HomeMy WebLinkAboutSWP 2025-002 recorded 4.6.2026Doc:1,541,398 04-06-2026 8:14 Town of Yarmouth Stormwater By -Law Chapter 145 Yarmouth File Number 101 Stormwater Management Permit SW2025-002 A. Genera! Information Important: Yarmouth When filling ? From: Conservation Commission out forms on 2 To. the computer, Applicant. use only the Matthew T tab key to a. First Name move your cursor- do Boston Gas Company not use the c. Organization return key. 170 Data Drive d. Mailing Address Waltham e. CitylTown 3. Property Owner (if different from applicant)- 4 a. First Name Boston Gas Company C. Organization 170 Data Drive d. Mailing Address Waltham MA e. City/Town f. State Project Location.- Wozniak, PE b. Last Name MA 02451 f. State g. Zip Code b. Last Name 02451 g. Zip Code 127 Whites Path Yarmouth a. Street Address b. CitylTown 98 81 c. Assessors Map/Plat Number d. Parcel/Lot Number 41,688790-70.201250 Latitude and Longitude, if known: e. Latitude f Longitude 5. Property recorded at the Registry of Deeds for (attach additional information if more than one parcel): Ra rnfita h I P a. County b. Certificate Number (if registered land) See attached schedule 1 A c.Book d.Pa9e 12112/2025 2/19/2026 2/27/2026 6. Dates. a. Date of Application b. Date Public Hearing Closed c. Date of Issuance 7. Final Approved Plans and Other Documents (attach additional plan or document references as needed). - a. Plan Title b. Prepared By d Final Revision pate See attached page 1A f. Additional Plan or Document Title c. Signed and Stamped by e. Scale g. Date Please return to: Page I of See attached Schedule 1A Grace Walsh 1 Legal Dept. National Grid 170 Data Drive Waltham, MA 02451 Doc:1,541,398 04-06-2026 8:14 Page 2 of 9 STORMWATER MANAGEMENT PERMIT PAGE 1A OF 7 SW2025-002, Boston Gas Company DBA National Grid 127 Whites Path, Yarmouth MA Approved Plans and Materials • "South Yarmouth LNG Permit Drawings" Prepared by Tighe & Bond; stamped by Brian S. Huntley, PE and Timothy J. Grace, PE (8 sheets). 1. "Cover Sheet" G-001 REV2 final revision date 12/8/2025 2. "General Notes, Legend & Abbreviations" G-002 REV2 final revision date 12/8/2025 3. "Existing Conditions Site Plan" C-101 REV3 final revision date 1218/2025 4. "Erosion Control & Site Demolition Plan" C-102 REV2 final revision date 12/8/2025 5. "Site Layout & Materials Plan" C-103 REV2 final revision date 12/8/2025 6. "Grading & Drainage Plan" C-104 REV4 final revision date 218/2026 7. "Site Details - 1" C-201 REV3 final revision date 2/8/2026 8. "Site Details - 2" C-202 REV3 final revision date 2/8/2026 • "Stormwater Management Report" dated December 2025 Revised February 2026; Prepared by Tighe & Bond; stamped by Timothy J. Grace, PE (242 pages). • "Long -Term Pollution Prevention and Stormwater Management System Operation and Maintenance Plan" dated December 2025 (19 pages). • "Engineering Review of Stormwater Management Permit Application" dated 2/4/2026; Weston & Sampson Engineers, Inc.; signed by James I. Pearson, PE. (5 pages). • "127 Whites Path - South Yarmouth LNG Response to Peer Review Comments' dated 2/9/2026; Tighe & Bond; Signed by Timothy J. Grace, PE (6 pages). • "Engineering Review of Stormwater Management Permit Application — SECOND REVIEW" dated 2/11/2026; Weston & Sampson Engineers, Inc.; signed by James I. Pearson, PE. (5 pages). Page I A of 7 Doc:1,541,398 04-06-2026 8:14 Page 3 of 9 Town of Yarmouth Stormwater By -Law Chapter 145 `o,l Yarmouth File Number. Stormwater Management Permit SW2025-002 a. te• B. Findings Findings pursuant to the Yarmouth Stormwater By -Law Chapter 145: This Commission hereby finds the project, as proposed. is (check one of the following boxes) Approved subject to: a ® the following conditions which are necessary in accordance with the stormwater standards set forth in the Yarmouth Stormwater Regulations. This Commission orders that all work shall be performed in accordance with the Stormwater Management Permit Application referenced above, the following General Conditions, and any other special conditions attached to this Permit. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the application, these conditions shall control Denied because. b. ❑ the proposed work cannot be conditioned to meet the stormwater standards set forth in the Yarmouth Stormwater Regulations. Therefore, work on this project may not go forward unless and until a new Stormwater Management Permit Application is submitted which provides measures that are adequate to protect these standards, and a final Stormwater Management Permit is issued. A description of the stormwater standards which the proposed work cannot meet is attached to this Permit. c. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the stormwater standards identified in the Yarmouth Stormwater Regulations. Therefore, work on this project may not go forward unless and until a revised Stormwater Management Permit Application is submitted which provides sufficient information and includes measures which are adequate to protect the stormwater standards, and a final Stormwater Management Permit is issued. A description of the specific information which is lacking and why it is necessary is attached to this Denial. Page 01 , Doc:1,541,398 04-06-2026 8:14 Page 4 of 9 �ra'oFC Town of Yarmouth Stormwater By -Law Chapter 145 Yarmouth File Number Stormwater Management Permit SW2025-002 C. General Conditions (only applicable to approved projects) 1. This Permit shall apply to any successor in interest or successor in control of the property subject to this Permit and to any contractor or other person performing work conditioned by this Permit. 2. This Permit is not final until all administrative appeal periods described in the Yarmouth Stormwater By - Law have elapsed, or if such an appeal has been taken, until all proceedings before the courts have been completed 3. This permit shall be recorded at the Barnstable County Registry of Deeds. In the case of recorded land. the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Permit shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done The recording information shall be submitted to this Conservation Commission on the form at the end of this Permit, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 4. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Permit 5. Noncompliance with these conditions shall constitute grounds for enforcement and possible fines. Fines shall not exceed $300.00 per daylper violation. & The Permit does not grant any property rights or any exclusive privileges, it does not authorize any injury to private property or invasion of private rights. 7. This Permit does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. 8. The work authorized hereunder shall be completed within three years from the date of this Permit. 9. This Permit may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Permit. 10 The work shall conform to the plans and special conditions referenced in this Permit. Any change in the approved plan(s) shall require the Applicant to file, in writing, a notice of project change with this Commission. The Commission will determine the significance of the change and determine whether administrative approval or an amendment to the Permit is required. Should the project be changed without permission, or found by the Yarmouth Conservation Commission to be altered in any way from the approved plan(s), all work will immediately cease until the project is reapproved by the Commission. 11. A preconstruction review shall be arranged by the contractor with the Conservation Administrator and shall occur prior to the commencement of any work. 12 The applicant/owner shall be responsible for having a copy of the "Stormwater Management Permit" on the job site at all times and shall be responsible for insuring that all persons performing the permitted activity are fully aware of its terms and conditions. Failure to do so may result in the revocation of this "Permit". a fine or both 13. The Department of Municipal Inspections and/of the Conservation Commission and its duly appointed representatives shall have the right to enter and inspect the area subject to this Permit at reasonable hours to evaluate compliance with the conditions stated in this Permit, and may require the submittal of any data deemed necessary by the Department of Municipal Inspections and/or the Conservation Commission for that evaluation 14 All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Department of Municipal Inspections and/or the Conservation Commission, which reserves the right to require additional erosion Pane l of Doc:1,541,398 04-06-2026 8:14 Page 5 of 9 of YAK Town of Yarmouth Stormwater By -Law Chapter 145 moo: Yarmouth File Number o Stormwater Management Permit SW2025-002 and/or damage prevention controls it may deem necessary 15. The owner of the property covered by this Permit, or their successors in title, shall be responsible for the maintenance and operation of all components of the Stormwater Management System in accordance with the Operation and Maintenance schedule provided with the approved plans. This condition is ongoing and does not expire with the issuance of a Certificate of Completion. 16. Upon completion of the project, a request for a Certificate of Completion shall be submitted by the applicant to the Conservation Commission for review. The Stormwater Management Permit shall be considered incomplete until the Certificate of Completion is issued by the Conservation Commission and recorded at the Registry of Deeds. 17 All work, including site preparation, land disturbance, construction and redevelopment, shall be implemented in accordance with the construction period pollution prevention and erosion and sedimentation control plan and, the Stormwater Pollution Prevention Plan. Construction period erosion, sedimentation and pollution control measures and best management practices (BMPs) shall remain in place until the site is fully stabilized. 18. No stormwater runoff may be discharged to the post -construction stormwater BMPs unless and until a Registered Professional Engineer provides a Certification that: i. all construction period BMPs have been removed or will be removed by a date certain specified in the Certification. For any construction period BMPs intended to be converted to post construction operation for stormwater attenuation, recharge, and/or treatment, the conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation, including removal of all construction period sediment trapped in inlet and outlet control structures; ii as -built final construction BMP plans are included, signed and stamped by a Registered Professional Engineer, certifying the site is fully stabilized; In any illicit discharges to the stormwater management system have been removed; IV. all post -construction stormwater BMPs are installed in accordance with the plans (including all planting plans) approved by the issuing authority, and have been inspected to ensure that they are not damaged and that they are in proper working condition; V. any vegetation associated with post -construction BMPs is suitably established to withstand erosion. 19. The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed responsibility for BMP maintenance. Prior to requesting a Certificate of Completion, the responsible party shall execute and submit to the issuing authority an Operation and Maintenance Compliance Statement ("O&M Statement) for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operation and Maintenance Plan ("O&M Plan") and certifying the following: i. the O&M Plan is complete and will be implemented upon receipt of the Certificate of Completion, and the future responsible parties shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and implement the Stormwater Pollution Prevention Plan. 20. Post -construction pollution prevention and source control shall be implemented in accordance with the long-term pollution prevention plan section of the approved Stormwater Report and the Stormwater Pollution Prevention. 21. Unless and until another party accepts responsibility, the landowner, or owner of any drainage easement.. assumes responsibility for maintaining each BMP. To overcome this presumption, the Rage 4 of 7 Doc:1,541,398 04-06-2026 8:14 Page 6 of 9 Town of Yarmouth Stormwater By -Law Chapter 145 Yarmouth File Number: 0`, Stormwater Management Permit sw2025-002 rHf4 _s1 landowner of the property must submit to the issuing authority a legally binding agreement of record, acceptable to the issuing authority, evidencing that another entity has accepted responsibility for maintaining the BMP, and that the proposed responsible party shall be treated as a permittee for purposes of implementing the requirements of Conditions 22 through 26 with respect to that BMP Any failure of the proposed responsible party to implement the requirements of Conditions 21 through 26 with respect to that BMP shall be a violation of the Stormwater Management Permit or Certificate of Completion. In the case of stormwater BMPs that are serving more than one lot, the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs A plan and easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted along with the legally binding agreement. 22. The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans, the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook and the Yarmouth Stormwater Bylaw 23. The responsible party shall: i. Maintain an operation and maintenance log for the last three (3) consecutive calendar years of inspections, repairs, maintenance and/or replacement of the stormwater management system or any part thereof, and disposal (for disposal the log shall indicate the type of material and the disposal location) ii Make the maintenance log available to the Department of Municipal Inspections and/or the Conservation Commission ("Commission") upon request, and iii Allow members and agents of the Department of Municipal Inspections and/or the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance with the requirements for each BMP established in the 0&M Plan approved by the issuing authority. iv Submit an annual certification. due November 1st each year, documenting 1) how non-structural and good housekeeping practices over the last 12 months adhered to the O&M Plan; and 2) the work that has been done over the last 12 months to properly operate and maintain the stormwater control measures The certification shall be signed by the owner. Once every five years, beginning on the fifth year of maintenance, such certification must be prepared by a registered Professional Engineer and signed by both the Engineer and the Owner. 24. All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable federal, state, and local laws and regulations 25, Illicit discharges to the stormwater management system as defined in Chapter 145 Section 1.02 are prohibited. 26. Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit (as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1, Low Impact Development Site Design Credits) shall not be altered without the prior written approval of the issuing authority. 27. Access for maintenance, repair, and/or replacement of BMPs shall not be withheld. Any fencing constructed around stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage. D. Special Conditions 1. The applicant shall submit a copy of the SWPPP prior to any ground disturbance pygp ,f- Doc:1,541,398 04-06-2026 8:14 Page 7 of 9 of Town of Yarmouth Stormwater By -Law Chapter 145 Yarmouth File Number: y Stormwater Management Permit SW2025-002 •n9Fi . t. Issuance _-3 This Permit is valid for three years, unless otherwise specified as a special condition pursuant to General Conditions #4, from the date of issuance. 1 Date of issuance Please indicate the number of members who will sign this form: This Permit must be signed by a majority of the Conservation Commission 2 Number of Signers The Permit must be mailed by certified mail (return receipt requested) or hand delivered to the applicant and the property owner, if different from applicant. Sig This Permit is issued to the applicant as follows ❑ by hand delivery on L�(by certified mail, return receipt requested. on L' y C Date Date Section F, Recording Information is available on the following page. Page r; 0 T Doc:1,541,398 04-06-2026 8:14 Page 8 of 9 Town of Yarmouth Stormwater By -Law Chapter 145 40: 4 Stormwater Management Permit F. Recording Information This Stormwater Management Permit must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of tale of the affected property. In the case of recorded land, the Stormwater Management Permit shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Permit. In the case of registered land, this Permit shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Permit. The recording information on this page shall be submitted to the Conservation Commission listed below. Yarmouth _ Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission To: Yarmouth Conservation Commission Please be advised that the Permit for the Project at: 127 Whites Path SW2025-002 Project Location Permit Number Has been recorded at the Registry of Deeds of Barnstable County Book for Property Owner and has been noted in the chain of title of the affected property in Page In accordance with the Permit issued on. Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant Yarmouth File Number: SW2025-002 Page Page 7 or Doc:1,541,398 04-06-2026 8:14 Page 9 of 9 YARMOUTH - Stormwater Management Permit - Supplemental Page 1A Barnstable Registry of Deeds Boston Gas Company South Yarmouth LNG Yanuouth File SW2025-002 No Property Address Yarmouth, MA Parcel/Lot No. Property Interest Owner Name Legal File # Recording Information 1 127 Whites Path 98/81 Boston Gas Company** 401 YARMMA GEN 00004 (i) Land Court Certificate 170 Data Drive of Title No. 46050; Waltham, MA 02451 (ii) Land Corot Certificate **Cape Cod Gas Company- of Title No. 59716; changed its name from Buzzards Bay Gas Company- as of (iii) Land Count Certificate 10/25/1972, see Certificate of Title No. 84810; recorded as Land Court Document No. 187900 (iv) Book 1499 Page 992; (v) Book 3253 Page 110; **Colonial Gas Company- is the successor in interest by merger to (�'i) Book 4792 Page 274; Cape Cod Gas Company as of C 7/30/198L see Certificate and recorded in Book 3342 Page lei, and as Land Court Document No. (vii) Book 22494 Page 160 284825 **Boston Gas Company is the successor interest by merger to Colonial Gas Company as of 1/15/2020; see Articles of Merger recorded in Book 32806 Page 171, and as Land Court Document No. 119171-6 JOHN F. MEADE, ASSISTANT RECORDER BARNSTABLE REGISTRY LAND COURT DISTRICT RECEIVED E RECORDED ELECTRONICALLY