Loading...
HomeMy WebLinkAboutCOC request 4.16.2026939 main street rte 6a yarmouth port mass 02675 down cape engineering, inc civil engineers & land surveyors TRANSMITTAL April 17, 2026 FROM: Heather Cornell hcornell@downcape.com tel. (508) 362-4541 fax (508) 362-9880 Yarmouth Conservation RE: 14 Compass Drive, South Yarmouth Request for a Certificate of Compliance SE83-76 DCE#23-148 Campa na Method of Delivery: Email; In person drop off • Certificate of Compliance Administrative Checklist • WPA Form 8A • DCE, Inc. Statement • Site photo • Filing fee $150 CC: File CONSERVATION awmudawtiue eiec�t OFFICE e"apeaz af em"thv e Cglgn d 5n&w11"ticzn: • All filings must be made on Town of Yarmouth forms. • All applications must be submitted two weeks prior to the next scheduled Conservation Commission meeting. Refer to Meeting Schedule. • Failure to follow the Administrative Checklist shall result in an Administrative Incomplete Application and will not be scheduled for a Public Hearing. • Contact the Conservation Office if you need assistance. Su binitthW cut 2 t"ticy Hardcopy of the COC application mailed to or dropped off at the conservation Office In Town Hall. ✓ Signed statement from an Engineer or similar professional who prepared the approved plan stating the date of a recent site inspection and certifying compliance with the permit and outlining departures from the approved plan, if any exist. If mitigation planting was required, include planting date and confirm the required time has elapsed*. As -Built plan — *Refer to issued Order of Conditions: Special Conditions to determine if required*. PDF of the COC request including application, letter, and as -built plan (if needed) emailed to bdirienzo(cD-yarmouth.ma.us and ijerolimo(a-yarmouth.ma.us � Local filing fee. Refer to the Fee Schedule. Make check payable to "Town of Yarmouth" and include property address in memo. All -OrMs, Fee Schedule and Meeting schedule can be fou-nd at https://www.varmouth.ma.us/696/Filing-Forms. *Click Yarmouth Street Index for parcel -related Conservation documents. Yarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664-4492 Rev 12/2025 Tel. (508)-398-2231 Ext. 1288 • Fax (508)-398-0836 • TTD# (508) 398-2231 • bdirieznop_yannouth.ma.us L1Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands 1 WPA Form 8A — Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. Project Information Important: When filling out 1. This request is being made by: forms on the Anthony Campagna computer, use only the tab key to move your cursor - do not use the return key. 2 nnm Upon completion of the work 3. authorized in an Order of Conditions, the property owner must request a Certificate of 4 Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. 5. 74 Conifer Hill Mailing Address Plymouth City/Town MA State This request is in reference to work regulated by a final Order of Conditions issued to: Joanne Twohig Applicant 10-26-76 SE 83-076 Dated DEP File Number The project site is located at 14 Compass Drive Yarmouth Street Address City/Town 19 73 Assessors Map/Plat Number Parcel/Lot Number The final Order of Conditions was recorded at the Registry of Deeds for: Property Owner (if different) County Certificate (if registered land) This request is for certification that (check one): Book DEP File Number: SE83-076 Provided by DEP n9gFn Page ® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). ❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a.doc -- rev. 5/29114 Page 1 of 2 LlMassachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands , WPA Form 8A — Request for Certificate of Compliance SE83-076 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see htt ://www.mass. ov/eea/a encies/massde /about/contacts/find-the-massde -re ional-office- for-your-city-or-town. html). wpaform8a.doc -- rev. 5/29/14 Page 2 of 2 939 main street rte 6a yarmouth port mass 02675 land court surveys structural design site planning sewage system designs inspections permits down cape engineering, inc civil engineers & land surveyors March 30, 2026 Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 Ref: #14 Compass Drive South Yarmouth MA (SE 83-76) Dear Commission Members: tel. (508) 362-4541 fax (508) 362-9880 Daniel A. Ojala, P.E., P.L.S. Arne H. Ojala, P.E., P.L.S. Daniel E. Gonsalves, P.E., S.E. Craig I Ferrari, E.I.T., S.E. Phellyp T. Tonial, E.I.T., S.E. In 1976, the Commission issued an Order of Conditions for the construction of a swimming pool. A site visit was made in March 2026. All work has been completed, and the site was found to be in substantial compliance with the approved Site Plan. This is to certify, to the best of my knowledge and belief, that the work was performed in substantial compliance with the approved plan and Order of Conditions. We respectfully request the issuance of a Certificate of Compliance. Thank you for your consideration. Very truly yours, L-':�LA v Daniel A. Ojala, PE, PLS Down Cape Engineering, Inc. I