Loading...
HomeMy WebLinkAbout24 Raymond Disposal Permit-'\,ffi',The Commonwealth of Massachusetts Town of Yarmouth Board of Health Dis sal em Construction Permit R ArEg * Construction shall be completed within six months of the date of this permit. A!! local conditions must be met. The issuance of this permit shall not be construed as a guarantee that the system will function as designed. Issued to Identify Name of Establishment Permit No. PKM Contracting BHDC-26-49 Located at Identifv property address where work is being performed Date: 24 RAYMOND AVE, SOUTH YARMOUTH, MA, 02664 May 6,2026 Work to be Performed Major Repair To install per engineered plans replacement of a failed leaching system, new d-box h-20 Board of Health: Hillard Boskey, M.D., Chairman Mary Craig, Vice Chairman Charles T. Holway, Clerk Laurance Venezia, DVM Eric Weston Interim Health Director James G. Gardiner Signature of Interim Health Director Docusign Envelope ID: B1AB6AE4-CAA2-8D44-82A7-CFAA6574D0E8