Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
792-792-116 (1)
58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:4/15/2026 Contract Number:146 Concrete Supplier:Cape Cod Ready Mix PLACEMENT INFORMATION Date Cast: 4/8/2026 Time Cast: 10:25 AM Date Received: 4/9/2026 Placement Location:SPR WALLS 1 AND 10 (H10) Placement Method:PUMP Cylinders Made By:Mohammed Rifaz Material Type:Concrete Cylinders Placement Vol. (yd ):117.50 Aggregate Size (in):1 1/2 Cylinder Size:6 x 12 INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures:SIKA CONTROL 75, ENERGY SURCHARGE TEST RESULTS Slump (in) (C-143):8 Air Content (%) (C-231):4.8 Air Temp (°F):39 Conc. Temp (°F) (C-1064):56 Load Number:9 Mixer Num.:64 Ticket Num.:51214 Cubic Yards:11 Design (psi):4500 Batch 9:04 AM Arrive 9:45 AM Depart 10:30 AM Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-116E N 29.15 6 28.27 4/13/2026 Lab Unbonded 5 5 131.65 4660 792-116A N 29.15 6 28.32 4/15/2026 Lab Unbonded 7 3 146.5 5180 792-116B 29.05 4/22/2026 Lab 14 792-116C 29.2 5/6/2026 Lab 28 792-116D 28.05 5/6/2026 Lab 28 3 2 Remarks:Kaylie OSullivan Reviewed By