Loading...
HomeMy WebLinkAbout792-792-11158 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:4/1/2026 Contract Number:146 Concrete Supplier:Cape Cod Ready Mix PLACEMENT INFORMATION Date Cast: 3/18/2026 Time Cast: 10:30 AM Date Received: 3/19/2026 Placement Location:SPR 32, 39, 44, 53 Placement Method:PUMP Cylinders Made By:Kellie Jigerjian Material Type:Concrete Cylinders Placement Vol. (yd ): Aggregate Size (in):1 1/2 Cylinder Size:6 x 12 INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures:SIKA 75, 1% NONCHLORIDE, ACCELERATOR (LAST 40 CY) TEST RESULTS Slump (in) (C-143):9 3/4 Air Content (%) (C-231):4.1 Air Temp (°F):30 Conc. Temp (°F) (C-1064):64 Load Number:24 Mixer Num.:67 Ticket Num.:50877 Cubic Yards:10 Design (psi):4500 Batch 9:42 AM Arrive 10:05 AM Depart Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-111A N 29.10 6 28.32 3/25/2026 Lab Unbonded 7 3 114.75 4060 792-111B N 29.00 6 28.27 4/1/2026 Lab Unbonded 14 5 117.98 4170 792-111C 28.95 4/15/2026 Lab 28 792-111D 28.75 4/15/2026 Lab 28 792-111E 28.65 HOLD Lab 0 3 2 Remarks:Kaylie OSullivan Reviewed By