HomeMy WebLinkAboutCCOR 04-02-2026 792-114Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. , , • Tel • www.swcole.com Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:4/2/2026 Client:Wright-Pierce Client Rep:Eric SaloWeather:Cloudy 40 - 45°F S.W.COLE Rep:Alexander Charnitsky General Contractor:Nickerson Time Onsite:12:30 - 14:00Placement Type: Footing  Wall  Slab  Other: Column Placement Location:Process Building Columns Concrete Placement Observations Observed Comments Required mix used Yes 4500psi, 1 1/2", Sika 75 Concrete properly conveyed to all areas of placement Yes Crane and Hopper Internal vibration / consolidation of concrete Yes Handheld vibrator Even layering around openings and embedments Yes Concrete evenly layered and vibrated around openings and embedments Post placement observations (finishing, curing, etc.)Yes Concrete Manually Finished Field Testing of Concrete performed:Yes *CYLINDER SET NO:792-114  *Refer to associated concrete test report Notes: S.W Cole Construction Services Technician AEC arrived onsite at 12:30PM for concrete testing and sampling for the locations referenced above Concrete arrived onsite at 1:05PM (load 1) carrying 5.5CY of 4500psi 1 1/2", with SIKA control 75 added prior placed via pump truck One set of tests were performed with the following results Load 1: Slump: 7" Air content: 3.5% Concrete Temperature: 65F One set of compression cylinders was cast for testing at 4, 7, 14, 28 (2). After testing AEC packed up equipment, had time corroborated, and left at 2:00PM Attachments: 2 Photos Reviewed by:4/3/2026 Kaylie OSuivKaylie OSullivan Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. , , • Tel • www.swcole.com