Loading...
HomeMy WebLinkAboutCCOR 05-01-2026 792-130Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Project Name:Town of Yarmouth Water Resource Recovery Facility Project NO.:25-0468Location:Yarmouth MA Date:5/1/2026 Client:Wright-Pierce Client Rep:Eric SoloWeather:Partly Cloudy 48 - 50°F S.W.COLE Rep:Cassie Stelmash General Contractor:CDM Smith Time Onsite:06:14 - 09:45 Placement Type: Footing  Wall  Slab  OtherPlacement Location:Solids Handling Building Walls Concrete Placement Observations Observed Comments Required mix used Yes 4500 psi mix with 1 1/2" aggregate and Sika Control Concrete properly conveyed to all areas of placement Yes Pump Internal vibration / consolidation of concrete Yes Worm Vibrator Field Testing of Concrete performed:Yes *CYLINDER SET NO:792-130  *Refer to associated concrete test report Notes: S.W. Cole Construction Services Technician Cassie Stelmash arrived on site as schedule by Wright and Pierce for concrete field testing for the placement referenced above. Upon arrival CMS met with Eric Solo. Concrete was delivered by Cape Cod Ready Mix and was a 4500-psi mix with 1 1/2" aggregate and a Sika Control admixture and a total of 67 cubic yards were placed. A mid-load test for air, slump. and temperature was done on the first load taken from the truck. Results of the tests can be found below: Slump: 8 1/2" Air: 3.9 % Conc. Temp: 65  CMS also made one set of five cylinders (3,7,14,28,28) for laboratory compressive strength testing. Results of the testing were given verbally to Reisa from CDM Smith after testing was completed.  Attachments: 3 Photos Reviewed by:5/1/2026 Kaylie OSuivKaylie OSullivan Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Concrete Construction Observation Report The S.W.COLE field representative is on-site at the request of our client to provide construction materials testing and to observe and document construction activities. The Contractor has soleresponsibility for schedule, site safety, methods, completeness and quality control. 58 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com