIGN (TYP.) (SEE DETAIL,THIS SHEET) CONCRETE CURB TRANSITION NOTE: 1. ALL HANDICAP PARKING AND SIGNAGE SHALL BE IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT AND THE MASSACHUSETTS STATE BUILDING CODE. 6" CONCRETE SLAB (4,000 PSI) WITH HAUNCH, REINFORCED WITH 6 X 6 W 2.1 X W2.1 W.W.F. PITCH 1/4"/FOOT 6" GRAVEL BORROW AA PLAN VIEW SECTION A-A FINISH GRADE CONTROL JOINT (TYP.) 10' 10' EXPANSION RESTRAINT BAG REMOVAL CATCH BASIN GRATE REBAR FOR SILTSACK SILTSACK FLOW FLOW CATCH BASIN GRATE Notes: PLAN VIEW SECTION VIEW 1. INSTALL SILTSACK IN PROPOSED CATCH BASINS. GRATE TO BE PLACED OVER SILTSACK. SILTSACK SHALL BE INSPECTED PERIODICALLY AND AFTER ALL STORM EVENTS AND CLEANING OR REPLACEMENT SHALL BE PERFORMED PROMPTLY AS NEEDED. 2. MAINTAIN UNTIL UPSTREAM AREAS HAVE BEEN PERMANENTLY STABILIZED. 12' 4" CEMENT CONCRETE SIDEWALK 8" GRAVEL BORROW 6x6 W2.1xW2.1 WELDED WIRE FABRIC NOTES: 1. SHALL BE IN ACCORDANCE WITH ALL APPLICABLE TOWN OF YARMOUTH AND MASSACHUSETTS DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS. 2. EDGE OF SIGN SHALL BE 1'-6" MIN. FROM EDGE OF CURB. 3. INSTALLATION TO BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. NOT TO SCALE SILT SACK SEDIMENT TRAP4 NOT TO SCALE HANDICAP PARKING SIGNS5 NOT TO SCALE HANDICAP PAVEMENT MARKING 6 NOT TO SCALE HANDICAP PARKING STALLS 7 NOT TO SCALE CEMENT CONCRETE SIDEWALK8 NOT TO SCALE REGULATORY SIGN MOUNTING DETAIL9 NOT TO SCALE DUMPSTER PAD DETAIL10 8' CUT AND REMOVE TOP 50% OF BURLAP & WIRE BASKET FROM TOPS AND SIDES OF ROOTBALL 3" BARK MULCH. MULCH SHOULD NOT BE WITHIN 4" OF TREE TRUNK TRUNK FLARE & TOP OF ROOTBALL SHOULD BE AT GRADE REMOVE DEAD AND BROKEN BRANCHES ONLY DO NOT CUT LEADER EXCAVATE SUBSOIL AS REQUIRED TO PLACE ROOTBALL TO PROPER ELEVATION. PLACE ROOTBALL DIRECTLY ON COMPACTED OR UNDISTURBED SUBSOIL. PLANTING BED 2X WIDER (MIN.) THAN ROOTBALL. BACKFILL W/LOAM TREE STABILIZATION (SEE DETAIL) INSTALL TREE PLUMB SECTION INSTALL LONG PRONG UP AGAINST ROOTBALL INSTALL SHORT PRONG HALFWAY BETWEEN TRUNK AND EDGE OF ROOTBALL EDGE OF PLANTING SOIL/TREE PIT TREE STAPLE TREE TRUNK NOTE: CONTRACTOR SHALL USE CAUTION WITH TREE STAPLES SO NOT TO BE DRIVEN INTO SUBGRADE PIPES AND UTILITIES ROOTBALLPLAN NOT TO SCALE TREE PLANTING DETAIL11 SHEET DESIGNED BY: WMLJR DRAWN BY: SEK/SD CHECKED BY: JAC DATE:NOV. 2024 PROJECT NO: 19-19v REVISIONS: NO. DATE. DESCRIPTION 1 4/2025 DESIGN REVIEW 2 2/5/2026 PERMIT SET BE C K E R ' S P A C K A G E S T O R E 55 R O U T E 2 8 WE S T Y A R M O U T H , M A S S A C H U S E T T S AP 3 6 , L O T S 7 7 , 7 8 & 7 9 OF 8Q: \ 1 9 - 1 9 A h a r o n i a n & A s s o c i a t e s \ 1 9 - 1 9 v B e c k e r s P a c k a g e S t o r e \ A C A D \ B e c k e r ' s P a c k a g e S t o r e [ W o r k i n g P l a n ] - R 3 . d w g F e b . 2 4 , 2 0 2 6 1 1 : 4 5 a m PRELIMINARY, NOT FOR CONSTRUCTION JC E JC E JO E C A S A L I E N G I N E E R I N G , I n c . Ci v i l ∙ S i t e D e v e l o p m e n t ∙ T r a n s p o r t a t i o n Dr a i n a g e ∙ W e t l a n d s ∙ I S D S ∙ T r a f f i c ∙ F l o o d p l a i n 30 0 P o s t R o a d , W a r w i c k , R I 0 2 8 8 8  0       3 0 0  0       3  3 F A ; W W W . J O E C A S A L I . C O 0 CIVIL DETAILS II 7 1% MINIMUM SLOPE 45° BEND DOWNSPOUT 1' MAX. FINISH GRADE SCREEN DETAIL FASTENER WYE CONNECTION REDUCER FITTING AS REQUIRED COLLECTION PIPE (SIZE PER PLAN) GALVANIZED 1/4 INCH WIRE MESH SCREEN PIPE CAP W/STAINLESS STEEL HOSE CLAMP TO SECURE SCREENFINAL BACKFILL 60" 30" 54" 48" 42" 36" 18" 24" 15" 12" 96" 56" 88" 80" 72" 64" 39" 48" 34" 30" PIPE DIAM.MIN. TRENCH WIDTH 8" 10" 6" 4" 26" 28" 23" 21" RECOMMENDED MINIMUM TRENCH WIDTHS INITIAL BACKFILL HAUNCH BEDDING SUITABLE FOUNDATION HEAVY CONSTRUCTION (75T AXLE LOAD) * 48" 60" 12" 24"54" - 60" 12" - 48" PIPE DIAM. SURFACE LIVE LOADING CONDITION MINIMUM RECOMMENDED COVER BASED ON VEHICLE LOADING CONDITIONS H-25 * VEHICLES IN EXCESS OF 75T MAY REQUIRE ADDITIONAL COVER NOTES: 1. ALL PIPE SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH ASTM D2321, "STANDARD PRACTICE FOR UNDERGROUND INSTALLATION OF THERMOPLASTIC PIPE FOR SEWERS AND OTHER GRAVITY FLOW APPLICATIONS", LATEST ADDITION 2. MEASURES SHOULD BE TAKEN TO PREVENT MIGRATION OF NATIVE FINES INTO BACKFILL MATERIAL, WHEN REQUIRED. 3. FOUNDATION: WHERE THE TRENCH BOTTOM IS UNSTABLE, THE CONTRACTOR SHALL EXCAVATE TO A DEPTH REQUIRED BY THE ENGINEER AND REPLACE WITH SUITABLE MATERIAL AS SPECIFIED BY THE ENGINEER. AS AN ALTERNATIVE AND AT THE DISCRETION OF THE DESIGN ENGINEER, THE TRENCH BOTTOM MAY BE STABILIZED USING A GEOTEXTILE MATERIAL. 4. BEDDING: SUITABLE MATERIAL SHALL BE CLASS I, II OR III. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION FOR MATERIAL SPECIFICATION TO ENGINEER. UNLESS OTHERWISE NOTED BY THE ENGINEER, MINIMUM BEDDING THICKNESS SHALL BE 4" (100mm) FOR 4"-24" (100mm-600mm); 6" (150mm) FOR 30"-60" (750mm-900mm). 5. INITIAL BACKFILL: SUITABLE MATERIAL SHALL BE CLASS I, II OR III IN THE PIPE ZONE EXTENDING NOT LESS THAN 6" ABOVE CROWN OF PIPE. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION FOR MATERIAL SPECIFICATION TO ENGINEER. MATERIAL SHALL BE INSTALLED AS REQUIRED IN ASTM D2321, LATEST EDITION. 6. MINIMUM COVER: MINIMUM COVER, H, IN NON-TRAFFIC APPLICATIONS (GRASS OR LANDSCAPE AREAS) IS 12" FROM THE TOP OF PIPE TO GROUND SURFACE. ADDITIONAL COVER MAY BE REQUIRED TO PREVENT FLOTATION. FOR TRAFFIC APPLICATIONS, MINIMUM COVER, H, IS 12" UP TO 48" DIAMETER PIPE AND 24" OF COVER FOR 54"-60" DIAMETER PIPE, MEASURED FROM TOP OF PIPE TO BOTTOM OF FLEXIBLE PAVEMENT OR TO TOP OF RIGID PAVEMENT. MINIMUM RECOMMENDED COVER BASED ON RAILWAY LOADING CONDITIONS ** COVER IS MEASURED FROM TOP OF PIPE TO BOTTOM OF RAILWAY TIE. *** E-80 COVER REQUIREMENTS, ARE ONLY APPLICABLE TO ASTM F 2306 PIPE. MIN. TRENCH WIDTH (SEE TABLE) 4" FOR 12"-24" PIPE 6" FOR 30"-60" PIPE 6" MIN. COVER TO RIGID PAVEMENT, H MIN. COVER TO FLEXIBLE PAVEMENT, H SPRINGLINE NOT TO SCALE 24" NYLOPLAST DRAIN BASIN DETAIL12 NOT TO SCALE NYLOPLAST SOLID COVER DETAIL13 NOT TO SCALE DRAIN PIPE TRENCH INSTALLATION DETAIL15 NOT TO SCALE DOWNSPOUT LEADER CONNECTION DETAIL16 O.D. 2'-0" TYP. 2'-0" MAX TRENCH EXCAVATION 2'-0" TYP. PRECAST REINFORCED CONCRETE MANHOLE BASE FORMED BRICK INVERT CONSTRUCTED WITH BRICK LAID AS STRETCHERS AND ON EDGE TO FUTURE SEWER CONNECTION TO SEPTIC 48" BB 2' 48" FINISH GRADE MANHOLE FRAME & COVER SHALL BE EAST JORDAN IRON WORKS PRODUCT NO. 00211046C02, OR APPROVED EQUAL,WITH THE WORD "SEWER" CAST INTO THE COVER 30" OPENING CEMENT MORTAR BITUMASTIC COATING ON EXTERIOR RUBBER O-RING GASKET OR PREFORMED FLEXIBLE JOINT SEALANT BETWEEN MANHOLE SECTIONS PRECAST CONCRETE MANHOLE RISERS AS REQUIRED NOTES: 1. ALL LIFTING HOLES TO BE PLUGGED IN AND OUT WITH HYDRAULIC CEMENT. 2. ALL JOINTS TO BE HYDRAULICALLY CEMENTED. 3. BACKFILL TO BE SCREENED WITH NO STONES LARGER THAN 2" DIAMETER. KOR-N-SEAL (OR EQUAL) JOINT SLEEVE (TYP.) FORMED BRICK INVERT HIGHEST PIPE SLOPE PRECAST CONCRETE MANHOLE CONE SECTION AS REQUIRED SECTION B-B 3/4-INCH CRUSHED STONE BEDDING SHALL BE PLACED A MINIMUM OF 12" UNDER MANHOLE BASE ADJUST TO GRADE WITH 2 BRICK COURSES MIN., 4 BRICK COURSE MAX WITH 38" MORTAR JOINTS. BED FRAME IN FULL 38" MIN. MORTAR BED PLASTIC COATED STEEL MANHOLE STEPS 12" ON CENTER NOT TO SCALE TYPICAL SEWER MANHOLE DETAIL18 NOT TO SCALE 1,000 GAL. SEPTIC TANK DETAIL17 NOTES: 1. IF UNSUITABLE MATERIALS ARE ENCOUNTERED AT SUBGRADE ELEVATION, THE CONTRACTOR SHALL NOTIFY THE ENGINEER. THE DEPTH OF UNSUITABLE MATERIAL TO BE REMOVED WILL BE DETERMINED IN THE FIELD. THE CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE THE UNSUITABLE MATERIALS AND REPLACE WITH SUITABLE MATERIAL APPROVED BY THE ENGINEER. 2. MINIMUM COMPACTION FOR GRAVEL BORROW SUB-BASE AND SUBGRADE: 95% MODIFIED PROCTOR. 12" GRAVEL BORROW, PLACED AND COMPACTED IN TWO, UNIFORM LOOSE LIFTS 1.75" BITUMINOUS CONCRETE SURFACE COURSE (CLASS 9.5) 2.25" BITUMINOUS CONCRETE BASE COURSE (CLASS 12.5) CONTRACTOR SHALL NOTIFY ENGINEER OF ANY UNSUITABLE MATERIAL FOUND DURING EXCAVATION. UNSUITABLE MATERIAL TO BE REMOVED AND DISPOSED TO A DEPTH DETERMINED IN THE FIELD BY THE ENGINEER. ASPHALT TACK COAT COMPACTED SUBGRADE NOT TO SCALE BITUMINOUS CONC. PAVEMENT14 TEMP. BLOCKING 16.24 9.32 14.8215.00 2,500 GAL. TWO COMPARTMENT SEPTIC TANK ELEVATION OVER SEPTIC TANK: 18.00 FROM BUILDING TO 1000 GALLONS PUMP CHAMBER 24" Ø RISER TO GRADE WITH H-20 LOADED FRAME AND COVER (TYP.) PIPES SHALL BE CONNECTED WITH A WATERTIGHT SEALED FLEXIBLE JOINT FASTENED WITH A STAINLESS STEEL RETRACTABLE CLAMP BUILDING SEWER 4" SDR 35 PVC PIPE S = 0.01 FT/FT 3 4 " 1 0 " M I N . PIPES SHALL BE CONNECTED WITH A WATERTIGHT SEALED FLEXIBLE JOINT FASTENED WITH A STAINLESS STEEL RETRACTABLE CLAMP 6 0 " L I Q U I D L E V E L PROPOSED GAS TRAP NOT TO SCALE SEPTIC TANK TYPICAL SECTION19 4 ' M I N . S E P A R A T I O N L E G D E SHEET DESIGNED BY: WMLJR DRAWN BY: SEK/SD CHECKED BY: JAC DATE:NOV. 2024 PROJECT NO: 19-19v REVISIONS: NO. DATE. DESCRIPTION 1 4/2025 DESIGN REVIEW 2 2/5/2026 PERMIT SET BE C K E R ' S P A C K A G E S T O R E 55 R O U T E 2 8 WE S T Y A R M O U T H , M A S S A C H U S E T T S AP 3 6 , L O T S 7 7 , 7 8 & 7 9 OF 8Q: \ 1 9 - 1 9 A h a r o n i a n & A s s o c i a t e s \ 1 9 - 1 9 v B e c k e r s P a c k a g e S t o r e \ A C A D \ B e c k e r ' s P a c k a g e S t o r e [ W o r k i n g P l a n ] - R 3 . d w g F e b . 2 4 , 2 0 2 6 1 1 : 4 5 a m PRELIMINARY, NOT FOR CONSTRUCTION JC E JC E JO E C A S A L I E N G I N E E R I N G , I n c . Ci v i l ∙ S i t e D e v e l o p m e n t ∙ T r a n s p o r t a t i o n Dr a i n a g e ∙ W e t l a n d s ∙ I S D S ∙ T r a f f i c ∙ F l o o d p l a i n 30 0 P o s t R o a d , W a r w i c k , R I 0 2 8 8 8  0       3 0 0  0       3  3 F A ; W W W . J O E C A S A L I . C O 0 CIVIL DETAILS III 8 NOTES: 1. IF UNSUITABLE MATERIALS ARE ENCOUNTERED AT SUBGRADE ELEVATION, THE CONTRACTOR SHALL NOTIFY THE ENGINEER. THE DEPTH OF UNSUITABLE MATERIAL TO BE REMOVED WILL BE DETERMINED IN THE FIELD. THE CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE THE UNSUITABLE MATERIALS AND REPLACE WITH SUITABLE MATERIAL APPROVED BY THE ENGINEER. 2. MINIMUM COMPACTION FOR GRAVEL BORROW SUB-BASE AND SUBGRADE: 95% MODIFIED PROCTOR. 12" GRAVEL BORROW, PLACED AND COMPACTED IN TWO, UNIFORM LOOSE LIFTS 1.75" BITUMINOUS CONCRETE SURFACE COURSE (CLASS 9.5) 2.25" BITUMINOUS CONCRETE BASE COURSE (CLASS 12.5) CONTRACTOR SHALL NOTIFY ENGINEER OF ANY UNSUITABLE MATERIAL FOUND DURING EXCAVATION. UNSUITABLE MATERIAL TO BE REMOVED AND DISPOSED TO A DEPTH DETERMINED IN THE FIELD BY THE ENGINEER. ASPHALT TACK COAT COMPACTED SUBGRADE 6'-0" 1' - 6 " 9" 3 1/2" 5/8"x2 1/4" DOWEL SOCKET 7" NORMAL GUTTER LINE 1/2"Ø x 4" EPOXY COATED DOWEL 10" 6 1/2"1/2" 160 ' - 0 " MAX . R= CIRCULAR CURB 1" NOTES: 1. SHALL BE IN ACCORDANCE WITH ALL APPLICABLE TOWN OF YARMOUTH AND MASSACHUSETTS DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS. 2. MINIMUM LENGTH OF STRAIGHT OR CIRCULAR FILLER PIECES TO BE 3'-0". 3. EXPOSED SURFACES TO HAVE A SPONGE FLOAT FINISH. 4. CIRCULAR CURB IS REQUIRED ON CURVES WITH RADII OF 160'-0" OR LESS. STRAIGHT CURB TO BE USED ON CURVES OF MORE THAN 160'-0" RADIUS. 5. EXPOSED EDGES TO HAVE A 3/4" CHAMFER. 2 1/4" 6" GUTTER LINE 1'-6" 3'-0" 10 " 7" 1/2" 2 1/4" Ø x DOWEL SOCKET 5/8" 3 1/2" 9" 6 1/2" (SEE NOTE 2) NOTES: 1. SHALL BE IN ACCORDANCE WITH ALL APPLICABLE TOWN OF YARMOUTH AND MASSACHUSETTS DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS. 2. DRAWING SHOWS TRANSITION CURB FOR ONE DIRECTION, FOR OTHER DIRECTION USED OPPOSITE HAND AND INCLUDE A 1/2" Ø X 4" EPOXY COATED DOWEL. 3. EXPOSED SURFACES TO HAVE A SPONGE FLOAT FINISH. 4. EXPOSED EDGES TO HAVE A 3/4" CHAMFER. 5. LEFT AND RIGHT SECTIONS SHALL BE INSTALLED AS REQUIRED. 10 " 6'-0" 1'-6" GUTTER LINE 6 1/2"6" 2 1/4" 6" 9" 3 1/2" 5/8" DOWEL Ø x 2 1/4" 1/2" 7" SOCKET (SEE NOTE 2) NOTES: 1. SHALL BE IN ACCORDANCE WITH ALL APPLICABLE TOWN OF YARMOUTH AND MASSACHUSETTS DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS. 2. DRAWING SHOWS TRANSITION CURB FOR ONE DIRECTION. FOR OTHER DIRECTION USE OPPOSITE HAND AND INCLUDE A 1/2-INCH Ø 4-INCH EPOXY COATED DOWEL. 3. EXPOSED SURFACES TO HAVE A SPONGE FLOAT FINISH. 4. EXPOSED EDGES TO HAVE A 3/4-INCH CHAMFER. LEGEND COLOR BACKGROUND COPY M.U.T.C.D. SIGN NUMBER SIGN DIMENSION WHITE RED R1-1 STOP 24" 24"WIDTH HEIGHT R5-1 30" 30" RED WHITE DO ENTER NOT RED WHITE RED NOT TO SCALE PRECAST CONCRETE CURB20 NOT TO SCALE 3'-0 PRECAST CONCRETE TRANSITION CURB21 NOT TO SCALE 6'-0 PRECAST CONCRETE TRANSITION CURB22 NOT TO SCALE REGULATORY SIGN DETAILS26 NOT TO SCALE PUMP CHAMBER TANK SECTION25 NOT TO SCALE CUR-TECH SYSTEM PROFILE-SECTION B-B28 NOT TO SCALE CUR-TECH CTL-12 TYPICAL SECTION24 24" Ø RISER WITH H-20 LOADED FRAME & COVER 30" Ø RISER WITH H-20 LOADED FRAME & COVER PUMP & HIGH WATER ALARM TO BE PLACED ON SEPARATE ELECTRICAL CIRCUITS 3 ' M I N . S E P A R A T I O N S H G W T 1 8 " M I N . 2" SDR 21 PVC PIPE FROM LIFT TANK 4" SCH-40 FROM DBOX S = LAID FLAT PROPOSED FINISH GRADE OVER LEACH FIELD ELEV. 24.00 INV. IN: 22.50 INV: 22.32 CUR-TECH CTL-12 LEACHING BED (8) 4' X 8' UNITS BED SIZE: 48' X 12.75' TOP OF CHAMBERS ELEV. 22.82 GEOTEXTILE FILTER FABRIC VENT WITH CHARCOAL FILTER 4" VENTILATION MANIFOLD 10 INCHES MIN. CONTRACTOR TO BACKFILL VOIDS BETWEEN ABS INJECTION MOLDED FINS USING ASTM C-33 CONCRETE SAND SHWT: NONE ENCOUNTERED (OWTS TH-1) INSPECTION PORT (TYP.) SEE UTILITY PLAN FOR LOCATIONS INV. OUT: 22.33 PROPOSED 9-OUTLET DISTRIBUTION BOX WITH BAFFLE AND WATERTIGHT RISER FILL MATERIAL PER 310 CMR DEPARTMENT OF ENVIRONMENTAL PROTECTION SEC. 15.255 (3) (SEE NOTE) REMOVE AND DISPOSE ALL TOPSOIL AND SUBSOIL (A AND B HORIZONS) AND ALL FILL MATERIAL FROM SAS FOOTPRINT AND WITHIN A 5-FT PERIMETER AROUND THE SAS FOOTPRINT; REPLACE WITH FILL MATERIAL PER 310 CMR SEC. 15.255 (3) (SEE NOTE) ELEV: 21.65 BOTTOM OF CLT-12 LEGDE: NONE ENCOUNTERED (OWTS TH-1) PLACE 12" MIN., (6" MIN. ON LEDGE) OF CRUSHED STONE, LEVEL AND COMPACT ENTIRE SURFACE. TANK SHALL BE PLACED LEVEL, WELL SEATED, AND UN-DAMAGED. VACUUM TEST OR FILL WITH CLEAN WATER, NOTE DEPTH TO SURFACE, 24HRS NOTE ANY DROP. EFFLUENT DISCHARGE COLD WEATHER DISCHARGE ASSEMBLY 1,000 GAL. ORENCO BIOTUBE PROPAK PUMP PACKAGE 2 COMPARTMENT TANK OSI EFFLUENT PUMP PF100511 24" DIA. PVC RISER & LID 2" HIGH WATER ALARM/OVERRIDE TIMER 9.92 4" SCH 40 PVC INLET TEE ELEVATION OVER TANK: 18.90 MIN. SCH 80 PVC ELECTRICAL CONDUIT 15.92 14.67 14.50 EMERGENCY STORAGE (1 DAY) 11.75 PUMP OFF 11.50PUMP ON VOLUME PER DOSE LEACHFIELD VOLUME 2 ROWS X 48 FT = 96 FT V = πr²L = π(.17)² X 96 = 8.72 FT³ DOSE 60% TO 75% OF LEACHFIELD VOLUME 0.60 X 8.72 = 5.23 FT³ 0.75 X 8.72 = 6.54 FT³ USE 6.0 FT³ 6.0 FT³ X 7.481 GAL/FT³ = 44.88 GALLONS PER DOSE 16.50 PIPE INSULATION (IF NEEDED) PIPES SHALL BE CONNECTED WITH A WATERTIGHT SEALED FLEXIBLE JOINT FASTENED WITH A STAINLESS STEEL RETRACTABLE CLAMP. FROM SEPTIC TANK 4" SCH 40 PVC PIPE 1,000 GALLON SEPTIC TANK INSIDE AREA: 8.5 FT X 4 FT = 34 SF 34 SF X 7.481 GAL/FT³ = 254.35 GAL/FT / 12 IN = 21.20 GAL/IN FORCE MAIN DIMENSIONS: 106 FT X 2 IN DRAIN BACK VOLUME: 2.29 CU. FT = 17.16 GAL HIGH WATER ALARM/ OVERRIDE TIMER SET AT 2" BELOW INVERT IN. EMERGENCY STORAGE CAPACITY OF 1 DAY: 700 GAL/DAY / 21.20 GAL/IN = 33" PUMP ON TO BE SET 33" BELOW HIGH WATER ALARM/OVERRIDE TIMER DRAW DOWN: 44.88 + 17.16 = 62.04 62.04 GALLONS / 21.20 GAL/IN = 2.92" PUMP OFF TO BE SET 3" BELOW PUMP ON CUR-TECH SYSTEM PROFILE NTS PUMP CALCULATIONS NOT TO SCALE 1,000 SF ONE-COMPARTMENT PUMP TANK27 10.42 NOT TO SCALE TRENCH DRAIN DETAIL23 BECKER'S PACKAGE STORE 55 MA-28 WEST YARMOUTH, MA APRIL 18, 2025 AHARONIAN & ASSOCIATES, INC. ARCHITECTS 55 MA-28 WEST YARMOUTH, MA MAY 20, 2025 BECKER'S PACKAGE STOREAHARONIAN & ASSOCIATES, INC. ARCHITECTS AHARONIAN & ASSOCIATES, INC. ARCHITECTS 55 MA-28 WEST YARMOUTH, MA MAY 20, 2025 BECKER'S PACKAGE STORE AHARONIAN & ASSOCIATES, INC. ARCHITECTS 55 MA-28 WEST YARMOUTH, MA MAY 20, 2025 BECKER'S PACKAGE STORE 55 MA-28 WEST YARMOUTH, MA MAY 20, 2025 BECKER'S PACKAGE STOREAHARONIAN & ASSOCIATES, INC. ARCHITECTS 55 MA-28 WEST YARMOUTH, MA MAY 20, 2025 BECKER'S PACKAGE STOREAHARONIAN & ASSOCIATES, INC. ARCHITECTS Project Narrative and Stormwater Management Report For Becker’s Package Store Redevelopment A Proposed Mixed-Use Building Consisting of One Existing Commercial Unit & Two New Residential Units 55 Route 28 West Yarmouth, MA AP 36, Lots 77-79 Prepared for: Huzafia Corporation 58 Anchor Lane Cotuit, MA 02635 Image Courtesy of Aharonian & Associates, Inc. Submission Date: February 2026 Submitted by: Project Narrative and Stormwater Management Report February 2026 Becker’s Package Store Redevelopment - Mixed-Use Building 55 Route 28, West Yarmouth, MA 1 TABLE OF CONTENTS 1 INTRODUCTION ..................................................................................................... 2 2 SITE LOCATION AND PHYSICAL DESCRIPTION ......................................... 3 2.1 Soil Classification ................................................................................................. 4 2.2 Flood Zone Classification ..................................................................................... 5 2.3 Natural Resource Inventory .................................................................................. 6 2.4 Easements ............................................................................................................. 6 2.5 Zoning ................................................................................................................... 6 2.6 Existing Utilities ................................................................................................... 7 3 PROPOSED SCOPE OF WORK ............................................................................ 7 3.1 General .................................................................................................................. 7 3.2 Zoning ................................................................................................................... 8 3.3 Utilities .................................................................................................................. 9 3.4 Local Permit Requirements................................................................................... 9 3.4.1 Yarmouth Site Plan Review Committee ....................................................... 9 3.4.2 Yarmouth Design Review Committee .......................................................... 9 3.4.3 Yarmouth Historic Commission ................................................................... 9 3.4.4 Planning Board.............................................................................................. 9 3.4.5 Zoning Board of Appeals (ZBA) ................................................................ 10 3.4.6 Town of Yarmouth Department of Public Works....................................... 10 3.4.7 Town of Yarmouth Water Department ....................................................... 10 3.4.8 Town of Yarmouth Health Agent ............................................................... 10 4 STORMWATER MANAGEMENT PLAN .......................................................... 10 4.1 Compliance with Yarmouth Stormwater Management Regulations .................. 10 4.2 Existing Conditions ............................................................................................. 10 4.3 Proposed Conditions ........................................................................................... 11 4.4 Results Summary ................................................................................................ 12 5 Results and Conclusions ......................................................................................... 14 APPENDICES Appendix A: Test Hole Location Map and Logs Appendix B: Existing Condition Watershed Map Appendix C: Existing Condition HydroCAD Calculations Appendix D: Proposed Condition Watershed Map Appendix E: Existing Condition HydroCAD Calculations Project Narrative and Stormwater Management Report February 2026 Becker’s Package Store Redevelopment - Mixed-Use Building 55 Route 28, West Yarmouth, MA 2 1 INTRODUCTION On behalf of Huzafia Corporation, Joe Casali Engineering, Inc. (JCE) has prepared the following Project Narrative and Stormwater Management Report to identify existing and proposed site conditions related to a proposed land development project located at 55 Route 28 consisting of a new 7,964 sq. ft. total gross floor area (5,115 sq. ft. footprint), two-story, mixed-use building with a basement (4,174 sq. ft.). The following report has been prepared to discuss existing conditions, proposed conditions, and the permitting path for the proposed project. The exiting structure located at 55 Route 28 is a one-story commercial building occupied by “Becker’s Package Store.” While the building was constructed in 1935, it is not listed on the National Register of Historic Places. A portion of the existing structure will be razed to accommodate the new building addition, while the remaining portion of the building will be renovated. The first floor will be occupied Becker’s Package Store. The proposed second floor will be occupied by two, two-bedroom residential units. The three (3) lots will be combined per Zoning Bylaw §104.3.5(5) as an 81X Perimeter Plan. Project Narrative and Stormwater Management Report February 2026 Becker’s Package Store Redevelopment - Mixed-Use Building 55 Route 28, West Yarmouth, MA 3 2 SITE LOCATION AND PHYSICAL DESCRIPTION The project site consists of three (3) properties. Based on a October 2024 Boundary Survey performed by Waterman Engineering Company, AP 36, Lot 77 has a physical address of 55 Route 28 in West Yarmouth, Massachusetts and an area of 37,669 square feet (0.865 acres). AP 36, Lot 78 has a physical address of 49 Route 28 and an area of 9,711 square feet (0.223 acres). AP 36, Lot 79 has a physical address of 10 Drew’s Way and an area of 51,026 square feet (1.171 acres). The site contains a total of 98,406 square feet (2.26 acres) and has frontage on Route 28 (Main Street) to the north. The project site is bound by AP 36, Lot 76 (“EconoLodge Motel”) and AP 36, Lot 70 (vacant municipal land) to the east; AP 36, Lot 71 (single-family dwelling) to the east and south; AP 6, Lot 80 (single-family dwelling) to the south; and AP 36, Lots 82.2.1 and 82.2.2 (single-family dwellings), and AP 36, Lot 82.1 (“Relax Inn” motel). Refer to Figure 1 – Locus Map below. Figure 1 – Locus Map NOT TO SCALE Relax Inn Drew’s Way (Private Roadway) LOT 79 LOT 77 LOT 78 Econo- Lodge Days Inn LOT 82.1 LOT 82.2.1 LOT 82.2.2 LOT 71 LOT 80 Project Narrative and Stormwater Management Report February 2026 Becker’s Package Store Redevelopment - Mixed-Use Building 55 Route 28, West Yarmouth, MA 4 Lot 77 currently consists of a one-story, commercial structure occupied by Becker’s Package Store with associated parking areas. The remainder of the site is wooded / brush areas. Lot 78 currently consists of the remaining portion of the existing parking lot. Lot 79 is vacant with wooded / brush areas. A 12-foot-wide private right of way entitled “Drew’s Way” is located along the western property line of Lots 78 and 79. 2.1 Soil Classification According to the Web Soil Survey (WSS) operated by the US Department of Agriculture Natural Resources Conservation Service (NRCS), produced by the National Cooperative Soil Survey, the soils on-site consist entirely of Carver coarse sand, 3-8% slopes (252B). 252B soils consist of sandy glaciofluvial deposits. These soils have a low runoff class and are excessively drained. These soils have been assigned to the Hydrologic Soil Group ‘A’. Figure 2 – Soils Map NOT TO SCALE Site Location Soil Map Unit 252A 252B Project Narrative and Stormwater Management Report February 2026 Becker’s Package Store Redevelopment - Mixed-Use Building 55 Route 28, West Yarmouth, MA 5 Soil evaluations were completed on November 19, 2025 by Charlotte Speakman of Speakman Excavating, LLC and witnessed by Barry Lewis of the Yarmouth Board of Health to be utilized for the drainage design and the new on-site wastewater treatment system (OWTS). Four (4) test holes were completed within the project site. Due to the size of the test holes from caving, the health agent stated TH-1 can be identified as TH-1 and TH-2 for septic, and TH-3 can be identified as TH-3 and TH-4 for drainage. No groundwater or ledge was encountered. The septic test hole was determined to have a percolation rate greater than 2 minutes per inch. The location and test hole logs are included in Appendix A. 2.2 Flood Zone Classification The subject parcel is located on the Flood Insurance Rate Map (FIRM) for Barnstable County, Massachusetts (all jurisdictions) Panel 567 of 875, Town of Yarmouth, Map Number 25001C0567J, effective July 16, 2014. Based on this FIRM, the site and all adjacent sites are identified as Zone X – areas determined to be outside of the 0.2% annual-chance flood hazard area. Figure 3 – Flood Map NOT TO SCALE Site Location Project Narrative and Stormwater Management Report February 2026 Becker’s Package Store Redevelopment - Mixed-Use Building 55 Route 28, West Yarmouth, MA 6 2.3 Natural Resource Inventory According to the MassMapper GIS, there are no wetland features within or adjacent to the subject parcels. In addition, the subject parcel is not located within any known historic planning district, land conservation area or natural heritage area. The site is located within the Lewis Bay Watershed. Stormwater runoff from the site appears to sheet flow to an existing depression located on-site. 2.4 Easements Based on the October 2024 Boundary Survey performed by Waterman Engineering Company, the project site may be subject to the following easements, rights of way or agreements of record: • Rights and rights of others in, to and across that 12-foot-wide private right of way known as Drew’s Way” as described in Volume 460, Page 431 and Volume 456, Page 25. • Easements may exist for the utility poles and overhead wires depicted on the survey (no records found). 2.5 Zoning According to the Town of Yarmouth Zoning Bylaw and Zoning Map, the subject properties are currently located within the B2 Business Zone. The following are the current dimensional requirements for the B2 Zone: Requirement B2 Zone Req’d Minimum Lot Size 20,000 square feet Minimum Frontage 125 ft. Minimum Front Yard 30 ft. Maximum Side Yard 25 ft. Minimum Rear Yard 20 ft. Maximum Building Coverage 25% Maximum Impervious Coverage 70% Maximum Shape Factor 22 While the project site is also located within the Hotel/Model Overlay District 1 (HMOD1) and the Revitalization Overlay District (R.O.A.D.), it has been determined by the Site Plan Project Narrative and Stormwater Management Report February 2026 Becker’s Package Store Redevelopment - Mixed-Use Building 55 Route 28, West Yarmouth, MA 7 Review Committee that these overlays are not applicable to this project. The project site is also located within the Aquifer Protection District. 2.6 Existing Utilities Water: An 8-inch water main and a 16-inch water main exist within Main Street (Route 28). There is an existing 5/8-inch water service currently servicing the existing building. This water main is owned and maintained by the Yarmouth Water Department. The closest fire hydrant is located approximately 100 feet west of the subject property, on the opposite side of the street on Main Street. Sewer: There is currently no sewer available to the project site at this time. The existing building is currently serviced by an on-site wastewater treatment system (OWTS). Drainage: A public drainage main exists within Main Street. It appears the majority of stormwater runoff from the site sheet flows in a southerly direction to an existing depression within the site. Gas: A 6-inch PE gas main exists within Main Street. A 1/2-inch gas service provides gas to the existing building. These gas mains are owned and maintained by National Grid. Electric/Communications: Electric and communications services are available to the subject site via overhead lines on the north side of Main Street; owned and maintained by Eversource Energy. 3 PROPOSED SCOPE OF WORK 3.1 General The proposed project consists of approximately 7,964 sq. ft. total gross floor area (5,115 sq. ft. footprint), two-story, mixed-use building with a basement consisting of one (1) commercial unit and 2 residential units on the subject property. The two (2) residential units have been designed as two-bedroom units with one (1) bathroom each. The residential units will be located on the second floor, accessed via a stairwell that has its own separate means of access and egress separate from the commercial unit, located at the rear of the building. A portion of the existing structure will be razed to accommodate the new building addition, while the remaining portion of the building will be renovated. The first floor will be occupied Becker’s Package Store. Project Narrative and Stormwater Management Report February 2026 Becker’s Package Store Redevelopment - Mixed-Use Building 55 Route 28, West Yarmouth, MA 8 Access to the development will be provided via Main Street. The existing parking lot serving the site will be redesigned to accommodate the new building and the proposed change in use. 13 parking spaces are provided at the rear of the building for the residents and employees. The main parking lot provides parking for 17 vehicles, including one (1) van-accessible parking space and one (1) standard accessible parking space to comply with the Americans Disabilities Act. 3.2 Zoning As discussed previously, the subject property is located within the B2 Business Zone. The proposed mixed-use development is allowed by-right so long as the proposed multi-family use is in accordance with the provisions of Section 404 of the Zoning Bylaws. The following are the current dimensional requirements for the B2 Zone: Requirement B2 Zone Req’d Proposed (Lots 77 -79) Minimum Lot Size 20,000 square feet 98,406 sq. ft. Minimum Frontage 125 ft. 179.72 ft. Minimum Front Yard 30 ft. 12.3 ft.1 Maximum Side Yard 25 ft. 7.5 ft.2 Minimum Rear Yard 20 ft. 341.8 ft. Maximum Building Coverage 25% 5.2% Maximum Impervious Coverage 70% 25.6% Maximum Shape Factor 22 26.1 Notes: 1. Pre-existing, non-conforming condition. 2. Relief requested to extend a pre-existing, non-conforming condition. The Applicant seeks the following Special Permit with variance for this project: • To extend/maintain the existing/non-conforming nature of the existing building (side yard and front yard). • Special Permit requested to allow a duplex within the B2 Zoning District. • Relief requested from one in-lot tree required for every eight (8) cars. The project has been designed to adhere to the Yarmouth Architectural and Site Design Standards. Street trees are proposed to further define the street edge. A second story has been added to the building to accommodate a mix of uses. The potential loading area has been sited outside the primary visual corridors. Project Narrative and Stormwater Management Report February 2026 Becker’s Package Store Redevelopment - Mixed-Use Building 55 Route 28, West Yarmouth, MA 9 3.3 Utilities Water: The proposed redevelopment will require a new domestic water service connection and a new fire protection service connection from the existing water main in Main Street. Review and approval of the proposed domestic and fire protection service designs will be required by Town of Yarmouth Water Department. Sewer: The existing septic will need to be removed and disposed of to accommodate the building addition. The proposed redevelopment will require a new septic system to service the expanded mercantile and new residential use. Review and approval are required by the Yarmouth Health Agent in accordance with Massachusetts Title V Regulations. It should be noted that plans are in place for public sewer infrastructure to be installed within the adjacent highway, however the timeframe on the installation is unknown and does not appear to be occurring within the next 2 years. Drainage: The proposed redevelopment will require a Stormwater Management Permit filing with the Department of Public Works. Gas/Electric/Communications: Existing gas, electric and communications services will be maintained from existing infrastructure within or along Main Street. 3.4 Local Permit Requirements 3.4.1 Yarmouth Site Plan Review Committee The proposed mixed-use building was reviewed by the Site Plan Review Committee under Formal Site Plan Review on December 3, 2024. 3.4.2 Yarmouth Design Review Committee The proposed mixed-use building was reviewed by the Design Review Committee under Formal Review on May 6, 2025. 3.4.3 Yarmouth Historic Commission The proposed mixed-use building was reviewed by the Historic Commission at the July 30, 2025 meeting. 3.4.4 Planning Board The proposed mixed-use building will need to be reviewed by the Town of Yarmouth’s Planning Board for a Special Permit to allow a two-family dwelling use in the B2 Zoning District. Project Narrative and Stormwater Management Report February 2026 Becker’s Package Store Redevelopment - Mixed-Use Building 55 Route 28, West Yarmouth, MA 10 3.4.5 Zoning Board of Appeals (ZBA) The proposed mixed-use building will need to be reviewed by the Town of Yarmouth’s Zoning Board of Appeals (ZBA) for a Special Permit with a variance for an extension of a non-conforming structure (front and side yard setbacks). 3.4.6 Town of Yarmouth Department of Public Works The proposed development will need to submit a Stormwater Management Permit filing with the Department of Public Works. 3.4.7 Town of Yarmouth Water Department The proposed project will require review and approval from the Water Department for the new domestic and fire protection water services. 3.4.8 Town of Yarmouth Health Agent The proposed development will require approval from the Yarmouth Health Agent for the new septic system. 4 STORMWATER MANAGEMENT PLAN 4.1 Compliance with Yarmouth Stormwater Management Regulations The project is subject to the requirements of the Town of Yarmouth, Massachusetts, Stormwater Management Regulations (July 2021). Per the Yarmouth Stormwater Management Regulations, the project requires a Stormwater Management Permit from the Yarmouth Department of Public Works (DPW). 4.2 Existing Conditions The existing site is composed of two (1) watershed areas, discharging to two (2) design points, as shown on the Existing Conditions Watershed Map included in Appendix B. Under existing conditions, there is not a stormwater system servicing the project site. Existing HydroCAD Calculations are included in Appendix C. Design Point 1 – Public Drainage System within Main Street Watershed 1 consists of 27,870 square feet within the northern portion of the subject parcel. This watershed includes the parking area and the majority of the existing rooftop. This area has been assigned a minimum Time of Concentration (TC) of 7.1 minutes and a Composite Runoff Number (CN) of 75. Stormwater runoff from this area flows to an Project Narrative and Stormwater Management Report February 2026 Becker’s Package Store Redevelopment - Mixed-Use Building 55 Route 28, West Yarmouth, MA 11 existing catch basin within Main Street (Design Point 1). Stormwater runoff from this area is ultimately conveyed to Mill Pond. Design Point 2 – Existing Topographic Depression Watershed 2 consists of 120,192 square feet within the southern portion of the subject parcel and some adjacent properties. This watershed includes mostly wooded areas within the rear of the site. This area has been assigned a Time of Concentration (TC) of 32.3 minutes and a Composite Runoff Number (CN) of 44. Stormwater runoff from this area flows to an existing topographic depression within the site (Design Point 2). 4.3 Proposed Conditions The redevelopment project includes the renovation and expansion of the existing Becker’s Package Store into a 7,964 sq. ft. total gross floor area (5,115 sq. ft. footprint), two-story, mixed-use building with a basement consisting of one (1) commercial unit and 2 residential units. The project scope also includes improvements to the existing parking lot, new sidewalk areas, stormwater management improvements, utility modifications and landscaping improvements. In general, the proposed drainage patterns mimic existing conditions, discharging to the same design points as under existing conditions. The proposed project site is comprised of five (5) subwatersheds, as shown on the Proposed Conditions Watershed Map included in Appendix D. Water quality is achieved through one (1) crushed stone infiltration trench and an infiltration basin. The proposed stormwater management system has been designed to capture and treat the water quality volume in addition to reducing the peak stormwater runoff rates and volumes associated with the proposed building addition and parking lot improvements. Proposed HydroCAD Calculations are included in Appendix E. Design Point 1 – Public Drainage System Under proposed conditions, Watershed 1 is subdivided into two (2) subwatersheds, Watershed 1A and Watershed 1B. Subwatershed 1A consists of 10,082 square feet of mostly impervious area associated with the parking lot entrance and portion of the existing roadway (Drew’s Way). This area has been assigned a Time of Concentration (TC) of 7.9 minutes and a Composite Runoff Number (CN) of 765. Stormwater runoff from revised parking lot entrance is captured via a trench drain system that conveys stormwater to the proposed crushed stone infiltration trench for groundwater recharge and water quality. Excess treated stormwater runoff overflows the system and discharges to the public drainage system within Main Street (Design Point 1). Stormwater runoff from this area is ultimately conveyed to Mill Pond. Project Narrative and Stormwater Management Report February 2026 Becker’s Package Store Redevelopment - Mixed-Use Building 55 Route 28, West Yarmouth, MA 12 Subwatershed 1B consists of 3,216 square feet of mostly new grass and landscaped areas in front of the store. This subwatershed has been assigned a CN of 56, and a minimum Tc of 6.0 minutes. Stormwater runoff from this subwatershed sheet flows to the existing public drainage system within Main Street (Design Point 1). Design Point 2 – Existing Topographic Depression Under proposed conditions, Watershed 2 is subdivided into three (3) subwatersheds, Watershed 2A, Watershed 2B, and Watershed 2C. Watershed 2A consists of 98,998 square feet of mostly pervious area associated with the rear of the site. Improvements within this area consist of regrading to the extend the existing topographic depression and to accommodate the new septic system. This area has been assigned a Time of Concentration (TC) of 32.3 minutes and a Composite Runoff Number (CN) of 41. Stormwater runoff from the rear of the site sheet flows to the existing topographic depression within the site (Design Point 2). Subwatershed 2B consists of 30,651 square feet of mostly impervious areas associated with the remaining improved parking lot. This subwatershed has been assigned a CN of 77, and a minimum Tc of 6.0 minutes. Stormwater runoff from this subwatershed sheet flows to the proposed sediment forebay for pre-treatment then the infiltration basin for groundwater recharge and water quality. Excess stormwater overflows the system and is conveyed to the existing topographic depression (Design Point 2). Subwatershed 2C consists of 5,115 square feet associated with the new building’s roof. This subwatershed has been assigned a CN of 98, and a minimum Tc of 6.0 minutes. Stormwater runoff from this subwatershed is conveyed via roof drains directly to the infiltration basin for groundwater recharge and water quality. Excess stormwater overflows the system and is conveyed to the existing topographic depression (Design Point 2). 4.4 Results Summary A runoff analysis of the pre- and post-construction conditions was completed using the TR-20 methodology and is summarized in tables below. Supporting calculations are included in Appendices C and E. Project Narrative and Stormwater Management Report February 2026 Becker’s Package Store Redevelopment - Mixed-Use Building 55 Route 28, West Yarmouth, MA 13 Table 4.1: Watershed Data Area (SF) CN Tc (min) Existing Condition Watershed 1 27,870 75 7.1 Watershed 2 120,192 44 32.3 Total Area 148,062 50 -- Proposed Condition Watershed 1A 10,082 76 7.9 Subwatershed 1B 3,216 56 6.0 Subwatershed 2A 98,998 41 32.3 Subwatershed 2B 30,651 77 6.0 Subwatershed 2C 5,115 98 6.0 Total Area 148,062 53 -- ∆ 0 +3 -- Note: Minimum Tc = 6 min. As shown in Table 4.1 above, the overall watershed area is unchanged when comparing existing to proposed conditions. The CN increases from 50 to 53 when comparing existing to proposed conditions; this can be attributed to the increase in impervious area associated with the proposed site improvements. Table 4.2: Stormwater Runoff Discharge Rates Peak Discharge (cfs) 1-yr 2-yr 10-yr 25-yr 100-yr Design Point 1 – Public Drainage System Existing Peak Discharge Rate 0.50 0.80 1.68 2.40 4.02 Proposed Peak Discharge Rate 0.09 0.25 0.65 0.97 1.69 ΔQ -0.41 -0.55 -1.03 -1.43 -2.33 Design Point 2 – Topographic Depression Existing Peak Discharge Rate 0.00 0.00 0.00 0.00 0.00 Proposed Peak Discharge Rate 0.00 0.00 0.00 0.00 0.00 ΔQ 0.00 0.00 0.00 0.00 0.00 Project Narrative and Stormwater Management Report February 2026 Becker’s Package Store Redevelopment - Mixed-Use Building 55 Route 28, West Yarmouth, MA 14 Table 4.3: Stormwater Total Runoff Volume Volume (cf) 1-yr 2-yr 10-yr 25-yr 100-yr Design Point 1 – Public Drainage System Existing Total Stormwater Runoff 1,789 2,699 5,501 7,821 13,186 Proposed Total Stormwater Runoff 138 374 1,274 2,107 4,185 ΔV -1,651 -2,325 -4,227 -5,714 -9,001 Design Point 2 – Topographic Depression Existing Total Stormwater Runoff 0 0 0 0 0 Proposed Total Stormwater Runoff 0 0 0 0 0 ΔV 0 0 0 0 0 As shown in Tables 4.2 and 4.3 above, by implementing stormwater mitigations areas including an infiltration basin and stone trench, reductions in peak stormwater runoff rates and total stormwater runoff volumes are achieved for the 1-, 2-, 10-, 25-, and 100-yr design storm events. In addition, the infiltration systems significantly exceed the water quality volume requirements, as required per the Massachusetts Stormwater Handbook. The existing topographic depression within the site holds and infiltrates all stormwater runoff conveyed to it during both pre- and post- design storm events. Under proposed conditions, the existing topographic depression has been expanded to tie-into the proposed grade. 5 RESULTS AND CONCLUSIONS The redevelopment project includes the renovation and expansion of the existing Becker’s Package Store into a two-story, mixed-use building consisting of one (1) commercial unit and 2 residential units. The project scope also includes improvements to the existing parking lot, new sidewalk areas, stormwater management improvements, utility modifications and landscaping improvements. The site has been designed in general accordance with the Town’s Zoning By-Laws. The proposed stormwater management plan mimics existing conditions by discharging all of the site’s stormwater runoff to the same locations as under existing conditions. The stormwater management system utilizes one (1) infiltration basin and one (1) stone infiltration trench to control and improve the quality of the stormwater runoff leaving the Project Narrative and Stormwater Management Report February 2026 Becker’s Package Store Redevelopment - Mixed-Use Building 55 Route 28, West Yarmouth, MA 15 site associated with the development. For the 1-, 2-, 10-, 25-, and 100-year design storm events, the peak stormwater runoff rates and volumes have decreased or remained the same from existing to proposed conditions. The stormwater management system as designed will not have any negative impacts to the neighboring properties or the public drainage system within Main Street.