HomeMy WebLinkAboutCOC request 75 4.10.2026
Engineers
Environmental Scientists
Software Developers
Landscape Architects
Planners
Surveyors
349 Main Street, Route 28, Unit D / West Yarmouth, MA 02673 / 508-778-8919
703 Route 28, South Yarmouth
Request for Certificate of Compliance
Construction of Rip Rap Seawall
Town of Yarmouth
Conservation Commission
April 2026
Prepared for:
Steven Katz
99 Sullivan Road
West Yarmouth, MA 02673
BSC Job #0101264.00
Engineers
Environmental Scientists
Software Developers
Landscape Architects
Planners
Surveyors
349 Main Street, Route 28, Unit D / West Yarmouth, MA 02673 / 508-778-8919
APRIL 10, 2026 www.bscgroup.com
Town of Yarmouth
Conservation Commission
1146 Route 28
South Yarmouth, MA 02664
Attn: Brittany DiRienzo, Conservation Agent
RE: Request for Certificate of Compliance (OOC SE83-075), 703 Route 28, South Yarmouth, Rip Rap
Seawall, BSC Job #0101264.00
Dear Ms. DiRienzo and Members of the Yarmouth Conservation Commission,
BSC Group, Inc. (BSC) is filing this Request for a Certificate of Compliance (RCOC) on behalf of Steven Katz (the
applicant) for a project that was completed at 703 Route 28, South Yarmouth, Massachusetts (the Site). The Order of
Conditions (OOC SE83-075) was issued on March 15th, 1979, and referenced a plan titled “Plan to Accompany Petition
of Gordon Gardiner et ux To Place and Maintain Rip Rap and Fill in Parkers River – Revised November 1978.” The
approved project was to construct a rip rap seawall along the perimeter of the property along Parker’s River.
Neither BSC, nor the current owner and applicant were involved with the permitting or construction done for the
approved project. However, the approved project does appear to have been completed in compliance with the
approved plans and OOC. During BSC’s existing conditions survey, BSC surveyed the location of the seawall. Based
on BSC’s survey and the approved plans, the seawall appears to be constructed in the correct location. As such, we
are requesting that a certificate of compliance be issued to close out the OOC.
This application is being submitted in accordance with the Massachusetts Wetlands Protection Act and the Town of
Yarmouth Wetlands Protection By-law. If you have any questions or need additional information, please contact our
office at 508-778-8919 or by email at PMancuso@BSCGroup.com or MCreighton@BSCGroup.com.
Sincerely,
BSC Group, Inc.
Kieran Healy, PLS CFM
Senior Associate, Survey Manager
cc: MassDEP, Southeast Regional Office
Steven Katz, 99 Sullivan Road, West Yarmouth, MA 02673
Yarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664-4492
Tel. (508)-398-2231 Ext. 1288 • Fax (508)-398-0836 • TTD# (508) 398-2231 • bdiriezno@yarmouth.ma.us Rev 12/2025
Administrative Checklist
Certificate of Compliance
General Information:
• All filings must be made on Town of Yarmouth forms.
• All applications must be submitted two weeks prior to the next scheduled Conservation
Commission meeting. Refer to Meeting Schedule.
• Failure to follow the Administrative Checklist shall result in an Administrative Incomplete
Application and will not be scheduled for a Public Hearing.
• Contact the Conservation Office if you need assistance.
Submitting an Application:
Hardcopy of the COC application mailed to or dropped off at the conservation Office
In Town Hall.
Signed statement from an Engineer or similar professional who prepared the
approved plan stating the date of a recent site inspection and certifying compliance
with the permit and outlining departures from the approved plan, if any exist.
If mitigation planting was required, include planting date and confirm the required
time has elapsed*.
As-Built plan – *Refer to issued Order of Conditions: Special Conditions to determine
if required*.
PDF of the COC request including application, letter, and as-built plan (if needed)
emailed to bdirienzo@yarmouth.ma.us and jjerolimo@yarmouth.ma.us
Local filing fee. Refer to the Fee Schedule. Make check payable to “Town of Yarmouth”
and include property address in memo.
All forms, Fee Schedule and Meeting schedule can be found at
https://www.yarmouth.ma.us/696/Filing-Forms.
*Click Yarmouth Street Index for parcel-related Conservation documents.
CONSERVATION
OFFICE
wpaform8a.doc •• rev. 5/29/14 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A – Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
DEP File Number:
SE83-075
Provided by DEP
A. Project Information
Important:
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
1. This request is being made by:
Steven Katz
Name
99 Sullivan Road
Mailing Address
West Yarmouth
City/Town
MA
State
02673
Zip Code
Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to:
Gordon P. Gardiner et ux
Applicant
3/15/1979
Dated
SE83-075
DEP File Number
Upon completion
of the work
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
3. The project site is located at:
703 Route 28
Street Address
South Yarmouth
City/Town
33
Assessors Map/Plat Number
120
Parcel/Lot Number
4. The final Order of Conditions was recorded at the Registry of Deeds for:
Property Owner (if different)
Barnstable
County
1102
Book
495
Page
Certificate (if registered land)
5. This request is for certification that (check one):
the work regulated by the above-referenced Order of Conditions has been satisfactorily completed.
the following portions of the work regulated by the above-referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a.doc •• rev. 5/29/14 Page 2 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A – Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
DEP File Number:
SE83-075
Provided by DEP
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office-
for-your-city-or-town.html).
Request For Certificate of Compliance: SE83-075
703 Route 28
South Yarmouth, MA 02664
Photo Page 1
Photo #1: View of the the existing Site and rip rap seawall looking from the Parker’s River bridge. Facing southeast
Photo #2: View of the existing rip rap seawall looking from the Parker’s River bridge. Facing south