Loading...
HomeMy WebLinkAboutPrecons meeting 4.23.2026A, o,,fYarmouth Conservation Commission o o Pre-Construction Meeting DEP File Number SE83-2512 Date:C// Z V Z.•' CG Applicant Harbor Haven Assoc. Inc. Address 26 Grandview Drive Company Contact Info: 1-t c k Mc 1,G 6' jJ(1 ' -- "L c 1 Signature of Acknowledgement: My signature acknowledges that I read and understand the Order of Conditions, including the special conditions per the Yarmouth Conservation Commission. A copy of the Order of Conditons will remain onsite for the duration of the work. iviuti26V' i Erosion Control Maintenance: It is your responsibility to maintain your sedimentation and erosion control in good working order. Final Stabilization and Erosion Control Removal: It is your responsibility to ensure permanent stabilization of the site and remove and properly dispose of your sedimentation and erosion control once the site is fully stable. Certificate of Compliance: It is your responsibility to request and secure from the Conservation Commission a Certificate of Compliance once the project has been completed. Order of Conditions Recorded? CQi File Number Sign Up? a Erosion Control: Your sediment and erosion control has been properly installed in the appropriate location(s) You MAY/ MAY NOT begin work. Other Comments: v s 'r`t 1A +._ ,A Q ) (\v 5 ' I IF 1 i r 5 9 C )-1 170 C.\{\ , 1 l: '.,? 7 g Sand shall not be placed below the visible high tide line, and a 2 foot buffer must be maintained from all existing vegetation. Confirm in writing once planting is complete.