HomeMy WebLinkAbout24 Raymond Disposal Permit-'\,ffi',The Commonwealth of Massachusetts
Town of Yarmouth
Board of Health
Dis sal em Construction Permit R ArEg
*
Construction shall be completed within six months of the date of this permit. A!! local conditions must be met.
The issuance of this permit shall not be construed as a guarantee that the system will function as designed.
Issued to Identify Name of Establishment Permit No.
PKM Contracting BHDC-26-49
Located at Identifv property address where work is being performed Date:
24 RAYMOND AVE, SOUTH YARMOUTH, MA, 02664 May 6,2026
Work to be Performed
Major Repair
To install per engineered plans replacement of a failed leaching system, new d-box h-20
Board of Health:
Hillard Boskey, M.D., Chairman
Mary Craig, Vice Chairman
Charles T. Holway, Clerk
Laurance Venezia, DVM
Eric Weston
Interim Health Director James G. Gardiner
Signature of Interim Health Director
Docusign Envelope ID: B1AB6AE4-CAA2-8D44-82A7-CFAA6574D0E8