HomeMy WebLinkAboutCCOR 04-29-2026 792-127 to 792-129Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:4/29/2026 Client:Wright-Pierce Client Rep:Eric SaloWeather:Rain 46 - 50°F S.W.COLE Rep:Rob Reuter General Contractor:Wright Pierce Time Onsite:06:30 - 12:30 Placement Type: Footing  Wall  Slab  OtherPlacement Location:23,24,25 Concrete Placement Observations Observed Comments Required mix used Yes 1 1/2 inch aggregate 4500 psi mix E1. SIKI control 75. Concrete properly conveyed to all areas of placement Yes pump truck Internal vibration / consolidation of concrete Yes worm vibration Even layering around openings and embedments Yes concrete was evenly layered Around all openings and embedment Post placement observations (finishing, curing, etc.)Yes concrete was manually finished with a hand trowel Field Testing of Concrete performed:Yes *CYLINDER SET NO:792-127 to 792-129  *Refer to associated concrete test report Notes: S.W. Cole Engineering Construction Services Technician Robert Reuter arrived onsite at 6:30 AM for "Concrete Field Testing" and for the placement location referenced above. Upon arrival, met with Eric Salo with  CDM Smith who provided information about today's job duties.  Concrete was delivered by "Cape Cod ready mix." and was 1-1/2” 4500 PSI Concrete. A total of (240) cubic yards of concrete was placed. A sample was collected from load 2,12,21 and the standardized testing was performed with; three sets of (5) cylinders were cast from the load for laboratory compressive strength testing at 7, 14, and (2) 28 days. One cylinder was made for 'Hold' purposes. The results Truck two  •Slump 8-3/4” •Air 4.5 % •Temperature 60°   The results Truck twelve •Slump 9” •Air 3.8 % •Temperature 60°   The results Truck twenty one •Slump 8-1/2” •Air 3.8 % •Temperature 60°   Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Observations and Results of the Inspection were continually communicated to Client Representative Eric Salo from "CDM Smith ". Once the inspection was completed RR left the site. Attachments: 4 Photos Reviewed by:4/29/2026 Kaylie OSuivKaylie OSullivan Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com