Loading...
HomeMy WebLinkAboutCon Comm_Mtg_04-02-26South Yarmouth Wireless Communications Facility 1044 Route 28 Yarmouth, Massachusetts Request to Amend Order of Conditions MassDEP File #083-2382 1 Project Description Project History - Original NOI Filed on 2/26/2023 - MassDEP File #083-2382 - Public Hearing on 4/4/2023 - No comments from Con Comm - OOC issued on 4/13/2023 Original 2022 WCF Design - Facility sited in parcel woods - 55 ft X 60 ft fenced compound - Clock tower antenna design – 119.6 ft AMSL - Stormwater infiltration basin – design input from CCC staff - Access from church parking lot However, Yarmouth ZBA requested reduced visibility… Town appeal 2 Project Description BST went back to revisit the design New 2026 WCF design: Retains: - 100ft X 100ft lease area - 55 ft X 60 ft fenced compound - Same infiltration basin design - Access from church parking lot Changes: - Shifted compound 22 ft west & up +1ft - 93ft steel mono-pole; 96ft AMSL - Shifted driveway South ~20ft 3 2026 Facility Compound Plan 4 2026 Tower Elevation 2022 vs 2026 Facility Designs 2022 Elevation 5 Looking Northwest at the church and parking lot Looking Southwest at the proposed WCF access location Site Photos 6 Looking Southwest near proposed WCF access driveway Looking West at the proposed WCF compound location Site Photos 7 Resource Areas No BVW/Bank/BLSF/LUWW/RFA No NHESP Rare or Endangered Species/Habitat No Certified or Potential Vernal Pools No Areas of Critical Environmental Concern (ACEC) No Outstanding Resource Waters (ORW) No Well Head Protection Areas 8 Land Subject to Coastal Storm Flowage WCF remains sited within FEMA Zone X and Zone AE. 3,516 ft2 of 2026 footprint sited within LSCSF LSCSF impact reduced by ~328 ft2 from the approved 2022 design/original OOC 9 Mitigation/BMP’s New design shifts footprint West and up in elevation ~1ft - Reduces visibility and footprint in LSCSF (Zone AE) by ~328 ft2 Stormwater Management - Designed with CC Commission review/input – Regional Policy Plan Infiltration Basin - 25yr/24hr storm event/No impact on flooding in 100-yr event First 1” of stormwater runoff treated through basin exfiltration 80% of TSS will be attenuated/removed Design meets CCC Regional Policy Plan Objectives: WR1 – protect and preserve groundwater quality WR2 – protect, preserve, and restore freshwater resources WR4 – manage stormwater to protect and preserve H20 quality Sediment & Erosion controls BMP’s during construction S&E control/construction entrance/dewatering basin/concrete washouts 10 Summary Enhance wireless service coverage for public/emergency services New design addresses ZBA’s/Town’s concerns No resource area impacts except LSCSF (similar to the approved NOI/OOC) - Reduces footprint in Zone AE and LSCSF impacts by ~ 328ft2 Stormwater design meets regulatory requirements & consistent with CCC’s RPP Project will implement construction BMP’s Achieves applicant goals & meets protective interests of the WPA/Bylaw Applicant respectfully request the Commission approve the request to Amend OOC 11 Questions/Discussion Contact Info: Jeff Mason Project Manger / Wetland Scientist Lucas Environmental, LLC. jam@lucasenviro.com (805) 895 – 3571 12 13 14 Facility Compound Plan 15 Tower Detail & Elevations Planting Plan 16 Erosion Control Plan 17