Loading...
HomeMy WebLinkAbout792-792-12958 Norfolk Ave, Easton, MA 02375 • Tel 508 822 6934 • www.swcole.com Report of Concrete Compressive Strength ASTM C31, ASTM C39, ASTM C1231 Project Name:Yarmouth MA - Town of Yarmouth Water Resource Recovery Facility - Concrete Testing Services Client:Wright-Pierce Project #:25-0468 Report Date:5/6/2026 Concrete Supplier:Cape Cod Ready Mix PLACEMENT INFORMATION Date Cast: 4/29/2026 Time Cast: 11:35 AM Date Received: 5/1/2026 Placement Location:SBR SLABS 23, 24, 25 Placement Method:PUMP Cylinders Made By:Rob Reuter Material Type:Concrete Cylinders Placement Vol. (yd ):240 Aggregate Size (in):1 1/2 Cylinder Size:6 x 12 INITIAL CURING CONDITION DELIVERY INFORMATION Temperatures Minimum (°F):Maximum (°F): Admixtures:MIX EL SIKA CONTROL 75 TEST RESULTS Slump (in) (C-143):8 1/2 Air Content (%) (C-231):3.8 Air Temp (°F):50 Conc. Temp (°F) (C-1064):60 Load Number:21 Mixer Num.:80 Ticket Num.:51601 Cubic Yards:11 Design (psi):4500 Batch 10:41 AM Arrive 11:23 AM Depart 11:48 AM Cylinder Designation Defect (Y/N) Cylinder Weight (lbs) Cylinder Diameter (in) Cross Sectional Area (in ) Date Of Test Cure Type Cap Type Age (Days) Fracture Type Load (kips) Strength (psi) 792-129A N 29.50 6 28.27 5/6/2026 Lab Unbonded 7 5 145.77 5160 792-129B 29.50 5/13/2026 Lab 14 792-129C 29.50 5/27/2026 Lab 28 792-129D 29.50 5/27/2026 Lab 28 792-129E 29.50 HOLD Lab 3 2 Remarks:Kaylie OSullivan Reviewed By