HomeMy WebLinkAboutPrecons meeting 4.23.2026A,
o,,fYarmouth Conservation Commission
o o Pre-Construction Meeting
DEP File Number SE83-2512
Date:C// Z V Z.•' CG
Applicant Harbor Haven Assoc. Inc.
Address 26 Grandview Drive
Company Contact
Info:
1-t c k Mc 1,G 6' jJ(1 ' -- "L c
1
Signature of Acknowledgement: My signature acknowledges that I read and understand the Order of Conditions,
including the special conditions per the Yarmouth Conservation Commission. A copy of the Order of Conditons will
remain onsite for the duration of the work.
iviuti26V' i
Erosion Control Maintenance: It is your responsibility to maintain your sedimentation and erosion control in good working
order.
Final Stabilization and Erosion Control Removal: It is your responsibility to ensure permanent stabilization of the site and
remove and properly dispose of your sedimentation and erosion control once the site is fully stable.
Certificate of Compliance: It is your responsibility to request and secure from the Conservation Commission a Certificate
of Compliance once the project has been completed.
Order of Conditions Recorded?
CQi File Number Sign Up?
a Erosion Control: Your sediment and erosion control has been properly installed in the appropriate location(s)
You MAY/ MAY NOT begin work.
Other Comments:
v
s 'r`t
1A +._ ,A Q ) (\v 5 '
I IF 1 i r 5
9 C )-1 170 C.\{\ , 1 l: '.,?
7 g
Sand shall not be placed below the visible high tide line, and a 2 foot buffer must be maintained from all
existing vegetation. Confirm in writing once planting is complete.