HomeMy WebLinkAboutCCOR 03-11-2026 792-105 to 792-107Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. , , • Tel • www.swcole.com Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:3/11/2026 Client:Wright-Pierce Client Rep:CDM smith Weather:Clear 35 - 51°F S.W.COLE Rep:Jorge Goncalves General Contractor:CDM smith Time Onsite:05:30 - 11:00 Placement Type: Footing  Wall  Slab  OtherPlacement Location:SPR slabs 49,51,59 Notes: S.W. Cole Engineering Construction Services Technician Jorge Goncalves arrived onsite at 5:30 A.M. for "Concrete Field Testing" for the placement location referenced above. Upon arrival, met with Eric from "CDM Smith, Inc. " who provided information about today's job duties. Concrete was delivered by "Cape Cod Ready Mix" and was a 1-1/2” Aggregate, 4500psi, Concrete Mix with Sika Control 75. A total of 250 yards of concrete were ordered. JDG took 3 test and did 3 sets of cylinders for the lab. Test Results#1(load 1) slump: 7 3/4" air content: 4.9% concrete temp: 72 Test Results #2 (load 11) slump: 8 1/2" Air: 3.6% Concrete temp: 78 Test Results #3 (load 21) slump: 8 1/4" air: 3.3% concrete temp: 70 These results were all given to Eric from CDM smith before leaving the jobsite.   Attachments: 2 Photos Reviewed by:4/7/2026 Kaylie OSuivKaylie OSullivan Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. , , • Tel • www.swcole.com