Loading...
HomeMy WebLinkAboutBulkhead Site Plan 7.23.2025-$ REMO 14f ROCKS PROPOSED 67't , - RECONSTRUCTED RULKHEAD; FROM ­` IN FRONT OF - WALL; OP IONAL TO T.O.W. = 5.9'; MOVE 1.5'± MOVE FL AT LANDWARD TO MATCH A ANDWA ADJACENT WALL 6 X24. S 1 40 AB.FUOAT 2 Tj j r° EX' BU`K5.9' . &4 I -4 ! 13 I I PROPOSED MIT ';OF WORK CCESS JNQ II I DECK 9 ■ , I C oil EXISTING o� ,`ir DWEIfING --per. ' x A 44 0 P GRAVEL DRIVEWAY MAP 19 PARCEL 72 N/F JOHN MATTHEW BURR 15 COMPASS DRIVE SOUTH YARMOUTH, MA 02664 SITE PLAN (EXISTING AND PROPOSED 10 5 0 10 20 40 1 "=20' TOP OF WALL SHALL BE 5.9' (TO MATCH ADJACENT WALL), MAXIMUM UNBLANCED FILL= 10 FEET 20' MINIMUM EMBEDMENT I. SHALL DEVELOP 18K MIN. _ PROPOSED CONT, P.T. EXISTING GRADE 3"x6" BACK WALE MAP 19 PARCEL 74 N/F MICHAEL T. KEATING 10 COMPASS DRIVE SOUTH YARMOUTH, MA 02664 50-FOOT OFFSET FROM TOP OF WALL; (ALL R_ OTHER OFFSETS INCLUDING RIVERFRONT X OFFSETS ARE OFF THE PROPERTY) R PROPOSED CAP; SEE DETAIL PROPOSED CONT. GREENHEART 8"x8" ANCHOR WALE 15' ---� 1" DOCK WASHERS EXCAVATE TO/'� 1"0 THREADED FACILITATE ROD ADAPTER INSTALLATION OF TIE BACK NEW 1 1/2"0 CHANCE HELICAL SCREW ANCHOR ---�_ TYPE SS5 1Y2" X 5' WITH 8" & 10" and 12" FLIGHTS @ 7'-0" O.C. MINIMUM ANCHOR PENETRATION EXISTING GRADE SHALL BE 20', AND DEVELOP 18 KIPS MINIMUM PROPOSED SHOREGUARD CL 9900 ANCHOR FORCE PER ANCHOR VINYL SHEETING, 20 FEET LONG 10-FOOT BULKHEAD ELEVA TION DETAIL 2.5 9 25 5 10 SCALE: 1 "=5' -13 SITE PLAN (EXISTING AND PROPOSED) 5 2.5 0 5 10 20 1 "=10' 8"X8" PGREENHEART 3 2't PROPOSED SHOREGUARD / CL 9900 VINYL SHEETING, 20' LONG MINIMUM PROPOSED N" THRU-BOLTS; 2' O.C. (TYP) PROPOSED CHANCE HELICAL ANCHORS; 6' SPACING, (TYP) 6'f 10-FOOTBULKHEA0 PLAN VIEW DETAIL LSCSF LAND UNDER OCEAN EXISTING WALL (TO BE RELOCATED LANDWARD) TOP OF RELOCATED WALL SHALL BE REMOVE 14t ROCKS FROM IN FRONT OF WALL; 5.9' (TO MATCH ADJACENT WALL), OPTIONAL TO MOVE FLOAT LANDWARD 1 0.00 MAXIMUM UNBALANCED FILL= 10' 10.00 0.00 INSTALLATION OF TIE BACK EXCAVATE TO FACILITATE -10.00 0+ 00.00 0+ 25.00 EXISTING 6'X24' FLOAT MHW = 1.1' FORCED MLW = -1.8' (FORCED) ®' 0 • • • . . . • • 3' -.AAAI W = -& A, EXISTING GRADE 0+50.00 SECTION A -A (EXISTING AND PROPOSED 5 4 5 10 20 1 "=10' 10.00 0+ 4.39 5 4 1 2 4 SCALE: 1 "=2LSCSF EXISTING WALL (TO BE RELOCATED SEAWARD) \ 10.00 t tt 20.00 0.00 CONS 1 RUCTION NOTES: E}C REFER TO NAVD88. CONTACT SHOREFRONT CONSULTING FOR ADDITIONAL ELEVATION INFORMATION . 1. ELEVATIONS AS NEEDED. 2. THE SCOPE OF WORK CONSISTS OF RECONSTRUCTING AND EXISTING PERMITTED AND LICENSED BULKHEADS IN THE SAME LOCATION, BUT RAISED UP TO MATCH • THE ADJACENT BULKHEAD TO THE EAST AT ELEVATION 5.9' (CAP ELEVATION). 3. THE RETURNS ON BOTH ENDS OF THE WALL SHALL EXTEND LANDWARD UNTIL IT MEETS ELEVATION 5.9' AND SHALL CONTAIN ANY FLOOD WATERS ON THE APPLICANT'S PROPERTY. 4. APPROXIMATELY 13f CUBIC YARDS OF CLEAN FILL SHALL BE BROUGHT ONTO THE SITE TO RAISE THE GRADES BEHIND THE BULKHEAD ALONG THE RIVER SIDE ONLY AND ACCORDING TO THE PLAN. ALL SOIL SHALL BE COMPACTED IN LIFTS. 5. CONSTRUCTION ACCESS SHALL BE FROM THE APPLICANT'S PROPERTY OR FROM A WORKING BARGE. EQUIPMENT SHALL BE STORED ON THE APPLICANT'S PROPERTY OR THE WORKING BARGE WHEN NOT IN USE. WORKING BARGE TO BE ANCHORED TO AVOID BOTTOMING OUT DURING PERIODS OF LOW TIDE. 6. THE WORK ACTIVITY SHALL OCCUPY A MINIMUM AREA TO ACCOMPLISH THE INSTALLATION OF THE BULKHEAD. EQUIPMENT AND MATERIALS HANDLING SHALL BE IN ACCORDANCE WITH THE WORK PROTOCOL SUBMITTED WITH THE NOTICE OF INTENT, THE RESULTING ORDER OF CONDITIONS AND AS DIRECTED BY THE YARMOUTH CONSERVATION AUTHORITIES. 7. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RETURNED TO THEIR PRE -CONSTRUCTION CONDITION, ALL WORK SHALL BE INSPECTED BY SHOREFRONT CONSULTING AND RECEIVE APPROVAL BEFORE REMOVING EQUIPMENT FROM THE SITE. 8. THE ACCESS ROUTE AND WORK SITE SHALL BE CLEANED AND RESTORED TO RESEMBLE THE PRE -CONSTRUCTION CONDITIONS. 9. THE CONTRACTOR SHALL OBTAIN A COPY OF THE ORDER OF CONDITIONS ISSUED FOR THE PROJECT BY THE YARMOUTH CONSERVATION COMMISSION PRIOR TO THE START OF ANY WORK. 10. ANY TIMBER USED IN THE WATER SHALL NOT BE CCA PRESSURE TREATED. ALL HARDWARE SHALL BE GALVANIZED OR STAINLESS STEEL, UNLESS OTHERWISE APPROVED BY OWNER OR SHOREFRONT CONSULTING. 11. ANY DEBRIS OR MATERIAL THAT ENTERS THE WATER DURING CONSTRUCTION SHALL BE REMOVED IMMEDIATELY. 12. FOR SECTION A -A IN THE CANAL, REFER TO STRUCTURAL DRAWING ENTITLED "PLAN SHOWING 10' ENGINEERED VINYL BULKHEAD", BY SHOREFRONT O CONSULTING, AND STAMPED BY MARK MCKENZIE, P.E., DATED 12/12/12 FOR BULKHEAD DETAILS. THE CL9900 SHEETING SHALL BE UTILIZED TO REPLACE THE CL9000 MATERIAL WHICH IS NO LONGER AVAILABLE. THE CL9900 HAS A SECTION MODULUS OF 20 WHERE THE CL9000 HAD A SECTION MODULUS OF 16.4; THEREFORE, THE CL9900 IS A SUITABLE REPLACEMENT AND SHALL BE USED. Sol - 13. THE BULKEHAD ALONG THE CANAL SHALL BE RAISED TO ELEVATION 5.9, AND RELOCATED LANDWARD TO MATCH THE EXISTING ADJACENT WALL TO THE EAST. 14. FOR SECTION B-B IN THE RIVER, REFER TO STRUCTURAL DRAWING ENTITLED "PLAN SHOWING 12' ENGINEERED VINYL BULKHEAD", BY SHOREFRONT CONSULTING, AND STAMPED BY MARK MCKENZIE, P.E., DATED 2-22-2022 FOR BULKHEAD DETAILS. THE SHEETING SHALL BE 20 FEET LONG INSTEAD OF THE REQUIRED 18 x FEET, EXCEEDING THE DESIGN SPECIFICATIONS. 15. THE WALL ALONG THE RIVER SHALL BE RECONSTRUCTED DIRECTLY IN FRONT (SEAWARD) OF THE EXISTING WALL TO AVOID CATASTROPHIC FAILURE AND SEDIMENTATION INTO THE RIVER. THE EXISTING STONES FRONTING THE WALL SHALL BE REMOVED ONLY AS NEEDED TO ALLOW THE INSTALLATION. THE WALL SHALL BE INSTALLED WITHOUT TOUCHING THE FRONTING SALT MARSH. 16. THERE SHALL BE 6 INCHES OF CLEARANCE BETWEEN THE GRADE DIRECTLY BEHIND THE BULKHEAD AND THE TOP OF THE SHEETING. THIS PUTS THE CAP HEIGHT APPROXIMATELY 1.5 INCHES HIGHER THAN THE SHEETING. 17. THE EXITING ROCKS BETWEEN THE FLOAT AND THE EXISTING BULKHEAD SHALL BE REMOVED. THE FLOAT CAN BE MOVED LANDWARD AT THE APPLICANT'S OPTION, AND ONLY FAR ENOUGH TO MAINTAIN 3 FEET OF CLEARANCE AT LOW TIDE. 18. INSTALL TWO FENDER PILES ON OUTER ANGLE OF WALL TO FACILITATE FURTHER ANCHORING IF NEEDED. TOP OF WALL SHALL BE 5.9' (TO MATCH ADACENT WALL) MAXIMUM UNBALANCED FILL= 12 FEET. 20' MINIMUM EMBEDMENT SHALL DEVELOP 20K MIN. EXISTING GRADE PROPOSED CONT. P.T. 2 x6 BACK WALE RESOURCE AREA TABLE TOTAL LOT SIZE = 10.890+L- SQ. FT. DEED.) AREA WITHIN THE 100' BUFFER AND RIVERFRONT AREA = 10.890t SO. FT. AREA WITHIN THE 100'-200' RIVERFRONT AREA = 0 (BEYOND LOT) LAND SUBJECT TO COASTAL STORM FLOWAGE EXISTING 10,890f SO. FT. PROPOSED = NO CHANGE STRUCTURES WITHIN THE 0'-35' BUFFER OF MHW (RIVERFRONT ARE EXISTING =120f LINEAR FEET OF BULKHEAD (NO RETURNS). EXISTING DWELLING, POOL, AND DECKING = 1,695i SO. FT, PROPOSED =NO CHANGE PROPOSED MITIGATION; REPLACEMENT OF EXISTING; NO MITIGATION IS PROPOSED. STRUCTURES WITHIN THE 35'-50' BUFFER OF COASTAL BEACH EXISTING = 1,695i SQ. FT. NO CHANGE PROPOSED PROPOSED TIMBER CAP; SEE DETAIL (AW-1500 STRUCTURES WITHIN THE 50'-100' BUFFER OF 100' RIVERFRONT AREA ALUMINUM CAP OPTIONAL) EXISTING = 344t SQ. FT. PROPOSED = NO CHANGE PROPOSED CONT. GREENHEART 8"x8" ANCHOR WALE (WB-6 z ALUMINUM WALE OPTIONAL) 2'± 3.5'f 8" X 8" GREENHEART ANCHOR WALE 11 OR WB-6 ALUMINUM WALE (OPTIONAL) P 1A�--i �,/ -�� 1" DOCK WASHERS EXCAVATE TO FACILITATE 1" 0 THREADED INSTALLATION ROD ADAPTER OF TIE BACK EXISTING GRADE NEW 1 1/2"0 CHANCE HELICAL SCREW ANCHOR _- TYPE SS5 1Y2" X 5' WITH 8" & 10" FLIGHTS @ 6'-0" O.C. MINIMUM ANCHOR PENETRATION SHALL BE 20', AND DEVELOP 20 KIPS MINIMUM PROPOSED SHOREGUARD ANCHOR FORCE PER ANCHOR SG 825 VINYL SHEETING, 20 FEET LONG MIN. 12-FOOT BULKHEAD ELEVATION DETAIL 2.5 0 2.5 5 10 SCALE: 1 "=5' LAND UNDER OCEAN TOP OF RELOCATED WALL SHALL BE 5.9' (TO MATCH ADJACENT WALL), MAXIMUM UNBALANCED FILL= 12' 10.00 PROP. GRADE EL 5.3' - REMOVE EXISTING S TO FACILITE SHEETING _ ONES AS NECESSARY GRADE INSTALLATIO MHW = 1.1' FORCED _.. I ........................ MLW-�.$' •(FORCED). . P EXISTING GRADE 0+.25.00 0+50.00 AREA UNDER FILL CURVE = 6.4t SQUARE FEEil LENGTH OF FILLED AREA =53f FEET TOTAL FILL VOLUME = 13t CUBIC YARDS SECTION B-B (EXISTING AND PROPOSED 5 0 5 10 20 1 "=10' -20.00 70+77.27 2" X 6" BACK WALE I PROPOSED SHOREGUARD SG 825 VINYL SHEETING, 20' LONG MIN. PROPOSED �/4" THRU-BOLTS; 2' O.C. (TYP) PROPOSED CHANCE HELICAL ANCHORS; 5' SPACING, (TYF 5' MAXIMUM SPACING 12-FOOT BULKHEAD PLAN VIEW DETAIL 5 4 1 2 4 mod MEN" SCALE: 1 "=2' 2"x8" 2"x8" X co X CV N 2"x8" CAP TOP VIEW (ALTERNATE) CAP TOP VIEW BULKHEAD (2) 2" X 8" P.T. CAP; f W/ )`" GALV. BOLTS 0 3' Q.G. (TYF) Y" GALV. LAG BOLTS 0 3' O.C. (TYP) (ALTERNATE I WITH CAP THRU-BOLTS (TYP) (2) 2" X 4" P.T. CAP SUPPORTS; W/ 1�" GALV. BOLTS 0 3' O.C. (TYP) SHOREGUARD CL 9900 SHEETING (TYP) CAP DETAIL 5 0 1 2 4 SCALE: 1 "=2' DICE #23- > 48 LOCUS MAP SCALE 1 "=2000't LEGEND MHW MEAN HIGH WATER MLW MEAN LOW WATER 2 ELEVATION CONTOUR PROPERTY LINE SURVEY NOTES: RECORD OWNERS, T❑NY AND JANE CAMPAGNA 74 C❑NIFER HILL PLYM❑UTH, MA 02360 ASSESSORS MAP 19, PARCEL 73 DEED BK, 8899, PG. 132 PERMIT REFERENCES; 1) SE83-1336 (1995) 2) C❑C FOR SE83-1336 (1997) 3) DEP LICENSE 5705 (1996); ESTIMATED EXPIRATI❑N DATE OF JUNE 2032 PROPERTY LINES DEPICTED HEREON ARE BASED ON A FIELD SURVEY BY DOWN CAPE ENGINEERING IN AUGUST OF 2023 AND COMPILED FROM PLANS ON RECORD RECORDED IN THE BARNSTABLE COUNTY REGISTRY OF DEEDS. WORK AREA LIES WITHIN FLOOD ZONES AE (EL. 11') PER FIRM PANEL #588 OF 875, COMMUNITY MAP NUMBER 25001 CO588J EFFECTIVE DATE JULY 16, 2014 AS SHOWN ON THE FEMA ON-LINE DATA BASE. DATUM FOR ALL ELEVATIONS = NAVD 88 MEAN HIGH WATER = 1.1' NAVD 88 MEAN LOW WATER = -1.8' NAVD 88 THE PROJECT IS NOT WITHIN AN NHESP BOUNDARY AND IS THEREFORE NOT SUBJECT TO MESA REVIEW THE 50-FOOT OFFSET FROM THE BULKHEAD (RIFERFRONT AND RESOURCE AREAS) IS SHOWN ON THE PLAN. ALL OTHER RESOURCE AREA OFFSETS (100' BUFFER; 100 AND 200 FOOT RIVERFRONT AREA) ARE OFF THE PROPERTY. nATF DANIEL A. OJA A, P.E., L.` 5vnva^r� NO PART OF THIS DRAWING MAY BE USED BY ANY PARTY WITHOUT THE EXPRESS WRITTEN CONSENT OF SHOREFRONT CONSULTING AND DOWN CAPE ENGINEERING, INC. NO. DATE REVISION BY SHEET TTR.E -� PLAN SHOWING PROPOSED BULKHEAD RECONSTRUCTION PROJECT NO. SC-237 SCUE AS SHOWN DATE 7/23/25 PROJECT TONY AND JANE CAMPAGNA 14 COMPASS DRIVE SOUTH YARMOUTH MA DRAWN BY MCB CHECKED BY DO DRAWING NO. COMPAGNA.DWG DOWN CAPE ENGINEERING 939 MAIN STREET YARMOUTHPORT, MA 02675 (508) 362-4541 SHOREFRONT CONSULTING 290 CENTER STREET DENNIS PORT, MA. 02639 (508) 280-8046 WWW.SHOREFRONTCONSULTING.COM J OF 1 SHEETS